Sandy Lk Addn L3-CS040902>
DEVELOPMENT FEE TABLE
Project: Sandy Lake Addition Lot 3, Block A
Date: 9/2/2004
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water hnpact Fee $1,400.00
( 100% due at Issuance of Building Pemfit)
Water Tap lospection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $60.52
(100% due at lssnance of Water Meter)
Water Meter Fee (Irrigation/Firelinc) $60.52
(100% due at lssuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $30.00
( 100% due at [ssuancc of Water Meter)
Wastewater Impact Fee $700.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% duc at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway lmpact Fee $5,745.60 $5,745.60
(100% due prior to Council Approval)
Street Light Fee Inlbrmation not Available
(100% due prior to Acceptance o1' Prqicct) II
Street Sign Fee nlbrmation not Available
(I 00% due prior to Acceptance of Project) 11
Construction Inspection Fee Inlk)rmation not Available
( 100% duc prior to Start of Construction) Il
TOTAL $8,226.64
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,745.60
DEVELOPMENT FEE WORKSHEET
PROJECT: Sandy Lake Addition Lot 3, Block A
DATE: 9/2/2004
Water hnpact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch = 2.5 ESU's
1 - 1 inch = 2.5 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total 8: 5 ESU's @ $280.00 ea.
'(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total 8: 2 Connections @ $50.00 ea.
'(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 8: 1 Domestic Meter(s) @ $60.52
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total 8: 1 Irrigation Meter(s) @ $60.52
Total 8: 0 Additional Irrigation Meter(s) @ $0.00
Total 8: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total 8: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 8: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 2.5
(Due prior to issuance of building permit)
$28000 ea.
Wastewater Tap Inspection Fee:
Total 8: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
tJtili~' Final Inspection Fee (All developments):
Total 8: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,400.00
$1OO00
$6O.52
$60.52
$0.00
$0.00
$3O.OO
$3O.OO
$70000
$5O.OO
$5O.OO
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
Preliminary plat approved:
After October 26, 1993
Single-family @ $0.00 per lot
Multi-family @ $000 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0,00
$5,745.60
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way
(See attached fee calculations if applicable)
Information not Available
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Sandy Lake Addition Lot 3, Block A
9/2/2004
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Office
Land Use ** General Office Bldg.
Building Area (sC) 4,800
Development Units ** 4.80
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway hnpact Fee due = (Development Units) x
I(Vehiclc Miles per Development Unit) x (Fee per Vehicle Mile) $5,745.60
~' (Figure 2 - Roadway hnpact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schcdulc 2, Pagc 3 - Roadway hnpact Fee Study)