Loading...
ST9602-AG040824AGENDA REQUEST FORM COFFELL DEPT: Engineering Department DATE: August 24, 2004 ITEM #: 16 ITEM CAPTION: Consider approval to authorize the City Manager or designee to close MacArthur Blvd., north of Belt Line Rd. for improvements to the DART Railroad crossing on MacArthur Blvd. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE EXECUTIVE SUMMARY: Approval of this item will authorize the City Manager to allow the contractor to close MacArthur Blvd., north of Belt Line Rd., from 8:00 p.m., Friday, September 10, 2004 to 6:00 p.m., Sunday, September 12, 2004 for construction at the railroad crossing on MacArthur Blvd. Staffwill be available to answer any questions at the council meeting. Motion to Approve subject to the following conditions: 1) latitude to Jim Witt, City Manager, to negotiate in any way that he feels comfortable and will benefit the city, the time and date; 2) possibly change Friday night if the weekend can't be changed; and 3) install a temporary sign zone for St. Ann's to direct traffic for their carnival. M - York S - Suhy Vote - 7-0 v ::" FINANCIAL COMMENTS: Agenda Rcqacst Form - Revised 02/04 Document Name: #MacArthurDetourPlan-lAG MEMORANDUM w n �z(k FROM THE f DEPARTMENT OF ENGINEERING To: Mayor and City Council From: Kenneth M. Griffin, P.E., Director of Engineering/Public Works Date: August 24, 2004 RE: Consider approval to authorize the City Manager or designee to close MacArthur Blvd., north of Belt Line Rd., for improvements to the DART Railroad crossing on MacArthur Blvd. For several years now, the City of Coppell has been working with Dallas County concerning improvements to southbound MacArthur Blvd. at Belt Line Rd. to provide two southbound left - turn lanes for morning traffic movements. Council may recall that for several years now the City has had a companion project to extend a third southbound lane on MacArthur Blvd. from Bethel School to Belt Line. On January 8, 2004, TxDOT awarded a contract to Gibson and Associates, Inc. for the construction of the additional left -turn lane on southbound MacArthur Blvd. The start time for the project was January 24, 2004, and the contractor had 60 working days to complete it. On February 24, 2004, a preconstruction meeting was held on this project. At the preconstruction meeting I was somewhat surprised that DART was not represented at the meeting, given the fact that one of the major components of the widening of the roadway is the widening of the crossing of the DART right -of -way. When I questioned the absence of DART, I was informed that they had not responded to the preconstruction meeting notice. In April 2004, I was copied on correspondence from TxDOT to Dallas County concerning the fact that the plans did not address the detour to divert vehicular, as well as train traffic, during construction phasing for work within the DART right -of -way. Not only was it not addressed, but the contractor was now requesting additional compensation. Dallas County's response to the TxDOT letter was the same as my reading of the contract, the plans in no way stated that the road would need to be closed for any period of time for the DART crossing work. To date there have been numerous conversations between Dallas County, TxDOT and myself concerning this project and the proposed road closure. I have requested from TxDOT a schedule of the propose road closure since May 2004. Because of the time delay in getting this project started by TxDOT, our force main contractor has been working in the area. TxDOT has recently informed me that they wish to close the intersection at 8:00 p.m. September 10, 2004 until 6:00 P.m., September 12, 2004. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" The Traffic Control Plan we received is included. It is a hand-drawn plan generally showing proposed traffic movement, if the road is allowed to be closed for the weekend. The following would be the traffic movements: 1. Southbound MacArthur Blvd. would exit at Riverchase Dr. to Fairway Dr., turn west on Belt Line Rd., and then back south on MacArthur Blvd. to proceed in a southerly direction. 2. Northbound MacArthur Blvd. would turn east on Belt Line Rd., then take Fairway Dr. to Riverchase Dr. to north MacArthur Blvd. 3. East or west Belt Line Rd. would exit at Fairway Dr., turn onto Riverchase Dr., and then onto MacArthur Blvd. Staff will be available to discuss this at the Council meeting. "CITY OF COPPELL ENGINEERING . EXCELLENCE BY DESIGN" 74447 _ � r F �, r Rl ,a '�• r /K �' �t ik A . m S 4 le - Ci „ SE. FI �✓ � � : /�. (�:-• - - Wes• .. ( 7.�'� R; a �illalll F ; ;..,. AREA OF ROAD _ lL CLOSURE; ' EL - 777"777 E [� ROA all .. 'y` •. �+r - "�.. : -.. mow.. ,.� ..�..... � � �. " _. Traffic Movement Legend Proposed Road Closure Traffic Movement #1 y; MacArthur Blvd. at Belt Line Rd. '. Traffic Traffic Movement #2 ffic Movements a Traffic Movement #3 F� +� Created by S. Latta, 12 Aug '04 Created in G.LS. S:1ScottlArc View\misc_exhibits.apr \Cmaq detour 4