Loading...
Sandy Lk Addn L3-CS040917cOi:31V-ELL September 17, 2004 Keith M. Hamilton, P.E. Hamilton Consulting, Inc. 601 Harwood Rd Hurst, TX 76054 RE: Sandy Lake Addition, Lot 3 Block A (Dr. McAnelly) Plan approval letter Dear Mr. Hamilton: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards with the exception of the following comment: Please remove the curvature in the sanitary sewer line. Once this change has been made, please submit revised construction plan sets for the City Engineer's stamp. The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This would include dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in public right-of-way, the City of Coppell charges a 4% fee. A check for inspection fees made to City of Coppell should be submitted with the Construction Development Permit application with a copy of the contract(s) attached and the appropriate 2% and 4% calculations shown for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Keith R. Marvin, P.E. Civil Engineer Office: 972-304-7044 Fax: 972-304-3570 2§§ PARKWAY ~ P.OBOX 478 ~ COPPELL TX 75019 ~ TEL 972/462 0022 ~ FAX 972/304 3673