Loading...
Gateway BP(2.1)-CS040930DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gateway Business Park No. 2, Lot 2, Block A (Avaya), Site Plan Amendment, to allow for the addition of three air conditioner chillers along the east side of the existing building located at 1111 Freeport Parkway, at the request of Brion Sargent, IA, interior architects. STAFF REP.: Gary Sieb PROJECT IDS SPR-04-0063 DRC DA TE: September 30, 2004 and October 7, 2004 CONTACT: Kenneth M. Griffin, P.E., Dir. o~Engineering/Public Works 972/304-3686 COMMENT STATUS: ,/'PRELIMINARY F4NA~ RE~,qSED It appears this work may impact drainage in the area. There is both an 8" and a 3" water line in the proposed construction area. This work will require engineered drawings and a permit from the Engineering Department.