Loading...
Coppell Comm 1R3-LR040610 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones cio Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 23 REPORT DATE: 06-10-04 REG PROJECT NO. 11150 TECHNICIAN: C. Johnson PAGE: I of I On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth (ft) Injection Spacing Injection Pressure Injection Intervals (ft) (psi) (in) 10 5 100-200 12-18 Equipment Number of Number of Probes Length of Probes Probe Spacing Rigs (ea) (ft) 2 4 12 5 Date I Area In~ected (sq ftI I Avera~le Pressure (psi~ I Pass No. 05-17-04 25,100 150 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/ Mr. Brett Ratliff (1) McFadden & Miller/ Mr. Jon Jacobson (1) Azimuth Architecture/ Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/cn GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 24 REPORT DATE: 06-10-04 REG PROJECT NO. 11150 TECHNICIAN: M. Banchetti PAGE: 1 of 1 CONTRACTOR: McFadden & Miller Proctor ASTM No. Standard I D-698 2 D-698 3 D-698 Description Optimum Maximum Mo sture, % Dens ty, PCF Dark grey sandy clay Light brown & dark gray clay w/grevel & trace yellowish brown clay Dark gray & reddish brown clay 24.3 96.3 22.3 99.1 19.4 102.3 Test No. Date Location 73 74 75 76 77 78 79 8O 81 05-21-04 Paving: 100'S, 50'W(1 ) Paving: 20'S, 50'W(1) Paving: 60'S, 50'W(1) Water Line: 25'N, 200'W(2) Water Line: 25'N, 201'W(2) Water Line: 25'N, 202'W92) Water Line: 25'N, 20'W(2) Water Line: 25'N, 19'W(2) Water Line: 25'N, 18'W(2) Depth ' Field Field Below I Final S.G. Density Moisture Proctor (feet) (pcf) (%) D 0.0 91.9 25.8 1 0.0 94.2 25.1 1 0.0 93.8 25.7 1 2.0 92.6 28.5 1 1.0 91.6 26.2 1 0.0 92.5 27.4 1 2.0 91.1 28.2 1 1.0 92.9 26.9 1 0.0 93.9 25.5 1 Compaction Level (%) 95.4 97.8 97.4 96.2 95.1 96.1 94.6 96.5 97.5 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from N.W. building corner. (2) Measurements referenced from N.E. building corner. Mall Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW/ns GEOTECHNICAL AND ENVIRONI'IENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 19 REPORT DATE: 06-09-04 REG PROJECT NO. 11150 TECHNICIAN: C. Johnson PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Injection Depth (ft) 10 Specification Injection Spacing Injection Pressure Injection Intervals (fl) (psi) (in} 5 100-200 12-18 Number of Rigs 2 Equipment Number of Probes ! Length of Probes (ea) / (ft) 4 12 Probe Spacing (ft) 5 Date 05-14-04 Area Iniected (sq fl) I Avera~le Pressure (psi) I 28,700 150 Pass No. 1&2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/ Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/cn