PA9702-LR 990506 (3)IN-PLACE DENSITY STING
8901 Carpenter Frwy., Suite #10~
Dallas, Texas 75247
Date of Service: 04/28/1999 Report No.: 9911949 Report Date
05/06/1999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~VReid 300 Block of Parkway Blvd
732 DeForest Coppell, Texas/Prj. #96051
Coppell TX 75019
Services: In-place density testing.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. Laboratory Test Method: ASTM D-698
Field Test Method: ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
Maximun~ Projt~t Require~nents
M/D No. Description Moisture % Density I~f Moisture Densay
I Dk to med brown silty clay 17.5 101.5 +3% or above 92%
FIELD DENSITY TESTS
TEST MfD MOISTURE DRY DENSITY DENSITY
NO TEST LOCATION No. (%) (pcf) (% max)
Moisture Conditioned
I Building Pad, Grid line H.5/13.5, 1st lift I 20.5 95.8 94
2 Building Pad, Grid line H.8/13, 2nd lift 1 21.0 96.7 95
3 Building Pad, Grid line H.5/13.8, 3rd lift I 20.8 97.8 96
4 Building Pad, Grid line H.5/9, 1st lift I 22.0 97.3 96
5 Building Pad, Grid line H.5/9.5, 2nd lift I 21.3 98.1 97
6 Building Pad, Grid line H.5/9.8, 3rd lift I 21.0 97.0 96
Test results on this report meet project specification.
Technician: Roy Montgomery