ST9401-LR 980831Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1084 CLIENT: Rebcon, Inc. DATE: 31 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at southbound bridge, Abutment D, east wing LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 711 Ticket NO. 1129843 Time Batched 1:57pm Time Sampled 2:25pm Concrete Temp. IASTM C1064) 97°F Air Content (ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS (ASTU c3m MIX NO. 0784 plus 1 Sk. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day IASTM C143l psi Strength 73 5.75 7 09/07/98 74 5.75 7 09/07/98 75 5.75 28 09/:28/98 76 5.75 28 09/28/98 110,600 3910 114,500 4050 154,800 5480 147,100 5200 28-Day Average 5340 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 28 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier, west wing shaft on Abutment D LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 836 Cement Ticket No. 1128659 Flyash Time Batched 1:34pm Sand Time Sampled 2:00pm in. Concrete Temp. (ASTM C10641 100°F 1.0 in. Air Content (ASTM C231~ 3.8% Water Unit Weight IASTM C138) Admix #I Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 69 6.00 7 09/04/98 70 6.00 7 09/04/98 71 6.00 28 09/25/98 72 6.00 28 09/25/98 100,000 3540 98,6OO 3490 128,800 4560 123,300 4360 28-Day Average 4460 3OO0 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: ~en Tap Road, Cop~ell, TX LOCATION OF POUR SET 1: Pier D/1 LOCATION OF POUR SET 2: Grade beam, south side of bridge SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. {ASTM C1064) 1.0 in. Air Content (ASTM C231} Water Unit Weight (ASTM C138) Admix # 1 Admix #2 AEA JOB NO.: 98.1064 DATE: 27 August 1998 SUPPLIER: COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 61 7 09~03~98 104,600 3700 62 7 09~03~98 108,600 3840 63 28 09/24/98 129,100 4570 64 28 09/24/98 130,300 4610 28-Day Average 4590 65 7 09/03/98 92,700 3280 66 7 09/03/98 98,100 3400 67 28 09/24/98 120,200 4250 68 28 09/24/98 117,100 4140 28-Day Average 4200 3O0O 3000 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebc0n, Inc. DATE: 27 August 1998 PROJECT: Denton Tap Road, CoppelI, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: lO:OOam-11 :OOam 1.0 hour PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE D/1 30" (6) (5) (5) (5) (5) 60.0' (6) (7) NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in pier~ within 8 hours of drilling completion, unless noted otherwise. 3) Depth to Grey and Total Depth were measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) All measurements were given to inspector by contractor. Drilling was completed by the time inspector arrived on job. 6) Concrete was not on job at this time. Inspector left cylinder molds with Armando with Rebcon, Inc. 7) Approx. 25' of water in hole. Concrete placed under water with solid tremie. TECHNICIAN: DISTRIBUTION: MS (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier D/1 LOCATION OF POUR SET 2: Grade beam, south side of bridge JOB NO.: DATE: SUPPLIER: 98.1064 27 August 1998 SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. (ASTM C1064) Air Content IASTM c2311 Unit Weight IASTM C1 SET 1 SET 2 MIX NO. Cement Ftyash Sand iR. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS [ASTM C39i (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 2S-Day {ASTM C143) psi Strength 61 7' 09/03/98 62 7 09/O3/98 63 28 09/24/98 64 28 09/24/98 65 7 09~03~98 66 7 09~03~98 67 28 09/24/98 68 28 09/24/98 104,600 37OO 108,600 384O 28-Day Average 92,700 3280 96,100 3400 3000 28-Day Average 3000 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVAT ON CLIENT: Rebcon, Inc. DATE: 28 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 1 :OOpm-3:OOpm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC, ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE Abutment D 18" (5) West Wing Shaft 64.24' (6) NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Depth to Grey and Total Depth were measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) 18" diameter required; however, pier drilled as 24". Reinforcing used was 6-#6's in spiral. 6) Approx. 