Loading...
First Baptist-CS040924 (2)Kimley-Horn and Associates, Inc, September 24, 2004 Mr. Larry Davis Construction Inspector Engineering Department 255 Parkway Boulevard PO Box 9478 Coppell, Texas 75019-4978 Re: First Baptist Church of Coppell Site Review Mr. Davis: Suite 1800 12700 Park Central Drive Dallas, Texas 75251 Kimley-Hom and Associates (KHA) performed a visual review of the public sidewalk along Denton Tap Road in front of the site as you requested. We traveled to the site and performed the visual review on Thursday September 23, 2004. We placed a 4-foot digital level on the cross slopes of this sidewalk and at the driveway cross walks. We found that the public sidewalk exceeds 2% cross slope in most places and generally varies between 1% and 5%. We also measured the running slope of the public sidewalk curb ramp at the northwest comer of the site, as you requested. We found that the running slope measured 13.4% which exceeds the maximum allowed by ADA/TAS of 8.33%. Based on my understanding of ADA and TAS regulations, these slopes exceed the maximum permitted slopes for accessible routes, and accessible curb ramps. Please feel free to contact me with any questions. Sincerely, Kimley-Horn and Associates, Inc. Nicholas E. Sulkowski, P.E. Associate/Engineer CC. Michael L. Cogburn, Arnold and Associates, Inc. First Baptist Church of Coppell TEL 972 770 1300 FAX 972 239 3820