Loading...
SS9901-CN040826August 24, 2004 Sam Montoya, Project Manager S.J. Louis Construction of Texas 520 S. Sixth Street P.O. Box 834 Mansfield, TX 76063 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project #SS 99-01 Change Order #3 Dear Mr. Montoya: Attached are three original Charge Order #3's on the referenced project. Please execute the documents and return two of the originals to me. One of the originals is for your file. If you have any questions please feel free to give Rick O'Dell, Construction Inspector, a call at 972/304-7090. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 E-mail kgriffin@ci.coppell.tx.us CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Deforest Road Lift Station Improvements Force Main Lines A & B CONTRACTOR: S.J. Louis Construction of Texas Ltd. OWNER: City of Coppell CHANGE ORDER NO.: Three (3) DATE: August 23, 2004 DELETE: Item Description 1I-2 20" Ductile Iron Force Main by Bore (No Encasement) II-1 20" Ductile Iron Force Main Open Cut New Concrete Pavement Replacement New Saw Cutting of Existing Concrete New Removal/Excavation of Existing Concrete Quantity Unit Unit Price Total (45) LF 240.00 ($10,800) 45 LF 119.00 $5,355 17 SY 74.00 $1,258 1 LS 100.00 $100 1 LS 700.00 $700 Total Revision to Contract Amount Original contract mount Net decrease in contract amount/Change Orders 1 & 2 Revised contract amount Net decrease in contract amount/Change Ord. #3 Revised contract amount Net increase in contract time of completion Revised Contract time of completion ($3,387) $1,177,506.00 ($5,710.00) $1,171,796.00 ($3,387.00) $1,168,409.00 N/A N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Reco Engineer Date Acco~t~ Date Agreed to by Contractor Date Proposal Project Name Proposa! No. Date Deforest Road Lift Station Improvements 4 . 08/23/04 Force Main Lines "A" & "B .... Transmitted By Response Required By Adam Lunsford Mr. Rink O'Dcll Cc: Erika Cooper, P.E Estimator/Project Coordinator City of Coppell, Texas Via Fax: (972) 73%3001 Sig,,~rur~ 255 Parkway Blvd. Zoppell, Texas 75019 Fax: (972) 304-3570 ~e$cription of Work This proposal addresses the pavement repair and open-cutting of the concrete sidewalk for the playground at Sta. 41+30 of Line "A" on the above referenced prOJect. The original construction plans called for ~;his concrete pavement to be bored (Sta. 41,08 thru 41+53, Lme A ). Due to the timing of our construction and in the interests of promding a credit to thc Owner. The bore was deleted and the concrete was saw out, removed, and replaced once the 20" force main had been installed. This proposal represents a credit to the Owner for this change. This work has been completed at this time, please execute a project change order as soon as possible so that payment can be made for this work. If appropriate, please authorize this proposal with a signature and fax back to our office. ~reakdown of Proposal Deforest Road Lift Station Improvements - Force Main Lines "A" & Deletion of Bore From Sra. 41+08 thru Sra. 41+53, Line 'A" Item Description Units QuantiO' Unit Price E;ost _ Now Concrete Pavement Replacement SY t 7 $74.00 $1,258.00 New Saw curling of Existing Concrete LS I Sl 00.00 $100.00 New [~emoval/Excavation of Existing Concrete LS 1 $700.00 $700.00 1I-1 !20" D I Force Main by Open-Cut LF 45 $119.00 $5,355.00 11-2 20" DI Force Main by Bore ('No En¢~sement) LF (45) $240.00 ($10,800,00) Net Change (53,387.00) If accepiA~le, l~'r.~e prj;~jde al{ authgy'i?~atj~'fj(slgnature below and return one (1) copy to our o~ce, gJ~, £ouL* Construction Aenon Les V. Whitman, S.J. Louis Construction of Texas Ltd., LLP Project File &J. Louis Construction of Texas Ltd., LLP P,O, Box 834 Mansfield, Texas 76063 (817) # 77-0520 Office (817) 477-0552 Irax TOTAL P. O1