40' of water in pier. Concrete placed under water with solid tremie. TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 28 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier, west wing shaft on Abutment D LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 836 Cement Ticket No. 1128659 Flyash Time Batched 1:34pm Sand Time Sampled 2:00pm in, Concrete Temp. IASTM C1064} 100°F 1.0 in. Air Content (ASTM c2311 3.8% Water Unit Weight {ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 69 6.00 7' 09/04/98 70 6.00 7 09/04/98 71 6.00 28 09/25/98 72 6.00 28 09/25/98 100,000 3540 98,600 3490 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75228 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, inc. DATE: 31 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 TIME: 1:30pm-3:OOpm DRILLER: Texas Shafts, inc. 1.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE Abutment D 24" East Wing 61.2' 61.2' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in p~ers within 8 hours of drilling completion, unless noted otherwise. 3) Required depth furnished by contractor. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 31 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at southbound bridge, Abutment D, east wing LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 711 Cement Ticket No. 1129843 Flyash Time Batched 1:57pm Sand Time Sampled 2:25pm in. Concrete Temp. {ASTM C1064) 97°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138~ Admix #1 Admix #2 AEA 0784 plus 1 Sk. COMPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 2S-Day (ASTM C143) psi Strength 73 5.75 7' 09~07~98 74 5.75 7 09~07~98 75 5.75 28 09~28~98 76 5.75 28 09/28/98 110,600 3910 114,500 4050 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. {1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier D/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 421 Ticket No. 1126001 Time Batched 10:$2am Time Sampled 11:30am Concrete Temp. IASTM C10641 98°F Air Content (ASTM C231) 3.9% Unit Weight (ASTM Cl SET 2 COMPRESSIVE STRENGTH TESTS {ASTM C39) JOB NO.: 98.1064 DATE: 26 August 1998 SUPPLIER: TXI MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM Cl 43) psi Strength 57 6.25 7 09/02/98 58 6.25 7 09/02/98 59 6.25 28 09/23/98 60 6.25 28 09/23/98 93,000 3290 96,900 343O 123,900 4380 117,700 4160 28-Day Average 4270 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 73229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 26 August 1998 PROJECT: Denton Tap Road, Coppetl, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 10:30am-12:30pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE D/2 30" 61.6' 12:00 (7) NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, untess noted otherwise. 3) Depth to Grey and Total Depth were measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing used was 8-#10 bars in spiral. 6) Total depth furnished by contractor. Concrete already being placed when inspector arrived on jobsite at 11 :lOam. 7) Concrete placed under water with solid tremie pipe. TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214) :~51-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier D/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 421 Ticket No. 1126001 Time Batched 10:52am Time Sampled 11:30am Concrete Temp. IASTM C1064) 98°F Air Content (ASTM C231) 3.9% Unit Weight {ASTM C138) SET 2 MIX NO. Cement Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 26 August 1998 SUPPLIER: TXI COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 57 6.25 7~ 09/02/98 58 6.25 7 09/02/98 59 6.25 28 09/23/98 60 6.25 28 09/23/98 93,000 3290 96,900 3430 28-Day Average 3O0O TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc, (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppeli, TX SUPPLIER: LOCATION OF POUR SET 1: Columns, bent #3, north side of creek LOCATION OF POUR SET 2: 98.1064 25 August 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO, Truck No. 716 Cement Ticket No. 1077~43 Flyash Time Batched 1:48pm Sand Time Sampled 2:20pm in. Concrete Temp. (ASTM C1064) 109°F 1.0 in. Air Content (ASTM C231) Water Unit Weight {ASTM C1381 Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 53 4.00 7' 09/01/98 54 4.00 7 09/01/98 55 4.00 28 09/22/98 56 4.00 28 09/22/98 110,200 3900 110,400 3910 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EB (2:00pm-3:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214} 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier