Loading...
ST9302-CS 940218The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 February 18, 1994 The Ginn Corporation Mr. Wayne Ginn, P.E. P.O. Box 796577 Dallas, Texas 75379-6577 Re: Map for Hydrologic Analysis Dear Mr. Ginn: At the February 8, 1994 City Council meeting, the Engineering Department brought forth an agenda item to adjust the design contract with Rady and Associates to provide for the creation of water map/computer information to generate "what if" games on providing water to Flower Mound during the construction of Sandy Lake Road. You may recall that the City had worked with you previously to ascertain whether this information was available as part of the Water Master Plan generated by your firm in 1991. Our last correspondence from your office was in September, 1993 in which you stated that you had reviewed your files and were unable to locate the map that would show the location of all the nodes and pipes used in modeling the water system for the Water Master Plan. The City Council approved the adjustment to Rady's contact; however, as paxt of the motion they instructed staff to contact your firm for reimbursement of the $10,000. It was the opinion of the City Council that this information should have been available from your firm upon request by the City. Therefore, the City of Coppell respectfully requests that Ginn Corporation reimburse the City of Coppell in the amount of $10,000 for the creation of water data necessary to evaluate our system due to the inability of your firm to produce that information. If you should have any questions are comments please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer CC: Jim Witt, City Manager Peter G. Smith, Attorney Steve Goram, Director of Public Works file/kgriffin/ginn.ltr