Loading...
Coppell Comm 1R3-LR040909GEOTECHNICALAND G ~ r'~ I I F=~ ENVIRONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO, 52 REPORT DATE: 09-09-04 REG PROJECT NO. 11150 DATE OBSERVED: 08-11-04 TECHNICIAN: M. Lawson PAGE: 1 of 1 I General Contractor: I McFadden & Miller I Rooflng Contractor: I HEC Roofing IWeather Conditions: I Sunny/Windy ITemperature Range: I 83°/95° Location of Work: I Line E.1 through F.2 and 1 through 6. Operations Observed: I Installation of Ply IV fiberglass felt. [Work Completed: I Insulation: 14,560 Sq.ft Membrane: 14,560 Sq.ft Items Observed: Yes No Items Observed: Yes No ~oofing Materials As Specified: X Roof Sketch Attached: N/A Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed this Date: X Materials Stored as Required: X Deck inspected this Date: X Non Conforming Materials Noted: N/A =hotograph's taken this Date: N/A Pull Test and/or Adhesion Test Performed: N/A ~ttachments: N/A Actual Tem ratures ~lt / Pitch Kettle Time Time 10:15 am 10:30 am Mail Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Odginal Signed By Keith E. Atkins Manager, CMT BW/cn