Loading...
ST9502-LR 960429CONCRETE COMPRESSIVE STRENGTH TES'I' Date of Service: Client No.: Client: Services: 4747 Irving Blvd., Suite #206 Dalim, Texas 75247 04/29/1996 48345000 Report No.: 963143 Project No.: 43-1059-96 Project: Garden Oak Estates Phase IV Kauffman & Broad of Texas, Inc. c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3700 psi ~ 28 Days 5" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 2.5 05/06/1996 I 2 2.5 05/06/1996 1 3 2.5 05/27/1996 1 4 2.5 05/27/1996 PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/29/1996 BATCH T~ME: N/A TIME SAMPLED: 8:53 am BY: Barry Cuble WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 6-5 AIR CONTENT (%): 4.7% PLACEMENT LOCATION: Partly cloudy, windy, and cool 52 F CONCRETE: 60 F TICKET NO: N/A UNIT WEIGHT (pet): N/A See Note* (sample location is on Crosshaven drive) SAMPLE LOCATION: 40 fi. N of S, 25 f. W ore curb ACCUMULATIVE YARDS: 230+ REPORT OF TESTS MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) Ohs. force) (ps0 7 160860 5690 7 156050 5520 28 28 FRACTURE TYPE Note*: Valley Ridge at Crosshaven Dr. between between 13-14; Crosshaven Dr. at Niagara Blvd., Appalachian Alley, section 14. sections 1-2; Niagara Blvd. west of section 1 Valley Ridge at Technician: Barry Cubic Report Distribution: (1) Kauffinan & Broad of Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 4:30 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRESSIVE STRENGTH TEST 4747 Irving Blvd., Suit~ #206 Dnlla% Texas 7S247 Date of Service: 04/29/1996 Client No.: 48345000 Client: Services: Kauffinan & Broad of Texas, Inc. c/o Midcrest Properties, Inc. 1721 W. Plano Parkway, Suite 131 Dallas TX 75075 Report No.: 963143 Project No.: 43-1059-96 Project: Garden Oak Estates Phase IV Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength smnples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3700 psi ~ 28 Days 5" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP SET NO. ('roches) 2 1 3.0 2 2 3.0 2 3 3.0 2 4 3.0 DATE TESTED 05/06/1996 05/06/1996 05/27/1996 05/27/1996 PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/29/1996 BATCH TIME: N/A TIME SaMPLED: 11:36 am BY: Barry Cuble WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 6- l AIR CONTm~rr (%): 5.4% PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE (days) 7 7 28 28 Sunny, windy, and cool 56 F CONCRETE: 66 F TICKET NO: N/A UNIT WEIGHT (pc0: N/A Please refer to the note on page 1 (sample location is on Valley Ridge) 18 ft. W of E, 8 iL N of S curb 230+ MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE Obs. force) (psi) TYPE 116470 116760 4120 4130 Technician: Barry Cuble Report Distribution: (I) Kauffman & Broad of Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 4:30 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc.