First Baptist-CS040924 (2)Kimley-Horn
and Associates, Inc,
September 24, 2004
Mr. Larry Davis
Construction Inspector
Engineering Department
255 Parkway Boulevard
PO Box 9478
Coppell, Texas 75019-4978
Re: First Baptist Church of Coppell Site Review
Mr. Davis:
Suite 1800
12700 Park Central Drive
Dallas, Texas
75251
Kimley-Hom and Associates (KHA) performed a visual review of the public sidewalk along
Denton Tap Road in front of the site as you requested. We traveled to the site and performed the
visual review on Thursday September 23, 2004. We placed a 4-foot digital level on the cross
slopes of this sidewalk and at the driveway cross walks. We found that the public sidewalk
exceeds 2% cross slope in most places and generally varies between 1% and 5%.
We also measured the running slope of the public sidewalk curb ramp at the northwest comer of
the site, as you requested. We found that the running slope measured 13.4% which exceeds the
maximum allowed by ADA/TAS of 8.33%.
Based on my understanding of ADA and TAS regulations, these slopes exceed the maximum
permitted slopes for accessible routes, and accessible curb ramps.
Please feel free to contact me with any questions.
Sincerely,
Kimley-Horn and Associates, Inc.
Nicholas E. Sulkowski, P.E.
Associate/Engineer