Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Coppell Ind 2-LR040618
GEOTECHNICAL AND ~ ~ r--I LJ F~ ENVIRON t.t ENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Tradepoint Distribution Center Phase 2 Earthwork Bethel Road Coppell, Texas REPORTED TO: Hillwood Fund No. 1, LP 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 ATTN: Mr. Albert Jarrell CONTRACTOR: Hillwood Construction Services REPORT NO. 9 REPORT DATE: 06-18-04 REG PROJECT NO. 11300 TECHNICIAN: M. Lawson PAGE: 1 of 2 Proctor ASTM No. Standard Description 1 D-698 2 D-698 3 D-698 4 D-698 5 D-698 Dark brown clay Brown sandy clay Dark brown clay Yellow & light brown & grey clay w/calcareous nodules Yellow & light brown sandy clay & shale w/calcareous nodules Optimum Maximum Mo sture, % Density, PCF 19.1 100.7 20.2 103.3 19.1 103.5 19.7 102.6 17.5 105.8 Test No. Date Location 71 72 73 74 75 76 77 78 79 8O 81 82 83 84 85 86 87 88 06-15-04 Bldg Pad: 80'N 25'E(1) Bldg Pad: 130'N 75'E(1) Bldg Pad: 70'N 125'E(1) Bldg Pad: 125'N 175'E(1) Bldg Pad: 65'N 225'E(1) Bldg Pad: 90'N 275'E(1) Bldg Pad: 140'N 325'E(1) BIdg Pad: 100'N 375'E(1) Bldg Pad: 130'N, 425'E(1) Bldg Pad: 200'N, 25'E(1) Bldg Pad: 180'N, 75'E(1) Bldg Pad: 220'N, 125'E(1) BIdg Pad: 230'N, 175'E(1) Bldg Pad: 175'N, 225'E(1) Bldg Pad: 200'N, 375'E(1) Bldg Pad: 210'N, 325'E(1) BIdg Pad: 190'N, 375'E(1) BId~/Pad: 225'N, 425'E(1 ) Depth Below Final S. G. (feet) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Field Field Density Moisture Proctor Compaction (pcf) (%) ID Level (%) 96.6 24.3 2 93.6 95.0 25.6 2 92.1 97.7 23.7 2 94.7 95.8 25.8 2 92.8 95.8 25.0 2 92.8 97.6 24.7 2 94.6 96.5 24.5 2 93.5 95.8 25.6 2 92.8 94.9 25.0 2 92.0 96.1 25.8 2 93.1 98.0 24.2 2 95.0 97.4 23.4 2 94.4 97.0 22.8 2 94.0 98.1 24.6 2 95.1 95.9 25.7 2 92.9 97.3 23.8 2 94.3 95.3 25.1 2 92.3 96.5 24.0 2 93.5 2424STUTZ DR. * SUITE400 · DALLAS, TX 75235 · TEL [2141350 5600 · ~^X[214J 3500019 REPORTNO. 9 REPORT DATE:06~3-04 REG PROJECT NO. 11300 PAGE: 2 ~ 2 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from S.E. corner of Building 2. Mail Distribution: (1) Hillwood Fund No. 1, LP/ Mr. Albert Jarrell (1) Hillwood Construction Services/ Mr. Ralph Rucker (1) R.G.A. Amhitects/Mr. Rick Gilliland (1) Halff Associates/ Mr. Stephen Crawford Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/cn