Loading...
WA0001-CS000823SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 RONALD V, CONVqAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R, CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P,E. ROSS L, JACOBS. P.E. Advantage Co act Services, Inc. 7150 Atme Genoa Rd. August 2~k~000.~ Repainting of 1.5 Million Gallon Elevated Storage Tank Gentlemen: On Monday, August 7, 2000 a final walkthrough of the Repainting of the 1.5 Million Gallon Elevated Storage Tank project was conducted with the City of Coppell and a representative of Advantage Contract Services, Inc. At that meeting, it appeared all work was complete in accordance with the requirements of the project specifications. The City of Coppell accepts the project as fully complete and in service as of that date.. Using August 7, 2000 as the acceptance date, this project is 59 calendar days beyond the contract completion date established by the Notice to proceed dated March 3, 2000. The contract and project specifications allow for liquidated damages to be assessed in the amount of $500 per calendar day for each day the project remains incomplete beyond the established completion date. Based on the contract provisions the City of Coppell chooses to assess the full damages allowed under the contract, the amount totals $29,500. The enclosed tabulation itemizes the liquidated damages calculations. In addition, section SC.30.G. of the Special Conditions established that the City of Coppell was to provide the electric service and meter during construction of the project, while the contractor is responsible for the cost of the power used. Such cost were to be deducted from the mouthy pay request. ~-^ "': .... ~ ...... From our conversations with the City, we understand Pay Request Number 3, dated June 27, 2000 has not been paid. Therefore, we are re-issuing a preliminary copy of revised Pay Request Number 3 and Final along with two copies of the Contractor' s Affidavit of Final Payment and Waiver of Release. Please sign and return both copies of the Affidavit to this office. Enclosures cc: Mr. Kenneth M. Griffin, P.E. Mr. Glenn D. Hollowell, P.E. t,,~. Larry Davis ~ MONTItLY PAY REQUEST ~, Page I of 1 Owner: Project: CITY OF COPPELL, TEXAS Repainting of the 1.5 Million Gallon Elevated Storage Tank Interior From: l-Jun-2000 To: 7-Aug-2000 Contractor: Advantage Contract Services, Inc. 7150 Almeda Genoa Houston, Texas 77075 Item No. Description Unit BASE BID Abrasive Blasting the Interior Area of Tank L.S. Paint the Interior Area of the Tank L.S. Disposal of Interior Paint & Blasting Media Removed L.S. Miscellaneous Remedial Welding by a Certified Welder Hrs. 24" Motor Operated Butterfly Valve L.S. 1A Safety Climb Device on Existing Dry & Wet Ladders Electric Dehumidi~cation Sys. for Interior Blast, Paint & C L.S. Interior Wet Ladder Co #1 L.S. ADDIT1VE ALTERNATE L.F. Quantity in Revised Proposal Quantity 1 1 1 10 1 1 0 1 131 Pay Request No. Contract Date: February 8, 2000 Original Contract Amount: Revised Contract Amount: Project Start Date: 3-Mar-2000 Completion Date: 9-Jun-2000 3 (Revised & Final) $ 125,700.32 $ 127,075.32 Allotted: 98 Used: 157 Quantity Complete Total This Work Contract Extended Request Completed Price Amount 100% $45,000.00 $ 45,000.00 100% $45,000.00 $ 45,000.00 100% $5,000.00 $ 5,000.00 10 $85.00 $ 850.00 100% $7,500.00 $ 7,500.00 100% $18,850.00 $ 18,850.00 100% $1,375.00 $ 1,375.00 131 $26.72 $ 3,500.32 Liquidated Damages Days 59 ($500.00) $ (29,500.00) Prepared and Submitted by: SHIMEK, JACOBS & FINKLEA, L.L.P. Consulting Engineers, Dallas, Texas FY . Hen ~75oved for st 2 , By: Date: Total Amount Less Amount Retained Total Amount Payable Less Previous Payments Amount Due This Request 0% $ 97,575.32 $ $ 97,575.32 $ 67,106.25