Loading...
St Andrews Est-LR040826 (2)ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: ST. ANDREWS LAND COMPANy, CARROLLTON, TEXAS PROJECT: ST. ANDREWS ESTATES COPPELL. TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 08/26/04 OUR REPORT NO.: 04219-19 TEST DATA: TEST ~ ELEV SOIL ID OPTtMUM MAXIMUM LAB IN PLACE iN PLACE PERCENT NO. DATEDEPTH-~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY OENSITY COMPACTION COMMENT* % PCF % PCF 86 08/26/04 FG-9.0 3 24.0 95.5 24.8 95 / 99 1-A ! 87 08/26/04 FG-8.5 3 24.0 95.5 24.0 95 '~ 1 -A 88 08/26/04 FG-8.0 3 24.0 95.5 24.3 9599'~ 1-A 89 08/26/04 FG-7.5 3 24.0 95.5 24.2 95 99 1 -A 90 08/26/04 FG-7.0 3 24.0 95.5 25.0 95 99 j 1 -A 91 08/26/04 FG-6.5 3 24.0 95.5 24.7 95 99¢ 1-A 92 08/26/04 FG-60 3 24.0 95.5 24.0 95 1 1-A TEST LOCATION: UTILITIES 86 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 87 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 89 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 90 SANITARYSEWERSERVICETOBLOCKA, PAD1 CC: HENNESSEY ENGINEERING; CITY OF COPPELL 1 FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATION~ 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C PERCENT iN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTTREATED D. RETEST Geotechnical Engineering TESTING, INC. with express approval ndicaflve of the qualities of Construction Materials Testing /; Environmental Engineering /;'~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 CMetro) FAX: 972/406-8023 TESTED FOR: ST. ANDREWS LAND COMPANY CARROLLTON, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 08~26~04 PROJECT: ST. ANDREWS ESTATES COPPELL, TEXAS OUR REPORT NO.: 04219-19A TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH'"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 93 08/26/04 FG-5.5 3 24.0 95.5 24.2 95 100 1-A 94 08/26/04 FG-5.0 3 24.0 95.5 24.5 95 99 1-A 95 08~26/04 FG-4.5 3 24.0 95.5 24.0 95 100 1-A 96 08/26/04 FG-4.0 3 24.0 95.5 24.3 95 100 1-A 97 08/26/04 FG-3.5 3 24.0 95.5 25.0 95 99 1-A 98 08/26/04 FG-3.0 3 24.0 95.5 25.0 94 99 1-A 99 08/26/04 FG-2.5 3 24.0 95.5 24.5 95 99 I-A TEST LOCATION: UTILITIES 93 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 94 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 95 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 96 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 97 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 98 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 /~ / / 99 SANITARY SEWER SERVICE TO BLOCK A, PAD 1. ~-/, , CC: HENNESSEY ENGINEERING; CITY OF COPPELL 1 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED * A IN PLACE PERCENTMOISTUREAND PERCE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST t with express approval of lot indica*ive of the qualities of Geotechnical Engineering [,' Construction Materials Testing Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: ST. ANDREWS LAND COMPANY CARROLLTON, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 08/26/04 PROJECT: ST. ANDREWS ESTATES COPPELL, TEXAS OUR REPORT NO.: 04219-19B TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE tN PLACE PERCENT NO, DATEDEPT~,,..~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 100 08126104 FG-2,0 3 24.0 95,5 24.9 95 / 99 I-A 101 08126104 FG-1.5 3 24.0 95.5 24.0 95 100 I-A 102 08~26~04 FG-1.0 3 24.0 95.5 24.5 95 99 I-A 103 08126104 FG-0.5 3 24.0 95.5 24.6 95 100 I-A / 104 08/26/04 FG 3 24.0 95.5 24.2 95 99 /-A / TEST LOCATION: UTILITIES 100 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 101 SANITARY SEWER SERVICE TO BLOCK A, PAD '1 102 SANITARY SEWER SERVICE TO BLOCK A, PAD 1 103 SANITARY SEWER SERVICE TO BLOCKA, PAD 1 104 SANITARY SEWER SERVICE TO BLOCKA, PAD 1 CC: HENNESSEY ENGINEERING; CITY OF COPPELL 1 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN pLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Our test results and reports are for the exclusive use of the Client (and/heir designated recipients on file in our office) and shall no~ be r, ALPHA The use of our name and test results must receive our w~i~en approval Test results and reports apply only to [he samples tested and/or observed, ar ESTING, INC. with express approval of Geotechnical Engineering #, Construction Materials Testing /~ Environmental Engineering ~ Consulting