Loading...
ST9905-CS040915Suzan Taylor - RE: Bethel Road Agreement Page 1 of 2 From: "Patrick Nwakoby" <pnwakoby@expl.com> To: "Suzan Taylor" <staylor~ci.coppell.b(.us> Date: 9/15/2004 6:31 AH Subject: RE: Bethel Road Agreement Good morning Suzan! No problem - let me know after you review if that is the only item you want to revise. Thanks for your help. Patrick .... [Patrick Nwakoby] -Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] ~ent: Tuesday, September 14, 2004 4:39 PM To: Patrick Nwakoby Subject: RE: Bethel Road Agreement Patrick: I appreciate the quick response and we do not want to 'rock the boat' - would it be possible to change Item No. 6 to read: City shall not permit any machine excavation nor allow heavy equipment to work within 10 feet either side of Explorer's 12-inch pipeline without Explorer's field representative being present. If you do not want to change it - that is fine. Thanks >>> "Patrick Nwakoby" <pnwakoby@expl.com> 9/14/2004 4:25:57 PFI >>> Good afternoon Suzan! Thank you for your e-mail. Item #6 is to prevent any equipment working near the pipeline without an Explorer Rep. on site. Your contractor can work near the pipeline. We just want to ensure that Explorer is notified so that someone from Explorer is present. Please let me know if this helps. Thanks. Patrick ..... Original Message ..... From: Suzan Taylor [mailto:staylor@ci.coppell.tx.us] ~ent: Tuesday, September 14, 2004 4:08 PM To: Patrick Nwakoby Subject: Bethel Road Agreement Patrick: Patrick: In reviewing the agreement - we have concerns about Item No. 6 that states: City shall not permit any machine excavation nor allow heavy equipment to work within 10 feet either side of Explorers 12-inch pipeline without prior approval of Explorer's field representive. We are entering into this agreement because the city wants to construct roadway improvements file://C :XDocuments%20and%20Settings\staylorkLocal%20Settings\Temp\GW} 00001 .HTM 9/15/2004 Page 2 of 2 that are within 5 feet of your 12-inch pipeline. The proposed back-of-curb is 5 feet away from the pipeline at the closest point. We know in advance that we can not construct these roadway improvements without having paving operation equipment within 10 feet either side of the pipeline. The paving machine extends out three to four feet beyond the back of curb. Could Item No. 6 be reworded to state: City shall not permit any machine excavation nor allow heavy equipment, other than the paving operation equipment, to work within 10 feet either side of Explorers 12-inch pipeline without prior approval of Explorer's field representive. Thanks fi~e://C:xD~curnents%2~and%2~Settings\stay~~rxL~ca~%2~Setfings\Temp\G~}~~~~~.HTM 9/15/2004