Loading...
Coppell Ind 2-LR040714 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Tradepoint Distribution Center Phase 2 Earthwork Bethel Road Coppell, Texas REPORTED TO: Hillwood Fund No. 1, LP 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 ATTN: Mr. Albert Jarrell CONTRACTOR: Hillwood Construction Services REPORT NO. 13 REPORT DATE: 07-14-04 REG PROJECT NO. 11300 TECHNICIAN: M. Banchetti PAGE: 1 of 1 Proctor ASTM Optimum Maximum No. Standard Description Mo sture, % Density, PCF 1 D-698 19.1 100.7 2 D-698 20.2 103.3 3 D-698 19.1 103.5 4 D-698 19.7 102.6 Dark brown clay Brown sandy clay Dark brown clay Yellow & light brown & gray clay w/calcareous nodules 5 D-698 Yellow & light brown sandy clay & shale 17.5 105.8 w/calcareous nodules Test No. Date Location 215 07-03-04 Bldg Pad: 400'S, 5'W(1) 216 Bldg Pad: 500'S, 5'W(1) Depth Below Final S. G. (feet) 5.0 5.0 Field Density Compaction (pcf) Level (%) 97.4 94.9 96.7 94.2 Field Moisture Proctor (%) D 23.9 4 24.3 4 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.E. corner of Building 1. Mail Distribution: (1) Hillwood Fund No. 1, LP/ Mr. Albert Jarrell (1) Hillwood Construction Services/ Mr. Ralph Rucker (1) R.G.A. Architects/Mr. Rick Gilliland (1) Halff Associates/ Mr. Stephen Crawford Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn