Loading...
ST9302-CS 940628 (2)_Rady &. As _ tes, Inc. Engineers Architects Planners June 28, 1994 Ms. Maybeth Whaley GTE 2094 McGee Lane Lewisville, TX 75067 Sandy I_ake Road Paving, Drainage, and Water System Improvements Coppell, Texas (R&A No. 93021) Dear Ms. Whaley: Please review the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will be, on average, 2' to 3' lower than the grade of the existing roadway between Denton Tap Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require adch'tional information, please do not hesitate to call. Yours very truly, INC. RADY & ASSOCIATe, Greg D. Saunders, P.E. GDS/pb Encl. P:\93021.00~93021 LTR\UTILREVW. WP xc: v/Ken Griffin, City of Coppell 910 Collier Street · Fort Worth. Texas 76102-3542 · 817/335-6511 ° Metro 817/654-4266 · Fax 817/335-5070 ' ' r T ' Ti' ' Rady & Associates, Inc. Engineers · Architects · Planners June 28, 1994 Mr. Jack Hawkins Lone Star Gas Company Distribution Department 2601 Logan Dallas, TX 75215 Sandy Lake Road Paving, Drainage, and Water System Improvements Coppell, Texas (R&A No. 93021) Dear Mr. Hawkins: Please review the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will be, on average, 2' to 3' lower than the grade of the existing roadway between Denton Tap Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require additional information, please do not hesitate to call. Yours very truly, RADY & ASSOCIATES, INC. Greg D. Saunders, P.E. GDS/pb Encl. , p:\93021.00~021 LTR\UTILREVW. WP xc: VKen Griffin, City of Coppell 910 Collier Street · Fort Worth, Texas 76102-3542 ° 817/335-6511 · Metro 817/654-4266 · Fax 817/335-5070 ady Assomtes, hac. Engineers · Architects · Planners June 28, 1994 Ma'. Wess Rudd Lone Star Gas Company Transmission Department 1931 E. 6th Street Irving, TX 75060 Sandy Lake Road Paving, Drainage, and Water System Improvements (R&A No. 93021) Dear Mr. Rudd: Please review the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will be, on average, 2' to 3' lower than the grade of the existing roadway between Denton 'll~p Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require additional information, please do not hesitate to call. Yours very truly, RADY & ASSOCIATES, INC. GDS/pb En¢l. p:\9~021 .~/~021LTR\UTILRI!VW. WP xc: ~/Ken Griffin, City of Coppell 910 Collier Street · Fort Worth, Texas 76102-3542 · 817/335-6511 · Metro 817/654-4266 ° Fax 817/335-5070 Rady g Ass _ates, Inc. Engineers · Architects · Planners June 28, 1994 Mr. Jim Brookshire Texas Utilities TU Distribution 1506 Commerce 3-E Dallas, TX 75201 Sandy Lake Road Paving, Drainage, and Water System Improvements Coppell, Texas (R&A No. 93021) Dear Mr. Brookshire: Please review the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within 'the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will .be, on average, 2' to 3' lower than the grade of the existing roadway between Denton 'l~tp Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require additional information, please do not hesitate to call. Yours very truly, RADY & ASSOCIATES, INC. P.E. GDS/pb Encl. p:\93021.00t~93021LTR\UTILRI~VW. WP xc: veKen Griffin, City of Coppell 910 Collier Street · Fort Worth. Texas 76102-3542 ° 817/335-6511 ° Metro 817/654-4266 ° Fax 817/335-5070 Rady & Associates, Inc. Engineers · Architects · Planners June 28, 1994 Mr. W. Kyle Ray TH - Tnmsmission 115 W. 7th Street P. O. Box 970 Fort Worth, TX 76101-0970 Sandy Lake Road Paving, Drainage, and Water System Improvements (R&A No. 93021) Dear Mr. Ray: Please review, the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will be, on average, 2' to 3' lower than the grade of the existing roadway between Denton ~ Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require additional information, please do not hesitate to call, Yours very truly, RACY & ASSOCIATES, INC. Greg D. Saunders, P.E. GDS/pb Encl. C93021.00\93021 LTR\UTILP~VW. WP : Ken Griffin, City of Coppell 910 Collier Street · Fort Worth, Texas 76102-3542 · 817/335-6511 · Metro 817/654-4266 ° Fax 817/335-5070 _Rady & Associates, Inc. Engineers · Architects · Planners June 28, 1994 Mr. Donnie Dunn Paragon Cable 209 S. Rogers Irving, TX 75060 Sandy Lake Road Paving, Drainage, and Water System Improvements Coppell, Texas (R&A No. 93021) Please review the attached preliminary plans for conflicts with existing utility lines and for planning of relocation of your utility lines within the Sandy Lake Road project area. The existing roadway is being replaced with a four lane boulevard which may be expanded to six lanes in the future. The grade of the proposed roadway will be, on average, 2' to 3' lower than the grade of the existing roadway between Denton Tap Road and MacArthur Boulevard, causing vertical conflicts between proposed improvements and existing utilities. If you have any questions or require additional information, please do not hesitate to call. Yours very truly, RADY & ASSOCIATES, INC. Greg D. Saunders, P.E. ODS/pb End. XC9~021.00~93021 LTR\UTILR~VW. WP : Ken G~n, Ci~ of CoppeH 910 Collier Street · Fort Worth. Texas 76102-3542 · 817/335-6511 · Metro 817/654-4266 · Fax 817/335-5070 Rady & Associates, Inc. Engineers · Architects · Planners June 28, 1994 Mr. W. David Rybum Dallas Water Utilities Wholesale Services Division city nan Dallas, TX 75201 Sandy Lake Road Paving, Drainage, and Water System Improvements Coppell, Texas (R&A No. 93021) Dear Mr. Ryburn: Please review the attached.preliminary plans to verify the limits of the relocation of the 30" Dallas Water Utilities main in Sandy Lake Road. The bulk of the relocation is driven by the depth of cut required for the roadway at .the crest of hills and depth of cover required on the 30" main in order to install air release valves. The existing main is shown to be left in place where it is a minimum of 2 feet below the bottom of the proposed subgrade. If you have any questions or require additional information, please do not hesitate to call. Yours very truly, RADY & ASSOCIATES, INC. GDS/pb EncL p:\9~021.0~3021 LTR\UTILREVW. WP xc: ~/Ken-- Griffin, City of Coppell 910 Collier Street · Fort Worth, Texas 76102-3542 ° 817/335-6511 · Metro 817/654-4266 · Fax 817/335-5070