Freeport NIP(8.0)-LR040908Client:
:ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 216529
Project No.: 049245
Date of Service: 08/23/2004
Report Date: 09/08/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:00am - 2:30pm
Page 1 of 4
Technician: Nathan Witherell
Report Distribution:
(1) Duke R~alty Services, LP
(1) Ex~ran~
(1) CRy of Coppell
(1) City of Coppell
Rone Engineers, Ltd.
..~ K. Scott Watson, AET
CMT Operations Manager
herein were re ared based upon the specific samples provided for testing. We assume no responsibility for vafimion in quality
LIMITATIONS: The test results presented P P ............. ~a~a ~., ~ conditions over which we have no control. Our letters and
corn sition, appearance, performance, etc.) o Y ...... , _~ ~. .... a.~.a .~ ,, in full vnthout lhe wnRen approval of Rone Engineers, Ltd.
reporL~ are for the exclusive use of the clients to ~Y
Pa~e I of I
WATER
INJECTION OBSERVATION
Client:
Project:
Duke Realty Services, LP
Freeport XI & Xll
Coppell, Texas
Report No.: 216529
Project No.: 049245
Date of Service: 23-Aug
Page 2 of 4
DESCRIPTION/EXPLANATION ~ T ~
1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X
X
2. Lime slurry was continuously agitated
X
3. Surfactant was ~rl~_d to each load
4. The injection pressure was kept between 50 to 100 psi at point of injection (100) x
5. Intervals of 12" were achieved during iniection process until refusal (12" - 18") x
3. Total depth of injection - 10 feet X
7, Max. spacing of injection probes was recorded to be 5 ft. X
3. Free lime on surface
9. Scluare feet injected on this date 27,560
10. Location of in'ection: All border asses of XlI, north section borders of XI
Remarks:
See attached for sketch of injected area.
Time:
Technician:
6:00am - 2:30pm
Nathan Witherell
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for
variation in quality (composition, appearance, pen~ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and repotts are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Ltd.
Nort~
'~'7~
Client:
ineers
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
8900 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 6309745
REPORT OF WATER INJECTION INSPECTION
Project: Freeport XI & XII
Coppell, Texas
Report No.: 215763
Project No.: 049245
Date of Service: 08/12/2004
Report Date: 09/08/2004
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:45am - 5:00pm
Page 1 of 3
Technician: Nathan Witherell
Report Distribution:
(l) Duke Realty Sen,ices, LP
(1) Extranet
(1) City of Coppell
(1) City of Coppell
Rone Engineers, Ltd.
.~ K. Scott Watson, 3~ET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for ~esfing. We assume no responsibility for variation in quality
(composition, appearance, peffonmmce, etc.) or any other feature of similar subject matter provided by p~rsons.or..c~n, di~i. ons o.v~ w~i~h we have?o. ~e~ontroL O~r lette ,~. ~and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except m mil w~thout the wmten approvm ot Kone ~ng~neers, ~.~u.
Pa~e I of I
WATER
INJECTION OBSERVATION
Client:
Project:
Duke Realty Services, LP
Freeport XI & XII
Coppell, Texas
Report No.: 215763
Project No.: 049245
Date of Service: 8/12/04
Page 2 of 3
DESCRIPTION/EXPLANATION ~ T ~
1. Specific ~ravity of lime was checked and found to be 1.14 and 1.17 X
X
2. Lime slurry was continuously a~litated
X
3. Surfactant was added to each load
· '- .... 0 psi at point of iniection 100 x
4. The ~n~ecton pressure was kept be ..... n 5 to 100
5. Intervals of 12" were achieved durin~l iniection process until refusal 12" - 18" x
6. Total depth of iniection - 10 feet X
7. Max. spacing of injection probes was recorded to be 5 ft. x
3. Free lime on surface
;). Square feet injected on this date
.... . f south section 120' x 400'
10. Location of in ecbon. South border, Pass 2 o
Rema~s:
See attached for sketch of injected area, pass number for each area.
Time:
Technician:
6:45am - 5:00pm
Nathan Witherell
LIMITATIONS: The test results presented herein were prepared based upon the s~ samples provided for testing. We assume no responsibility for
variation in quality (composition, appearance, pen~ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Ltd.
×
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Client: Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360 ~.~-
Dallas TX 75254 ~.~-.- · .~.?~'~ '~'
Project: ~
Services: Water Injec~/
Report No.: 215374
Pr~ect No.: 049245
Date of Service: 08/07/2004
Report Date: 09~8/2004
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:00am - 2:30pm
Page 1 of 3
Technician: Nathan Witherell
Report Distribution:
(1) Duke R=alty Services, LP
(1) Ex=anct
(1) City of Coppcll
(1) City of Coppcll
Rone Engineers, Ltd.
