Loading...
Freeport NIP(8.0)-LR040925ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 218455 Project No.: 049245 Date of Service: 09/15/2004 Report Date: 09/25/2004 Project: Freeport XI & XII Coppell, Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. CONTRACTOR: Duke Construction Test Methods: ASTM D-2922 ASTM D-3017 PROJECT DATA Gauge: Troxler 3430 Moisture Gauge Serial No: 35518 Current: 704 Test Mode: DT Previous: 705 Standard Counts Density Current: 2692 Previous: 2689 M/D No. Description MOISTURE DENSITY RELATIONS Maximum Moisture °/0 Density pcf Project Requirements Moisture Density 1 Lime Treated Dark Brown Clay 27.5 89.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D NO TEST LOCATION DEPTH No. MOISTURE WET DENSITY DRY DENSITY DENSYI~ (%) (pcf) (pci) (% max) 28.3 116.0 90.4 102 28.9 113.4 88.0 99 31.5 114.9 87.4 98 27.8 112.6 88.1 99 29.6 112.2 86.6 97 29.9 112.5 86.6 97 30.2 112.4 86.3 97 Building pad subgrade 1 Pad 11, Lines 14/A.9 6" 1 Building pad subgrade 2 Pad 11, Lines 11/A.9 6" 1 Building pad subgrade 3 Pad 11, Lines 9/A.9 6" 1 Building pad subgrade 4 Pad 11, Lines 6/A.9 6" 1 Building pad subgrade 5 Pad 11, Lines 4/A.9 6" 1 Building pad subgrade 6 Pad 11, Lines 14/E. 1 6" 1 Building pad subgrade 7 Pad Il,Lines ll/E.1 6" 1 Building pad subgrade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality ce erformance etc or an other feature of s m ar subject matler provided by persons or conditions over which we have no con~-ol. Our letters and composition appearan , P , ) Y ......... ,t ~d e-~ce~! in full without the written aoproval of Rone Engineers, Ltd Page 1 of 2 leers Report No.: 218455 Project No.: 049245 Client: Duke Realty Services, LP TEST NO 8 9 10 TEgTLOCAT1ON Pad 11, Lines 9/E.1 Building pad subgrade Pad 1 t, Lines 6/E.I Building pad subgrade Pad 11, Lines 4/E.1 Technician: Joe Jemigan Report Distribution: (1) Duke Realty Services, LP (l) Extranet (1) City of Coppell (1) City of Coppell PROBE M/D MOISTL~E WETDENSITYDRY DENSITY DENSITY DEPTH No. (%) (pc0 (pc~ (% max) 6" 1 29.5 113.2 87.4 98 6" 1 28.9 113.4 88.0 99 6" 1 28.7 113.8 88.4 99 Started: 3:30pm Finished: 5:30pm CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and s~h~a21~ng t~bte~r e p r o d u c e d except in full without the writtun approval of Rone Engineers, Ltd. RoneEn gineers Client: Duke Realty Services, LP Mr. Brian St~aley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6~00 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Repo~ No.: 218344 Pr~ect No.: 049245 Date of Service: 09/14/2004 Report Date: 09~5~004 Project: Freepor~ XI & XII Coppell, Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. CONTRACTOR: Duke Cons~uction Test Methods: ASTM D-2922 ASTIVi D-3017 Gauge: Troxler 3411 Gauge Serial No: 4645 Test Mode: DT Moisture Current: 556 Previous: 568 Standard Counts Density Current: 1767 Previous: 1726 No. Description MOISTURE DENSITY RELATIONS M~ximum Moistare % Density pcf Lime Treated Dark Brown Clay Project Requirements Moisture Density 27.5 89.0 Optimum +4 95 min TEST NO TEST LOCATION PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pcO (% max) Building cap 6" I 28.0 110.3 86.2 97 1 100' north, 50' east of southwest building comer, fmal Building cap 6" 27.5 110.4 86.6 97 2 200' north, 50' east of southwest building 1 comer, final Building cap 6" 1 27.5 108.6 85.2 96 3 300' not,h, 50' east of southwest building corner, final Test results on this report meet project specification ~~_/_ .~ Started: 2:15pm Finished: 5:00pm K. Scott Watson, AET CMT Operations Manager Technician: Jason Bartholomew Report Distribution: (1) Duke Realty Services, LP (1) Ex,net (1) City of Coppell (1) City of Coppell LIMITATIONS: The test results presented herein were prepared bzsed upon the specific samples provided for testing. We assume no responsibility for variation in quality sitio c~ erformanc~, etc.) or any other feature °f sim d ar subject m~, pr°v'~d~ ~bfd ?~s~°n~;°~'~l f~i~t~ ~fT~f~n~t?d ( Cr~olo~ ~orap~l~e~x~l usivP e use of the chents to whom they are addressed and shall no, oe repr I~ ........ o'~iq Page 1 of I M'~I~ [~ngJne~fi~g Testing ~De~l Pa&e North