Loading...
ST9302-CS 940517Rad¥ & Associates, Inc. Engineers · Architects · Planners May 17, 1994 Mr. Ken Griffin, P.E. Assistant City Manager City of Copper 255 Parkway Blvd. CoppeR, TX 75019 Copper - Sandy Lake Road and 24" Water Line Copper No. ST 93-02 R&A No. 93021.00 Dear Ken: As you are aware, Rady & Associates has completed the water system evaluation for Sandy lake Road reconstruction. This evaluation was to determine whether the City of Coppell's water system could supplement Flower Mound's winter demand while the 30" Dallas Water Utility (DWU) main was taken out of service. This evaluation required input of the City of Coppell's complete water system data base model. Now that we have this model in our computer, should you desire to evaluate other segments of the water system, this can be done with relative ease. The time necessary to run a chosen scenario of 1-3 new pipe segments within the system, and follow-up with a letter report of the results, would take approximately 5 hours of engineering and clerical time (approximately $400.00). If you have any questions or we can be of further service, please let us know. Sincerely, RADY & ASSOCIATES, INC. Wm. Bennett Ratliff, P.E. Vice-President P:\93021.00\93021 LTR\WTREVAL.WP 910 Colller Street · Fort Worth, Texas 76102-3542 · 817/335-6511 · Metro 817/654-4266 · Fax 817/335-5070