Loading...
Vista Point II-CS040922September 22, 2004 B. David Littleton, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 RE: Vista Point Ii - Lot 1, Block ,,5, Fee Assessment Letter Dear Mr. Littleton: Enclosed is a copy of the City of Coppcll Development Fee Assessment table, along with a copy of the Development Fee calculations for thc referenced development. Please make payment for the Impact Fees to the City of Coppell il2 the anaount of $113,66325 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note tl~at the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until tho issuance of a Building Permit. Please provide a copy of the }mgineer's estimate or contract to our office so the 2'3/0 & 4% construction inspection fee can be xe~itied. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Serxice Center, 810 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of tiao required fees will help insure a success£ul begilming of this proj eot \Vt look fbi;yard to working with you on this pr%jeer, if you have aoy qttestlons, please contact Sincerely, Kcith R. Ma~win, P.E. Civil Engineer CC: Jennifer Amastrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistam Director of Public Works Grog Jones, Chief Building Official Brad Reid, Director of Pinks and Recreation Project: Date: I)EVELOPMENT FEE TABLE l/i.sta Point 11 - Lot I, Block A 9/20/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL \Vater Impact Fee $ I 1,900.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $350.00 (100% due at Issuance of Water Meter) Water Meter Fee (Donrestic) $635.16 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $10.365.62 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) S90.00 (100% due al Issuance of Water Meter) lrrigationJFireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,720.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee S 150.00 (100% due at issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior ro Council Approval) Roadway Impact Fee $113,663.25 $113,663.25 ( 100% due prior to Council Approval) Street Light l:ee ln~brmation not Available (100% due prior to Acceptance of l'roject') Street Sign Fee ll~f~mmtion not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (I 00°,/o due prior to Start of Construction) i'OTAI, $144, 144.03 TOTAL AMOUNT DUE PRIOR TO FILING OF FINAL PLAT $113,663.25 DEVELOPMENT FEE WORKSHEET PROJECT: Vista Poin! H - Lot 1, Blocl~ ,4 DATE: 9/20/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s) 3 - 2 inch 24 ESU's 2 - 2 inch 16 ESU's 0 0 ESU's 2 - 10 inch 2 5 ESU's Total#: 425 ESU's@$28000ea (Due prior to issuance of building permit) Water Tap Inspection Fcc: Total #: 7 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to ~ssuance of meter) Domestic Water ]Meter Fee: Total #: 3 Domestic Meter(s) @ S211 72 (Single family due prior to issuance of building permit) (All other developments due prior to ~ssuance of meter) lrrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ S211 72 Total #: 0 Additional Irrigation Meter(s) @ $0 00 Total fl: 2 Fireline Meter(s) @ $4,971 09 (100% due prior to issuance of water meters) Domestic Water Meter l)eposit Fee: Total #: 3 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 24 (Due prior to issuance of building permit) @ $280 00 ea Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50 00 ea (t00% due prior to issuance of building permit) UtiliD' Final Inspection Fee (All dexrelopments): Total #: 3 Lots @ $50 00 ea (100% due prior to issuance of building permit) S 11,900 00 $35000 $63516 $42344 $0.00 $9,942.18 $9000 $120 00 $6,720 00 $150 O0 $150 00 Park Fee (For Residential l)evelopments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: Al'ret October 26, 1993 Single-family @ $0 00 per lot Multi-famiry @ $000 per umt (100% paid prior to Council approval of final plat) $0 00 $0 00 $113,66325 Information not Available Ready, ay lmpac/Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until afterTU Electric submits the lighting plan for the proposed development Once the plans are submitted, $29260 per light will be assessed (100% due prior to final acceptance of development) Strect Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Vista Point 11 - Lot 1, Block .4 9/20/2004 ROADWAY IMPACT FEE: Service Area * 2 Category ** Office Laud Use ** Business Park Building Area (sO 93.550 Development Units ** 93.55 Vehicle Miles per Development Unit ** 405 Fee per Vehicle Mile *** $300 Roadway Impact Fee due (Development Units) x Vehicle Miles per Development Uoit) x (Fee per Vehicle Mile) $113,663.25 * (Figure 2 - Roadway Impact Fee Study) "* ('fable 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) I 4MOUNTDUE: $113,663.25