D/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET I Truck No. 643 Ticket No. 1124881 Time Batched 11:04am Time Sampled 11:30am Concrete Temp. (ASTM C10641 92°F Air Content IASTM C231) 4.2% Unit Weight (ASTM C1 SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 25 August 1998 SUPPLIER: TXI 784 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143i psi Strength 49 6.75 7' 09/01/98 50 6.75 7 09/01/98 51 6.75 28 09~22~98 52 6.75 28 09122198 100,000 3540 99,600 3520 28-Day Average 3OOO TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hopper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier D/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 643 Ticket No. 1124881 Time Batched 11:04am Time Sampled 11:30am Concrete Temp. (ASTM C1064) 92°F Air Content (ASTM C231) 4.2% Unit Weight (ASTM c13e! SET 2 MIX NO. Cement Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 25 August 1998 SUPPLIER: TXI 784 COMPRESSIVE STRENGTH TESTS iASTM C391 Cylinder Slump Age Test Number Inches Days Date {ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 49 6.75 7 09/01/98 50 6.75 7 09/01/98 51 6.75 28 09/22/98 52 6.75 28 09/22/98 100,000 3540 99,600 3520 127,100 4500 124,600 4410 2B-Day Average 4460 3O0O TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell /~t4~ 3;1-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 25 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay 2) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf ~ 13.0% Moisture 2) 102.0 pcf ~ 18.0% Moisture LOCATION PROCTOR LIFT BELOW Bac/kfill Storm Drain Main "B" SUBGRADE 121) approx. Station 8+50 1 2'-3' 122) approx. Station 8+75 2 1'-2' 123) approx. Station 9+25 2 1'-2' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 18.0 18.5 20.3 107.9 99.0 95+ Optimum to +5% 97.0 95.1 100.9 98.9 TECHNIC, lAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppetl, Garreth Campbell 2870 Walnut Hill Lane E)allas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 25 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, inc. TIME: 11 :OOam-1 :OOpm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE D/3 (6) 30" 65.9' (7) NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Depth to Grey and Total Depth were measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing used was 8-#10's in spiral. 6) information furnished by contractor. Scheduled pour for 11:30am. Began before inspector arrived on jobsite at 11:25am. 7) Concrete placed under water with solid tremie pipe. TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 25 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Columns, bent #3, north side of creek LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 716 Cement Ticket No. 1077143 FIyash Time Batched 1:48pm Sand Time Sampled 2:20pm in. Concrete Temp. (ASTM C1064) 109°F 1.0 in. Air Content IASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS (ASTM C39~ (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C1431 psi Strength 53 4.00 7 09/01/98 54 4.00 7 09/01/98 55 4.00 28 09/22/98 56 4.00 28 09/22/98 110,200 3900 110,400 3910 128,900 4560 130,700 4620 28-Day Average 4590 3000 TECHNICIAN: DISTRIBUTION: EB (2:00pm-3:3Opm) {1) Rebcon, Inc. (1) Ciw of Coppeil, Garreth Campbell Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, CoppeH, TX LOCATION OF POUR SET 1: Pier C/1, bottom half LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 539 Ticket No. 1122837 Time Batched 1:00pm Time Sampled 1:50pm Concrete Temp. (ASTM C1064) 96°F Air Content (ASTM C231) Unit Weight (ASTM C13Bi SET 2 COMPRESS/VE STRENGTH TESTS (ASTM C39) MIX NO. Cement Flyash Sand 1.0 m. Water Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 21 August 1998 SUPPLIER: TXI 784 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 2B-Day (ASTM C143) psi Strength 45 6.25 7' 08/28/98 46 6.25 7 08/28/98 47 6.25 28 09/18/98 48 6.25 28 09/18/98 103,400 366O 103,400 366O 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill L.ane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT:~,D .e~, ton Tap Road, ~oppell, TX LOCATION OF POUR SET 1: Pier C/1, bottom half LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 539 Ticket No. 1122837 Time Batched 1 :OOpm Time Sampled 1:50pm Concrete Temp. (ASTM C1064) 96°F Air Content {ASTM C231) Unit Weight (ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS {ASTM C39) MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix //2 AEA JOB NO.: 98.1064 DATE: 21 August 1998 SUPPLIER: TXI 784 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day IASTM C143) psi Strength 45 6.25 7 08/28/98 46 6.25 7 08/28/98 47 6.25 28 09118/98 48 6.25 28 09/18/98 103,400 3660 103,400 366O 137,500 4860 130,000 4600 28-Day Average 4730 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIq;HT SHAFT PIER iNSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 21 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 12:00 Noon-2:3Opm 2.