ST9301-CS040922Sandy Lake Road
Suzan Taylor-Sandy Lake Road
From:
To:
Date:
Subject:
CC:
"Pembroke, Bill" <BilI.Pembroke@jacobs.com>
<staylor@ci.coppell.tx.us>
9/22/2004 9:03 AM
Sandy Lake Road
"Lin, Gilbert" <Gilbert. Lin@jacobs.corn>, "lrani, Spenta" <Spenta.lrani@jacobs.com>
Page 1 of 1
s'T
Suzan:
1. The Concrete Traffic Barrier will be referenced as Precast Concrete Traffic Barrier Type 2. TxDOT Standard PCTB (1 & 2)
- 02
2. The culvert design will have to be cast in place because of fill depth above the culvert. The PC-5 standard originally
referenced is no longer applicable and the current precast standard does not address fill depths above 12 feet. We are
modifying the plans to reflect a 10'x8' cast in place. The referenced TxDOT Standard is MC-10-23. You may want to consider
a bid alternate allowing Contractor to submit a precast alternate. Of course the precast manufacturer would have to certify to
its design and application.
3. In Ken's comments he indicated adding a median opening at the nursery. I do not recall this opening being in the contract
scope. I want to add this to the scope with corresponding additional fee.
We are back checking plans today with the exception of the median opening. Gilbert is preparing tree plots for Garreth.
No word from TDLR. I will stay on them.
Bill
William G. Pembroke, P.E.
Senior Project Manager
Jacobs Civil Inc.
6688 N. Central Expressway
Suite 400, MB 13
Dallas, TX 75206-3924
ph: 214.424.7500
dir: 214.424.7591
fax: 214.696.3499
bi!!J~mbrok~.jacq~com
NOTICE - This communication may contain confidential and privileged
information that is for the sole use of the intended recipient. Any viewing,
copying or distribution of, or reliance on this message by unintended
recipients is strictly prohibited. If you have received this message in
error, please notify us mediately by replying to the message and deleting
it from your computer.
file://C:\Documents%20and%20Settings\staylor\Local%20Settings\Temp\GW}00001.HTM 9/22/2004