REPORT OF BUILT-UP ROOFING OBSERVATION
Royal Park
Freeport Parkway and Burns Street
Coppell, Texas
REPORTED TO: Hay & Jones
c/o Pritchard Associates
2500 Routh Street
Dallas, Texas 75201
ATTN: Mr. Brett Ratliff
REPORT NO. 62
REPORT DATE: 09-14-04
REG PROJECT NO. 11150
DATE OBSERVED: 08-25-04
TECHNICIAN: M. Lawson
PAGE: 1 of 1
[General Contractor: ]McFadden & Miller
IRoofing Contractor: IHEC Roofing
I Location of Work: I East half of roof.
IWeather Conditions: I Sunny
ITemperature Range: I 78°~ 95°
Operations Observed: I Placement of roof ballast.
i[ei~ Observed: Yes No Items Observed: Yes No
Roofing Materials As Specified: x Roof Sketch Attached: x
Labels Attached: x )ebris Removed from Roof Surface: x
Material Sheet Attached: x Crickets Installed this Date: x
Materials Stored as Required: x Deck Inspected this Date: x
Non Conforming Materials Noted: x Photograph's taken this Date: x
Pull Test and/or Adhesion Test Performed: x Attachments: x
Mall Submitted by:
Distribution: (1) Pritchard Associates/Mr. Brett Ratliff
(1) McFadden & Miller/Mr. Jori Jacobson REED ENGINEERING GROUP, LTD.
(1) Azimuth Architecture/Mr. John Taylor
Original Signed By
Keith E. Atkins
Manager, CMT