Loading...
Coppell Comm 1R3-LR040907 GEOTECHNICAL AND ENVIP, ONMENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 53 REPORT DATE: 09-07-04 REG PROJECT NO. 11150 DATE OBSERVED: 08-12-04 TECHNICIAN: M. Lawson PAGE: 1 of 1 JGeneral Contractor: IMcFadden & Miller JWeather Conditions: ISunny JRooflng Contractor: IHEC Roofing [Temperature Range: ]85° Location of Work: Line A through B.6 and 1 through 6. Operations Observed: Roofers were observed placing 4'x4'xl" fesco insulation board and mechanically fastened to metal deck in 190 pattern is 12' of perimeter and 160 pattern in field of the mol, Afterwards three plies of Ply IV fiberglass felt was placed in hot asphalt over insulation. IWork Completed: Insulation: 15,750 Sq.ft Membrane: 15,750 Sq.ft Items Observed: Yes No Items Observed: Yes NoI Roofing Materials As Specified: X Roof Sketch Attached: N/^ Leh~!s Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed this Date: X Vlaterials Stored as Required: X Deck Inspected this Date: X ~lon Conforming Materials Noted: N/A Photograph's taken this Date: N/A =ull Test and/or Adhesion Test Performed: N/A Attachments: N/A Mail Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jori Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/cn GEOTECHNICALAND ~ ~=1 r'~ I I F=~ ENVIRONI~ENTAL CONSULTANTS REPORT OF BUILT-UP ROOFING OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 54 REPORT DATE: 09-07-04 REG PROJECT NO. 11150 DATE OBSERVED: 08-13-04 TECHNICIAN: M. Lawson PAGE: 1 of 1 1General Contractor: ] McFadden & Miller IWeather Conditions: I Sunny IRooflng Contractor: IHEC Roofing [Temperature Range: ]87° Location of Work: [ Line B.5 through D and 1 through 6. Operations Observed: I Roofers were observed placing base flashing in hot asphalt Concrete parapet walls. JWork Completed: I Insulation: 14,625 Sq.ft Membrane: 14,625 Sq.ft Items Observed: Yes No Items Observed: Yes No F~oofing Materials As Specified: X Roof Sketch Attached: N/A Labels Attached: X Debris Removed from Roof Surface: X Material Sheet Attached: X Crickets Installed this Date: X Materials Stored as Required: X Deck Inspected this Date: X Non Conforming Materials Noted: N/A Photograph's taken this Date: N/A Pull Test and/or Adhesion Test Performed: N/A ~,ttachments: N/A Mall Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/cn 2424 STUTZ DR. · SUITE400 · DALLAS, TX75235 · TEL[214J 3505600 o F^X [214] 3500019