CMT Operations Manager
· · · ' We assume no responsibility for variation in quality
LIMITATIONS: Thc test results presented ha-em were prepared bes~d upon the specific samples provided for testing.
(composition, appearance, performance, etc.) or any otber feature of stmdar subject mailer provtded by persons or conditions over which we have no control Our lett~ and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineers, Ltd
WATER
INJECTION OBSERVATION
Client:
Project:
Duke Realty Services, LP
Freeport XI & XII
Coppell, Texas
Report No.: 215374
Project No.: 049245
Date of Service: 8/7/2004
Page 2 of 3
DESCRIPTION/EXPLANATION ~ ~ ~
1. Specific ~lravity of lime was checked and found to be 1.14 and 1.17 X
X
2. Lime slurry was continuously a~litated
X
3. SuH'actant was added to each load
4. The injection pressure was kept between 50 to 100 psi at point of injection 100 x
5. Intervals of 12" were achieved during injection process until refusal 12" - 18" x
6. Total depth of injection - 10 feet x
7. Max. spacin~l of injection probes was recorded to be 5 ft. X
X
~8. Free lime on surface 32,000
;). Square feet injected on this date South end
10. Location of in'ection
Rema~s:
See attached for sketch of injected area.
Time:
Technician:
6:00am - 2:30pm
Nathan Witherell
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for
variation in qualit,j (composition, appearance, performance, etc.) or any other feature of simitar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the wi~ten approval of Rone Engineers, Ltd.
Testing
· OBS~RPA.FIO~
'neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Report No.: 215880
Client: Duke Realty Services, LP Project No.: 049245
Mr. Brian Sl~aley
5495 Belt Line Rd., Ste 360 Date of Service: 08/13/2004
Dallas TX 75254 Report Date: 09/08/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:30am - 5:00pm
Page 1 of 3
Technician: Nathan Witherell
Report Distribution:
(1) Duke R~alty Services. LP
(1) Extranet
(1) City of Coppell
(1) City of Copp~ll
Rone Engineers, Ltd.
~L~ K. Scott Watson, AE
CMT Operations Manager
LIMITATIONS: The test resulla presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(eompos .o.~,?tPh~ ~elu~iv~e use e clients to whom they are addressed and shall not be repro ......... P
reports are ............ of th ~m~taxf~_
WATER
INJECTION OBSERVATION
Client:
Duke Realty Services, LP
Project:
Freeport Xl & XII
Coppell, Texas
~of lime was checked and found to be 1.14 and 1.17 ~
Lime slunV was continuously a~ed ~
Surfactant was added to each load
~ressure was kept between 50 to 100 si at intof in'ection
5. Intervals of 12" were achieved durin~ocess until refusal
6. Total d~ction -'~ ~ f~"~et
7. Max. s acin of in'ection robes was recorded to be 5 ft.
Report No.: 215880
Project No.: 049245
Date of Service: 8/13/2004
Page 2 of 3
X
.._Free lime on surface ~ ~ ~--~
~ on this date
10. Location of in'ection:--~west sides of ad Xli 49,200 s . ft, south and west border of Xli 9,400 s . ft.
Remarks:
See attached for sketch of injected area, pass number for each area.
Time:
Technician:
6:30am - 5:00pm
Nathan Witherell
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for
variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they ara addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Ltd.
Page
North
370_
Client:
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 216569
Project No.: 049245
Date of Service: 08/24/2004
Report Date: 09/08/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:45am - 6:30pm
Page 1 of 4
T~chnician: Nathan Witherell
Report Distribution:
(1) Duke Rcalty Services, 12
(1) Extranet
(1) City of Coppell
(1) City of Coppell
Rone Engineers, Ltd.
'-~o~- K. Scott Watson, AET
CMT Operations Manager
resu ts ~-sented h~rein were prepared based upon the specific samples provided for testing. We essmne no responsibility for vafimion in quality
LIMITATIONS: The test P ........ '=-~ = ............. ditions over which we have no control. Our lett~s and
(composition, apI~arance, performlm , . .) Y.~ ....... ~ --~ -~-- ~* ~- .~roduced excent in full without the written approval of Rone Engineers, Ltd.
reports are for thc exclusive usc of thc c ey
WATER
INJECTION OBSERVATION
Client: Duke Realty Services, LP Report No.: 216569
Project No.: 049245
Project: Freeport XI & XII Date of Service: 24-Aug
Coppell, Texas Page 2 of 4
DESCRIPTION/EXPLANATION YES NO NIA
1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X
2. Lime slurry was continuously agitated X
3. Surfactant was added to each load X
4. The iniection pressure was kept between 50 to 100 psi at point of injection x
5. Intervals of 12" were achieved during injection process until refusal x
6. Total depth of iniection 10 feet X
7. Max. spacin~l of iniection probes was recorded to be 5 f. X
3. Free lime on surface X
;). Square feet iniected on this date 42,900
10. Location of injection: Northeast corner of pad XI, east side mid-length, borders of south section
Remarks:
See attached for sketch of injected area.
