Loading...
WA0001-CS000808SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglos Avenue, #820 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDR/CKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. Dallas, Texas 75225-5816 Fax (214) 361-0204 August8,2000 Phone (214) 361-7900 Mr. Glenn Hollowell, P.E. Assistant Director of Public Works City of Coppell 732 Deforest Coppell, Texas 75019 Re: Repainting of the 1.5 Million Gallon Elevated Storage Tank Final Walkthrough Dear Mr. Hollowell: On Monday, August 7, 2000 we attended a final walkthrough of the Repainting of the 1.5 Million Gallon Elevated Storage Tank project with you and a representative of Advantage Contract Services, Inc. At that meeting, it appeared all work was complete in accordance with the requirements of the project specifications and you indicated the project is acceptable. Using August 7, 2000 as the acceptance date, this project is 59 calendar days beyond the contract completion date. The contract and project specifications allow for liquidated damages to be assessed in the amount of $500 per calendar day for each day the project remains incomplete beyond the established completion date. If the City chooses to assess the full damages allowed under the contract, the amount totals $29,500. The enclosed tabulation itemizes the liquidated damages calculations. In addition, section SC.30.G. of the Special Conditions established that the City of Coppell was to provide the electric service and meter during construction of the project, while the contractor is responsible for the cost of the power used. Such cost were to be deducted from the mouthy pay request. To date no charges for power have been assessed against this contract. Prior to closing this contract and making final payment to the contractor, we request the City advise us on their intentions for assessment of liquidated damages and electric power cost on the project. We are available to discuss this project further at your convenience. Sincerely yours, Enclosure cc: Mr. Kenneth M. Griffin, P.E. Mr. Lan'y Davis Gary C. Hendficks, P.E. City of Coppell Repainting of the 1.5 Million Gallon Elevated Storage Tank Calculation of Liquidated Damages Contract Completion Dates: Re-paint May 2, 2000 Ancillary:Work June 9, 2000 Project Completion Dates: Re-paint May 2, 2000 Ancillary Work August 7, 2000 Calander Days beyond Contract Completion Date Re-paint 0 days Ancillary Work 59 days Liquidated Damage Rate Re-paint $500 per day Ancillary Work $500 per day Accumulated: $1,000 per day Calculated Liquidated Damages: Re-paint $0 Ancillary Work $29,500 Project Total: $29,500 Reference: SC,32 Time of Completion; Addendum No. 3 dated January 26, 2000; Project Notice to Proceed dated March 3, 2000; Letter dated May 26, 2000 Field Inspection by Hollowell & Hendricks, Aug. 7, 2000 SC.32 - Time of Completion