Loading...
Old Townhomes-CS040917 T H E C I T Y · O F CO?F'ELL September 17, 2004 Mr. Kurt Jones Carbon Landmark, LLC 1701 N Collins Blvd, Ste 1200 Richardson TX 75080-3586 RE: Old Coppell Townhomes Dear Mr. Jones: On September 14, 2004 a walk-through inspection was conducted for the referenced project. It appears that all punchlist items have been completed. At this time, the remaining requirements for sign-off on the CO must be supplied. They are as follow: 1. Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public right-of-way and easements for a 2-year period beginning on the date of final acceptance. 2. Provide an erosion control escrow or bond in an amount equal to 100% of the cost of erosion control structures installed in this phase. 3. Payment of overtime inspection fees of $320.00 (see attached). Once these items have been received, I will sign off on the CO and send a final acceptance letter. If you have any questions, please call me at 972/304-3679. Sincerely, Garreth Campbell Construction Inspector Office Phone: 972/304-3685 Fax: 972/304-3570 cc: Keith R. Marvin, P.E., Civil Engineer