Loading...
WA0002-CS040901F~uz~an ~Z~yi~i S Rei G-oid~n T(Jang_l~Mobii~ H~me P~rk _ ~ -'~_ ' p=age 1. i From: To: Date: Subject: "Abel Saldana" <ASaldana@dallascounty.org> <staylor(~ci.coppell.tx.us> 9/1/2004 4:58:25 PM Re: Golden Triangle Mobile Home Park Suzan, FYI - The 28-day compressive strength breaks for the flowable backfill are due: 08/01/2004 O8~O2~2OO4 08~03/2004 O8~O4~2OO4 I have not contacted our testing lab, Team, because the last cylinder break is this Saturday. Next week we can assess the end result (as noted in the attached letter dated 08/23/2004) and discuss any other issues. Per the construction contract, Item No. 1-7, Flowable Backfill, has an estimated extension amount of $28,000 of which this estimate (#3) includes $15,440 for payment. The quantities and respective extension amounts in Estimate #3 are not Final. FYI - Our contractor, North Texas Contracting (NTC), has completed items totalling construction costs of $128,145.14 through Estimate #3 from a total construction contract of $175,547.00. Dallas County has paid NTC for Estimates #1 & 2 totalling $39,562.52. If you have any other concerns, please do not hesitate to contact me via Email, telephone, etc.. Thanks! Abel >>> "Suzan Taylor" <staylor@ci.coppell.tx.us> 09/01/04 04:08PM >>> Abel: We are in receipt of Estimate No. 3. Everything seems to be in order with the contract documents and pay items. However, Larry Davis has expressed concern about paying this estimate prior to resolving the issue related to the strength requirements of the flowable fill. We recently received the mix designs for the flowable fill and saw that fly ash was used. We have not allowed the use of fly ash as a replacement material in our cement. We did not receive the mix designs prior to placement of this material. Larry thinks that a meeting needs to be held with Coppell and Dallas County staff to resolve the issue over the apparent Iow psi. To this date, we feel that we may not have received all of the test reports related to this issue. Larry will be unavailable from September 5 to the 14 and he would like to resolve this issue prior to September 3. Suza, n T.aylor - Re: Golden Triangle Mobile Home park .... Pag~_2. j Thanks "Al Dominguez" <ADominguez@dallascounty.org>, "Alberta Robinson" <ARobinson@dallascounty.org>, "Donald Holzwarth" <DHolzwarth@dallascounty.org>, "Rachel Brown" <RBrown@dallascounty.org>, "Rick Loessberg RLoessberg@dallascounty.org>