Time:
Technician:
6:45am - 6:30pm
Nathan Withereil
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for
variation in quality (composition, appearance, peri'ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Ltd.
'~1~ ',o~v~o~
~' Deta~ Page
,III
--~o _. o ~ ~ ~1 ~ ~.~. ~ .
/ ,.'"'~ I ' ~o.~o~ .1~0'~=
~' ,o North
1:2.,0oo
~2,"'1 ~0oo
.~ 5-oo u~e~- ~.
.~.~. t%c
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., St¢ 360
Dallas TX 75254
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Project: Freeport XI & XII
Coppell, Texas
Report No.: 215432
Project No.: 049245
Date of Service: 08/09/2004
Report Date: 09/08/2004
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:00am - 5:45pm
Page 1 of 3
T~chnician: Nathan Witherell
Report Distribution:
(1) Duke Realty Services, LP
(1) Exmmet
(1) City of Coppell
(1) City of Coppell
Rone Engineers, Ltd.
~'~,,- K. Scott Watson, AliT
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, eppcarmacc, pcffonnancc, crc.) or any other feature of similar subject matter provided by persons or condiUoas over which wc have no contxol Our lcttm-s
repotls are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except m full w~thout the wntWa approval of Rone Engineers, Ltd
~ Pa~e I of I
WATER
INJECTION OBSERVATION
Client:
Duke Realty Services, LP
Project:
Freeport Xl & XII
Coppell, Texas
DESCRIPTION/EXPLANATION
~ was checked and found to be 1.14 and .1.17 ~
2, Lime slur~ was continuousl_~_~.Ltated ~
3. Surfactant was added to each load ~
4"--'The injection pressure was k~ 50 to 100 slat intof i~ection 100
..... . . . · .__ .._:_ -~:, o--~.,~1 4~" _ 18"
5. Intervals of 12" were achieved dun~cess um ,~,u~o ,~ ~
6__. Total de~tion - 10 feet
7. Max. sacin of in'ection robes was recorded to be 5 ft.
3~. Free lime on surface
Report No.: 215432
Project No.: 049245
Date of Service: 8/9/2004
Page 2 of 3
48,000
Rema~s:
See attached for sketch of injected area.
Time:
Technician:
6:00am - 5:45pm
Nathan Witherell
LIMITATIONS: The test results presented heroin were proparod based upon the specific samples provided for testing. We assume no rosponsibiiity for
variation in quality (composition, appearance, peflormanco, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written apemvel of Rone Engineers, Ltd.
/~n?~e_ /~o~ ~ ',OBSHRVATIO~V
.~ Detaff Pag~
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Project: Freeport XI & XII
Coppell, Texas
Report No.: 215642
Project No.: 049245
Date of Service: 08/11/2004
Report Date: 09/08/2004
Services: Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform Water Injection Inspection. The results are attached.
Technician Time: 6:30am - 6:15pm
Page 1 of 3
Technician: Nathan Witherell
Report Distribution:
(1) Duke Realty Services, LP
(1) Ex~anet
(1) City of Coppall
(I) City of Copp¢ll
Rone Engineers, Ltd.
K. Scotl Watson, AET
CMT Operations Manager
LIMITATIONS: Thc test results presented herein were prepaid based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, ~c.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports arc for the exclnsive use of the clients to whom they are addressed and shall not be reproduced except in full without the va~t~n approval of Rone Engineers, Ltd.
Pa~e I of I
WATER
INJECTION OBSERVATION
Client: Duke Realty Services, LP Report No.: 215642
Project No.: 049245
Project: Freeport XI & XII Date of Service: 8/11/2004
Coppell, Texas Page 2 of 3
DESCRIPTION/EXPLANATION ~ ~ ~
X
1. Specific gravity of lime was checked and found to be 1.14 and 1.17
X
2. Lime slurry was continuously agitated
X
3. Surfactant was added to each load
4. The injection pressure was kept between 50 to 100 psi at point of iniection 100 x
5. Intervals of 12" were achieved during injection proce~ until refusal 12" - 18" x
6. Total depth of injection - 10 feet X
7. Max. spacing of injection probes was recorded to be 5 ff. X
X
8. Free lime on surface 84,000
;). Square feet injected on this date
10. Location of in'ection: Border of north section 1 ass, finish 1 ass north sec;.;c,F,, start ass 2 on south section
Remarks:
See attached for sketch of injected area.
Time:
Technician:
6:30am - 6:15pm
Nathan Witherell
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility fur
variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without
the written approval of Rone Engineers, Ltd.