Loading...
Sandy Lk Addn L3-CS040902> DEVELOPMENT FEE TABLE Project: Sandy Lake Addition Lot 3, Block A Date: 9/2/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water hnpact Fee $1,400.00 ( 100% due at Issuance of Building Pemfit) Water Tap lospection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $60.52 (100% due at lssnance of Water Meter) Water Meter Fee (Irrigation/Firelinc) $60.52 (100% due at lssuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit $30.00 ( 100% due at [ssuancc of Water Meter) Wastewater Impact Fee $700.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% duc at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway lmpact Fee $5,745.60 $5,745.60 (100% due prior to Council Approval) Street Light Fee Inlbrmation not Available (100% due prior to Acceptance o1' Prqicct) II Street Sign Fee nlbrmation not Available (I 00% due prior to Acceptance of Project) 11 Construction Inspection Fee Inlk)rmation not Available ( 100% duc prior to Start of Construction) Il TOTAL $8,226.64 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,745.60 DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Addition Lot 3, Block A DATE: 9/2/2004 Water hnpact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's 0 = 0 ESU's Total 8: 5 ESU's @ $280.00 ea. '(Due prior to issuance of building permit) Water Tap Inspection Fee: Total 8: 2 Connections @ $50.00 ea. '(Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total 8: 1 Domestic Meter(s) @ $60.52 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total 8: 1 Irrigation Meter(s) @ $60.52 Total 8: 0 Additional Irrigation Meter(s) @ $0.00 Total 8: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 8: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 8: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2.5 (Due prior to issuance of building permit) $28000 ea. Wastewater Tap Inspection Fee: Total 8: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) tJtili~' Final Inspection Fee (All developments): Total 8: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $1,400.00 $1OO00 $6O.52 $60.52 $0.00 $0.00 $3O.OO $3O.OO $70000 $5O.OO $5O.OO Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $000 per unit (100% paid prior to Council approval of final plat) $0.00 $0,00 $5,745.60 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Sandy Lake Addition Lot 3, Block A 9/2/2004 ROADWAY IMPACT FEE: Service Area * 2 Category ** Office Land Use ** General Office Bldg. Building Area (sC) 4,800 Development Units ** 4.80 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway hnpact Fee due = (Development Units) x I(Vehiclc Miles per Development Unit) x (Fee per Vehicle Mile) $5,745.60 ~' (Figure 2 - Roadway hnpact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schcdulc 2, Pagc 3 - Roadway hnpact Fee Study)