Mercantile P2-CS040915cOPPELL
September 15, 2004
Scott Caruthers, P.E.
Dowdey, Anderson & Associates
5225 Village Creek Dr, Suite 200
Piano TX 75093
RE: The Mercantile Addition, Phase 2
Construction Plan Review Comments
Dear Mr. Caruthers:
The City of Coppell has reviewed the revised plans for the referenced addition. These plans
meet our current minimum standards. You may now submit copies for the City Engineer's
stamp. The City of Coppell requires three sets of final construction plans for its use; your office
should submit as many additional sets for stamping as necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell.
All fees must be paid prior to release of this project for construction. Please refer to the
Development Fee Assessment letter of August 4, 2004 for a list of those fees. The City charges
a 2% inspection fee for all private construction outside the building's footprint. This would
include dirt work, paving, stom~ drain, water lines, sewer lines, drainage pipes, etc. that are
private. For all installations in public right-of-way, the City of Coppell charges a 4% fee. A
cheek for inspection fees made to City of Coppell should be submitted to this office along with a
copy of the contract(s) with the appropriate 2% and 4% calculations shown for verification
purposes.
There is a spreadsheet on the Construction Development Permit application for your convenience
in showing these contract costs. If you have any questions, please contact me at the number
shown.
Keith R. Marvin, P.E.
Civil Engineer
Office Phone: (972) 304-7044
Fax: (972) 304-3570
Attachment: Construction Development Permit application
255 PARKWAY 1~ P O BOX 478 3~ COPPELL TX 75019 1~ TEL 972/462 0022 ~{ FAX 972/304 3673