Loading...
Coppell Comm 1R3-LR040524 GEOTECHNICAL AND ENVIRONt. IENTAL CONSULTANTS POST INJECTION CONFIRMATION RESULTS Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 12 REPORT DATE: 05-24-04 REG PROJECT NO. 11150 PAGE: 1 of 1 CONTRACTOR: McFadden & Miller AREA REPRESENTED: Western 85' of pad. Boring Number/Pocket Pen Date Sampled 05-07-04 Depth W-2 (feet) W-1 0,0-1.5 1.0 2.0 1.5-3.0 2.7 1.7 3,0-4.5 2.0 1.2 4.5-6.0 2.0 1.5 6.0-7.5 1.5 1.2 7.5-9.0 1.2 1.7 9.0-10.0 2.5 2.2 Comments: Borings obtained after two injections passes. Based on the test results, an additional pass is not considered necessary. Mail Distribution: (1) Pritchard Associates/ Mr. Brett Ratliff (1) McFadden & Miller/ Mr. Jon Jacobson (1) Azimuth Architecture/ Mr. John Taylor Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C,M.T. BW/ns GEOTECHNICAL AND ~ F=;I r--I I I ~ ENVIRONHENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 7 REPORT DATE: 05-24-04 REG PROJECT NO. 11150 TECHNICIAN: W. Eberhardt PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth (ft) Injection Spacing Injection Pressure (fi) (psi) 10 5 100-200 Injection Intervals (in) 12-18 J Number of Ri~s 2 Equipment Number of Probes ~ Length of Probes (os) / (") 4 12 Probe Spacing 5 Date Area In'ected s fl Avera e Pressure si Pass No. I 04-29-04 14,000 100 1 I Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/ Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/cn GEOTECHNICAL AND r~ ~ r-I U F:~ ENVIRON~.IENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 8 REPORT DATE: 05-21-04 REG PROJECT NO. 11150 TECHNICIAN: B. Steadman PAGE: I of I CONTRACTOR: McFadden & Miller Proctor ASTM Optimum Maximum No. Standard Description Mo sture~ % Density~ PCF 1 D-698 Dark gray sandy clay 24.3 96.3 2 D-698 Light brown & dark gray clay w/gravel & 22.3 99.1 trace yellowish brown clay Dark gray & reddish brown clay 3 D-698 19.4 102.3 T;°s! I Proctor Compaction Date Location ID Level (%) 51 05-03-04 Bldg Pad: 200'S, 180'W(1) 1.0 92.8 26.7 1 96.4 52 Bldg Pad: 225'S, 160'W(1 ) 1.0 93.4 25.8 I 97.0 53 Bldg Pad: 190'$, 95'W(1) 1.0 91.5 26.3 I 95.0 54 Bldg Pad: 160'S, 140'W(1) 1.0 91.8 25.1 1 95.3 55 Bldg Pad: 120'S, 140'W(1) 1.0 90.1 25.6 1 93.6 56 Bldg Pad: 120'S, 140'W(1) 1.0 90.9 25.9 1 94.4 57 BIdg Pad: 40'S, 40'W(1 ) 1.0 90.4 26.0 1 93.9 58 BId~l Pad: 40'S, 40'W(1 ) 1.0 91.0 25.4 I 94.5 IDepth I I Below I Field I Field Final $. O. Density I Moisture (feet) (per) (%) Comments: Where tested, materials were in compliance with project specifications. Footnote: (1) Measurements referenced from N.E. building corner. Mail Distribution: (1) Pdtchard Associates/Mr. Brett Ratliff (t) McFadden & MilledMr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Ori§inal Signed By Keith E. Atkins Manager, CMT BW/cn