Loading...
Vista Point II-CS040908· · ·'" · Halff Associates, Inc. ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS 8616 Northwest Plaza Drive Dallas, Texas 75225-4292 (214) 346-6200 Fax (214) 361-5573 TO: FROM: SUBJECT: MEMORANDUM The City of Coppell Attn: Mr. Keith Marvin P.E. DATE: 9-08-04 AVO: 22223 Clint Philpott Emaih Cphilpott @ halff.com PROJECT: Vista Point II Storm Drain System During the design of Vista Point II there were several locations where the existing storm drains were used to remove the storm water from the site. Provided are additional plans and this letter showing what the impacts were and how they affect the system, both up stream and down stream. Along State Highway there is a box culvert. The box culvert has a drainage area that covers Vista Point II and part of the Vistas of Coppell subdivision. Attached are the design plans for this box culvert. As can be seen, the culvert was designed to handle the runoff from the site. After the development of Vistas of Coppell, part of the culverts drainage area was changed and now enters the culvert at Station 39+80. Also on the plans we have added what the flow values will be after Vista Point II is developed. One flow is the flow directly from Vista Point II. The other flow is the cumulative flow for the box culvert. The final flow for the box culvert is 383.60cfs. Also attached is the Vistas of Coppell plan showing a 60" RCP, which connects to the before mentioned box culvert. Shown is the station along the 60' RCP where Vista Point II needs to tie an 18" RCP into, 2.9cfs. Hydraulic calculations were going to be made to check the effect of the additional flow on the system. On Vistas of Coppell plan, the 100Yr HGL drops at Sta. 2+55.32. This calculation seems to be wrong. We have not included any more calculations beyond this point because we are not sure how they calculated the HGL and our calculations would not give an accurate comparison of the impact of our additional flow. Again these additional plans were provided so that the impact of the storm drain design within Vista Point II could be seen. [] Attachments: Copies: File "', Halff Associates, Inc. ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS 8616 Northwest Plaza Drive Dallas, Texas 75225-4292 (214) 346-6200 Fax (214) 361-5573 TO: LETTER OF TRANSMITTAL The City of Coppell 255 Parkway Coppell, TX 75019 Attn: Mr. Keith Marvin P.E. DATE: AVO: FROM: B. David Littleton, P.E. PROJECT: Emaih dlittleton @ halff.com September 8, 2004 22223 Vista Point II Addition WE ARE SENDING YOU [] ATTACHED [] Shop Drawings [] Prints [] Plans [] Copy of letter [] Change order [] Other: THESE ARE TRANSMITTED as checked below: [] For approval [] Approval as submitted [] For your use [] Approved as noted [] As requested [] Returned for corrections [] For review/comment [] Other: [] Under separate cover via __ [] Drawings [] Resubmit [] Submit__ [] Return the following: [] Specifications copies for approval copies for distribution corrected prints ITEMS SENT: 2 Sets of "Grading, Utility, and Drainage" for Vista Point II 1 Strom Drain Letter 3 Storm Drain Plans COMMENTS: Keith, here is a plan set for grading, utility, and drainage on the Vista Point II Project (MacArth~r and 121). Please call me or Clint Philpott if you have any questions. Thanks! SIGNED: B. David Littleton, P.E., COPIES: [] FILE [] OWNER [] CONTRACTOR