Loading...
Coppell Ind 2-LR040615 GEOTECHNICAL AND ENVIRONHENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Tradepoint Distribution Center Phase 2 Earthwork Bethel Road Coppell, Texas REPORTED TO: Hillwood Fund No. 1, LP 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 ATTN: Mr. Albert Jarrell CONTRACTOR: Hillwood Construction Services REPORT NO. 1 REPORT DATE: 06-15-04 REG PROJECT NO. 11300 TECHNICIAN: M. Lawson PAGE: 1 of 1 Proctor ASTM Optimum Maximum No. Standard Description Mo sture~ % Density, PCF 1 D-698 Dark brown clay 19.1 100.7 [ Depth I Field Below r Field I Test Final S.G. Density Moisture Proctor Compaction No. Date Location (feet) (pcf) (%) ID Leve (%) 1 05-24-04 Bldg Pad 2: 20'N, 50'W(1) 3.0 94.1 26.2 1 92.5 2 BIdg Pad 2: 80'N, 100'W(1) 3.0 96.2 25.1 I 94.6 3 Bidg Pad 2: 40'N, 150'W(1) 3.0 94.7 26.8 1 93.1 4 Bldg Pad 2: 90'N, 200'W(1) 3.0 94.4 25.9 1 92.8 5 Bldg Pad 2: 10'N, 250'W(1 ) 3.0 94.0 26.2 1 92.4 6 Bldg Pad 2: 75'N, 300'W(1) 3.0 96.3 26.5 1 94.7 7 Bldg Pad 2: 30'N, 340'W(1) 3.0 96.4 24.9 1 94.8 8 Bldg Pad 2: 125'N, 450'W(1) 3.0 96.8 24.9 1 95.2 9 Bldg Pad 2: 175'N, 400'W(1) 3.0 96.4 24.2 1 94.8 10 Bldg Pad 2: 130'N, 350'W(1 ) 3.0 93.6 26.5 I 92.0 11 Bldg Pad 2: 180'N, 300'W(1) 3.0 94.5 25.1 I 92.9 12 Bldg Pad 2:110'N, 250'W(1) 3.0 94.2 26.5 1 92.6 13 Bldg Pad 2: 160'N, 200'W(1) 3.0 96.4 24.7 1 94.8 14 Bldg Pad 2: 190'N, 150'W(1) 3.0 95.9 25.2 1 94.3 15 BId9 Pad 2: 120'N, 100'W(1) 3.0 96.8 25.2 1 95.2 16 Bid9 Pad 2: 150'N, 50'W(1) 3.0 94.0 26.0 1 92.4 Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from $.E. building corner. Mail Distribution: (1) Hillwood Fund No. 1, LP/ Mr. Albert Jarrell (1) Hillwood Construction Services/ Mr. Ralph Rucker (1) R.G.A. Architects/Mr. Rick Gilliland (1) Halff Associates/ Mr. Stephen Crawford Submitted by: REED ENGINEERING GROUP, LTD. Odg[nal Signed By Keith E. Atkins Manager, CMT BW/cn