SS9901-CN040826August 24, 2004
Sam Montoya, Project Manager
S.J. Louis Construction of Texas
520 S. Sixth Street
P.O. Box 834
Mansfield, TX 76063
RE:
Deforest Road Lift Station Improvements Force Main Lines A & B
Project #SS 99-01
Change Order #3
Dear Mr. Montoya:
Attached are three original Charge Order #3's on the referenced project. Please
execute the documents and return two of the originals to me. One of the originals is
for your file.
If you have any questions please feel free to give Rick O'Dell, Construction
Inspector, a call at 972/304-7090.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
E-mail kgriffin@ci.coppell.tx.us
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT: Deforest Road Lift Station Improvements Force Main Lines A & B
CONTRACTOR: S.J. Louis Construction of Texas Ltd.
OWNER: City of Coppell
CHANGE ORDER NO.: Three (3) DATE: August 23, 2004
DELETE:
Item Description
1I-2 20" Ductile Iron Force
Main by Bore
(No Encasement)
II-1 20" Ductile Iron Force
Main Open Cut
New Concrete Pavement
Replacement
New Saw Cutting of Existing
Concrete
New Removal/Excavation of
Existing Concrete
Quantity Unit Unit Price Total
(45) LF 240.00 ($10,800)
45 LF 119.00 $5,355
17 SY 74.00 $1,258
1 LS 100.00 $100
1 LS 700.00 $700
Total Revision to Contract Amount
Original contract mount
Net decrease in contract amount/Change Orders 1 & 2
Revised contract amount
Net decrease in contract amount/Change Ord. #3
Revised contract amount
Net increase in contract time of completion
Revised Contract time of completion
($3,387)
$1,177,506.00
($5,710.00)
$1,171,796.00
($3,387.00)
$1,168,409.00
N/A
N/A
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract by
reason of this revision to the Contract.
Reco Engineer Date
Acco~t~ Date
Agreed to by Contractor
Date
Proposal
Project Name Proposa! No. Date
Deforest Road Lift Station Improvements 4 . 08/23/04
Force Main Lines "A" & "B .... Transmitted By
Response Required By Adam Lunsford
Mr. Rink O'Dcll Cc: Erika Cooper, P.E Estimator/Project Coordinator
City of Coppell, Texas Via Fax: (972) 73%3001 Sig,,~rur~
255 Parkway Blvd.
Zoppell, Texas 75019
Fax: (972) 304-3570
~e$cription of Work
This proposal addresses the pavement repair and open-cutting of the concrete sidewalk for the playground at
Sta. 41+30 of Line "A" on the above referenced prOJect. The original construction plans called for ~;his
concrete pavement to be bored (Sta. 41,08 thru 41+53, Lme A ). Due to the timing of our construction and
in the interests of promding a credit to thc Owner. The bore was deleted and the concrete was saw out,
removed, and replaced once the 20" force main had been installed. This proposal represents a credit to the
Owner for this change. This work has been completed at this time, please execute a project change order as
soon as possible so that payment can be made for this work.
If appropriate, please authorize this proposal with a signature and fax back to our office.
~reakdown of Proposal
Deforest Road Lift Station Improvements - Force Main Lines "A" &
Deletion of Bore From Sra. 41+08 thru Sra. 41+53, Line 'A"
Item Description Units QuantiO' Unit Price E;ost _
Now Concrete Pavement Replacement SY t 7 $74.00 $1,258.00
New Saw curling of Existing Concrete LS I Sl 00.00 $100.00
New [~emoval/Excavation of Existing Concrete LS 1 $700.00 $700.00
1I-1 !20" D I Force Main by Open-Cut LF 45 $119.00 $5,355.00
11-2 20" DI Force Main by Bore ('No En¢~sement) LF (45) $240.00 ($10,800,00)
Net Change (53,387.00)
If accepiA~le, l~'r.~e prj;~jde al{ authgy'i?~atj~'fj(slgnature below and return one (1) copy to our o~ce,
gJ~, £ouL* Construction Aenon
Les V. Whitman, S.J. Louis Construction of Texas Ltd., LLP