Ballet TX-CS040930DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-207-C~ Ballet Academy of Texas, zoning change request from C
(Commercial) to PD-207-C (Planned Development-207-CommerciaI) to
allow the construction of an 11,214-square-foot ballet studio on 1.17 acres
of property located along the south side of Fitness Court, approximately 350
feet west of Denton Tap Road, at the request of Mark Wainscott, Wainscott
Companies.
STAFF REP.: Gary Sieb PROJECT ID# PD-04-0060
DRC DA TE: September 30, 2004 and October 7, 2004
CONTACT: Kenneth M. Grid/in, P.E., Dir. of En~ineering/Public Works 972/304-3686
COMMENT STATUS: *"PRELIMINARY F4NA~ ....... D
Site Plan
1. Show inlet relocation.
2. Are any on-site fire hydrants needed?
3. Show FDC location.
4. Provide a copy of agreement with adjacent property owner for off-site construction and
access.
See additional comments under plat case.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Ballet Academy of Texas~ Lot 1~ Block At Minor Plat, to allow a ballet
studio on 1.17 acres of property located along the south side of Fitness
Court, approximately 350 feet west of Denton Tap Road, at the request of
Mark Wainscott, Wainscott Companies.
STAFF REP.: Gary Sieb PROJECT ID# MP-04-0061
DRC DA TE: September 30, 2004 and October 7, 2004
CONTACT: Kenneth M. Gri~n, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENT STATUS: ,,"PRELIMINARY FJNA~ I ~E~'~£ED
I
Plat
I. Provide 25' x 25' utility easement for water vault.
2. You will need permission from adjacent property owner for fire lane and access to cross
your property line.
Preliminary Utility Plans
1. Provide preliminary grading and drainage plans for review.
2. Set a vault with a DDC within the utility easement on your fire line.
3. Engineering will need to review details of the inlet relocation during full engineering review.
4. Domestic and irrigation meters should be offthe public water line in the street rather than the
proposed fire line.
Additional comments may be forthcoming when grading and drainage plans are submitted.
Additional comments will be made during full engineering review.