Coppell Comm 1R3-LR040909GEOTECHNICALAND G ~ r'~ I I F=~
ENVIRONMENTAL CONSULTANTS
REPORT OF BUILT-UP ROOFING OBSERVATION
Royal Park
Freeport Parkway and Burns Street
Coppell, Texas
REPORTED TO: Hay & Jones
c/o Pritchard Associates
2500 Routh Street
Dallas, Texas 75201
ATTN: Mr. Brett Ratliff
REPORT NO, 52
REPORT DATE: 09-09-04
REG PROJECT NO. 11150
DATE OBSERVED: 08-11-04
TECHNICIAN: M. Lawson
PAGE: 1 of 1
I General Contractor: I McFadden & Miller
I Rooflng Contractor: I HEC Roofing
IWeather Conditions: I Sunny/Windy
ITemperature Range: I 83°/95°
Location of Work: I Line E.1 through F.2 and 1 through 6.
Operations Observed: I Installation of Ply IV fiberglass felt.
[Work Completed: I Insulation: 14,560 Sq.ft Membrane: 14,560 Sq.ft
Items Observed: Yes No Items Observed: Yes No
~oofing Materials As Specified: X Roof Sketch Attached: N/A
Labels Attached: X Debris Removed from Roof Surface: X
Material Sheet Attached: X Crickets Installed this Date: X
Materials Stored as Required: X Deck inspected this Date: X
Non Conforming Materials Noted: N/A =hotograph's taken this Date: N/A
Pull Test and/or Adhesion Test Performed: N/A ~ttachments: N/A
Actual Tem ratures
~lt / Pitch Kettle Time Time
10:15 am 10:30 am
Mail
Distribution: (1) Pritchard Associates/Mr. Brett Ratliff
(1) McFadden & Miller/Mr. Jon Jacobson
(1) Azimuth Architecture/Mr. John Taylor
Submitted by:
REED ENGINEERING GROUP, LTD.
Odginal Signed By
Keith E. Atkins
Manager, CMT
BW/cn