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE C/I 36" 69.2' 69.2' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Total depth, reinforcing verification, and made 1 set cylinders only, per Rebcon. 4) Required depth furnished by Rebcon. 5) Concrete originally scheduled for 12:30pm. Moved to 1:30pm after inspector arrived at jobsite. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Cased pier C/2 (south side of Denton Creek) LOCATION OF POUR SET 2: 98.1064 20 August 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 463 Cement Ticket No. 1121333 Flyash Time Batched 9:55am Sand Time Sampled 10:35am in. Concrete Temp. IASTM C1064) 95°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138} Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS (ASTM c39~ (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test T0tat Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 41 5.00 7' 08/27/98 42 5.00 7 08/27/98 43 5.00 28 09/17/98 44 5.00 28 09/17/98 127,300 4500 126,300 4470 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Cased pier C/2 (south side of Denton Creek) SAMPLE DATA: SET 1 SET 2 MIX NO. 784 Truck No. 463 Cement Ticket No. 1121333 Flyash Time Batched 9:55am Sand Time Sampled 10:35am in. Concrete Temp. (ASTM C1064) 95°F 1.0 in. Air Content iASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 98.1064 20 August 1998 TXI COMPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number inches Days Date Pounds Strength 28-Day (ASTM Cl 43) psi Strength 41 5.00 7' 08/27/98 42 5.00 7 08/27/98 43 5.00 28 09/17/98 44 5.00 28 09/17/98 127,300 4500 126,300 447O 150,400 5460 162,600 5750 2B-Day Average 5610 30OO TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc, (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214)-351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 20 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay 2) On-Site Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 102.0 pcf ~ 18.0% Moisture 2) 109,0 pcf L~ 13.0% Moisture LOCATION PROCTOR LIFT BELOW MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Backfill Over 60" Storm Drain Main "B" SUBGRADE 113) approx. Station 6+20 1 1'-2' 22.5 102.0 100.0 114) approx. Station 5+75 2 1'-2' 17.7 104.4 95.8 115) approx. Station 6+50 1 2'-3' 21,5 101.6 99.6 116) approx. Station 6+90 2 4' 17.1 107.6 98.7 117) approx. Station 7+30 2 6' 17.1 104.8 96.1 118) approx. Station 7+60 2 3' 16.8 110.8 101.7 119) approx. Station 7+30 2 2' 18.0 106.2 97.5 120) approx. Station 7+20 2 1' 16.9 111.2 102.1 95+ Optimum to + 5% TECHNICIAN: DISTRIBUTION: CDJ (2 trips) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 20 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 9:30am-11:00am 1.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE C/2 36" 64.4' Trace NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing cage had 8-#9 vertical bars with spiral rings. TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 19 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 99.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf ~ 13.0% Moisture LOCATION PROCTOR Backfill Over 60" Storm Drain Mein "B" 109) approx. Station 6 + 50 1 110) approx. Station 6+00 2 111) approx. Station5+50 1 112) approx. Station 5 + O0 MOISTURE LIFT CONTENT % BELOW EXIST. SUBGRADE 5'-6' 18.O 4' 20.9 3'-4' 16.2 2' 17.8 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 105.3 96.6 95 + 101.3 99.3 Optimum to +5% 105.9 97.2 107.1 98.3 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, inc. (1) City of Coppell, Garreth Campbell 2570 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 19 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 12:00 Noon-1:30pm 1.