Loading...
RC Townhomes-CS040915PEEBLES b ASSOCIATES CIVIL ENGINEERS/LAND SURVEYORS 1321 Brown Trail · Suite c · Bedford, September 14, 2004 Mr. Keith R. Marvin, P.E. City of Coppell 255 Parkway Coppell, Texas 75019 ~ 81L662-0123 RE: Riverchase Townhomes Construction Plans Review Comments fi.om Letters Dated August4 & September 2, 2004 Dear Mr. Marvin: In response to the above reference project we have the following commems: August 2, 2004 letter COVER SHEET- We have corrected the spelling of Mr. Stover's name PLAT -We have provided comer clip at the intersection of MacArther Blvd. There are two drainage easements shown now between lots 4 and 5 and lot 9and 10 The back lines have a 10' drainage and utlity easement notes The sanitary sewer is now cover by an easement (5 foot) The right-of-way is noted as 50 foot( street width should not be on the plat) GRADING PLAN-A detail of the retaining wall has been added The encroachment has been removed fi.om lot 9 We have added additioN_al spot grades We have corrected the throat of the Y inlet We have received a letter stating it is ok to drain and do grading on TXU GRADING PLAN 2-AIl headwaHs are now on our property We are now running a a mostly 1.0 % grade with our flattest being a 0.85% grade along north side. We have moved the inlet to the end of the cul-de-sac( East side) We are 3.0 foot offour property line with the top of wall which will allow the toe of the wall to be 1.0 feet of property DRAINAGE AREA MAP- The swale will collect the runoff from the bah fields without grading on the balLfields A table has been added Inlet is now at end of cul-de-sac Ditch is now without retaining wall HGL and other calculations have been added to storm drainage BETHEL SCHOOL COURT PAVING PLAN& PROHLE- Sidewalks are shown barrier flee to MacArthur Blvd. All Curb returns are now 30 FEET The street is noted as 28 foot Back to back