Loading...
Coppell Comm 1R3-LR040914F=I IE~ E~:'r-~ I E~ I'--I1:~ I I--I ~"E~ I~lll-lr'~ GEOTECHNICAL AND I~ F:=I I'-1 I I F=~ ENVIRONFIENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 62 REPORT DATE: 09-14-04 REG PROJECT NO. 11150 DATE OBSERVED: 08-25-04 TECHNICIAN: M. Lawson PAGE: 1 of 1 [General Contractor: ]McFadden & Miller IRoofing Contractor: IHEC Roofing I Location of Work: I East half of roof. IWeather Conditions: I Sunny ITemperature Range: I 78°~ 95° Operations Observed: I Placement of roof ballast. i[ei~ Observed: Yes No Items Observed: Yes No Roofing Materials As Specified: x Roof Sketch Attached: x Labels Attached: x )ebris Removed from Roof Surface: x Material Sheet Attached: x Crickets Installed this Date: x Materials Stored as Required: x Deck Inspected this Date: x Non Conforming Materials Noted: x Photograph's taken this Date: x Pull Test and/or Adhesion Test Performed: x Attachments: x Mall Submitted by: Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jori Jacobson REED ENGINEERING GROUP, LTD. (1) Azimuth Architecture/Mr. John Taylor Original Signed By Keith E. Atkins Manager, CMT BW/ns