Gateway BP(2.1)-CS040930DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Gateway Business Park No. 2, Lot 2, Block A (Avaya), Site Plan
Amendment, to allow for the addition of three air conditioner chillers along
the east side of the existing building located at 1111 Freeport Parkway, at
the request of Brion Sargent, IA, interior architects.
STAFF REP.: Gary Sieb PROJECT IDS SPR-04-0063
DRC DA TE: September 30, 2004 and October 7, 2004
CONTACT: Kenneth M. Griffin, P.E., Dir. o~Engineering/Public Works 972/304-3686
COMMENT STATUS: ,/'PRELIMINARY F4NA~ RE~,qSED
It appears this work may impact drainage in the area.
There is both an 8" and a 3" water line in the proposed construction area.
This work will require engineered drawings and a permit from the Engineering
Department.