Loading...
Coppell Comm 1R3-LR040521 GEOTECHNICAL AND ENVIRONhlENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION ROYAL PARK FREEPORT PARKWAY AND BURNS STREET COPPELL, TEXAS REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 9 REPORT DATE: 05-21-047 REG PROJECT NO. 11150 TECHNICIAN: W. Eberhardt PAGE: I of 1 On these dates a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth (ft) Injection Spacing I Injection Pressure Injection Intervals (fi) I (psi) (in) 10 5 100-200 12-18 Number of Equipment Number of Probes J Length of Probes Probe Spacing Rigs lea) 2 4 12 5 I Area Iniected (sct ft) I Average Pressure (psiI I Pass NO. 16,100 100 1 & 2 14,600 100 1 & 2 Date 05-03-04 05-04-04 Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/ Mr. Brett Ratliff (1) McFadden & Milled Mr. Jon Jacobson (1) Azimuth Architecture/ Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. BW/cn GEOTECHNICAL AND ~ Jm~J J~ U F=:j ENVIRONHENTAL CONSULTANTS REPORT OF WATERINJECTION OBSERVATION ROYALPARK FREEPORT PARKWAY AND BURNS STREET COPPELL, TEXAS REPORTED TO: Hay & Jones cio Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 10 REPORT DATE: 05-21-04 REG PROJECT NO. 11150 TECHNICIAN: W. Eberhardt PAGE: 1 of 1 On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Injection Depth (ft) 10 Specification Injection Spacing Injection Pressure Injection Intervals (fi) (psi) (in) 5 100-200 12-18 Number of Rigs Ecluipment Number of Probes ! Length of Probes (ea) ! (fi) 4 12 Probe Spacing (ft) 5 Date J 04-30-04 Area Iniected (sql ft) I Avera;e Pressure {psiI I Pass No. 15,700 50-150 1 and 2 Surfactant added at regular intervals: Yes Mail Distribution: (1) Pritchard Associates/ Mr. Brett Ratliff (1) McFadden & Milled Mr. Jon Jacobson (1) Azimuth Architecture/ Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, C.M.T. KEA/ns GEOTECHNICALAND ~ F~ ~ I I F:~ ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Royal Park Freeport Parkway and Burns Street Coppell, Texas REPORTED TO: Hay & Jones c/o Pritchard Associates 2500 Routh Street Dallas, Texas 75201 ATTN: Mr. Brett Ratliff REPORT NO. 21 REG PROJECT NO. 11150 SAMPLE DATE: 05-18-04 TECHNICIAN: T. Miller CONTRACTOR: McFadden & Miller Location of Sample Set Number Location Approach: 10'W, 5'S of Burns and Hammond intemection Quantity Represented 10/20 Design Information Mix Identification Source of Concrete ] TXI 8274 Test Results Specified Strength p.s.i. 4000 Set Cylinder I Age ~ Total Load No. IDJ Date Tested Test lbs. 1 8362 05-25-04 7 106590 8362 06-15-04 28 129380 8362 06-15-04 28 127650 8362 Hold H Compressive I Average Strength p.s.i. Strength p.s.i. 3770 4580 4520 4550 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. ID Slump Sample Air Temp. Temp. Entrainment Number 1 8362 3.50 12:00PM 86 92 3.5 3535721 Mail Distribution: (1) Pritchard Associates/Mr. Brett Ratliff (1) McFadden & Miller/Mr. Jon Jacobson (1) Azimuth Architecture/Mr. John Taylor Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith Atkins Manager, C.M.T. KEAJje 2424 STUTZ DR. · SUITE400 ,, DALLAS, TX75235 · TEL[214]3505600 '~ CAX [2141350 0019