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D, ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE C/3 36" 67.3' 1:30 None NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing used was 12-#10 bars in spiral. TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Sheet piling cap beam north side of creek, line 3.5 to west end of beam LOCATION OF POUR SET 2: 98.1064 19 August 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 806 Cement Ticket No. 1120549 Flyash Time Batched 12:57pm Sand Time Sampled 1:50pm in. Concrete Temp. IASTM C1064) 96°F 1.0 in. Air Content (ASTM C231) 3.2% Water Unit Weight (ASTM c13e) Admix //1 Admix #2 AEA 8272 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 37 4.00 7' 08/26/98 38 4.00 7 08/26/98 39 4.00 28 09/16/98 40 4.00 28 09/16/98 85,100 3010 85,0OO 3010 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier C/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 835 Ticket No. 1120505 Time Batched 12:14pm Time Sampled Concrete Temp. {ASTM C1064) 98°F Air Content (ASTM C231) 4-,2% Unit Weight ~ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) JOB NO.: 98.1064 DATE: 19 August 1998 SUPPLIER: TXI MIX NO. 784 Cement Flyash Sand Water Admix //1 Admix //2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM Cl 43) psi Strength 33 6.25 7' 08/26/98 34 6.25 7 08/26/98 35 6.25 28 09/16/98 36 6.25 28 09/16/98 115,600 4090 112,700 3990 153,600 5430 147,300 5310 28-Day Average 5320 3OO0 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214).351-6419 Fax (214) 381-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98,1064 CLIENT: Rebcon, Inc. DATE: 19 August 1 998 PROJECT: Denton Tal~ Road, Coppelt, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Sheet piling cap beam north side of creek, line 3.5 to west end of beam LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 806 Cement Ticket No. 11205~-9 Flyash Time Batched 12:57pm Sand Time Sampled 1:50pm in. Concrete Temp. (ASTM C1064) 96°F 1.0 in. Air Content (ASTM C231) 3.2% Water Unit Weight IASTM C13e) Admix #1 Admix #2 AEA 8272 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 37 4.00 7' 08/26/98 38 4.00 7 08/26/98 39 4.00 28 09/16/98 40 4.00 28 09/16/98 85,100 3010 85,000 3010 118,900 4200 109,900 3890 28-Day Average 4050 300O TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier C/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 784 Truck No. 835 Cement Ticket No. 1120505 Flyash Time Batched 12:14pm Sand Time Sampled in. Concrete Temp· (ASTM C1064i 98°F 1.0 in. Air Content (ASTM C231) 4.2% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA JOB NO.: 98.1064 DATE: 19 August 1998 SUPPLIER: TXI COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth ZS-Day (ASTM C143) pSI Strength 33 6.25 7 08/26/98 115,600 4090 34 6.25 7 08/26/98 112,700 3990 35 6.25 28 09/16/98 36 6.25 28 09/16/98 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 18 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 10:30am-12:30pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC, ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE NE wind wall pier 24" 63.4' None NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing cage was 6-#6 vertical bars with a spiral ring. Pier was drilled as 24" diameter instead of 18" diameter called for. TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 18 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Cased pier at northeast wind wail, north side of creek LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 383 Cement Ticket No. 1119335 Flyash Time Batched 11: 19am Sand Time Sampled 11:50am in. Concrete Temp. (ASTM C1064) 95°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 29 5.75 7 08/25/98 30 5.75 7 08/25/98 31 5.75 28 09/15/98 32 5.75 28 09/15/98 103,500 3660 101,700 3600 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, inc. DATE: 18 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay 2) On-Site Fiji - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 102.0 pcf ~ 18.0% Moisture 2) 109.0 pcf L~ 13.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Ba[:kfill Over 60" Storm Drain Main "B" EXIST. SUB, 100) approx. Station 1+50 RETAKE 1 1' 20.1 103.2 101.2 101) approx. Station 1 +00 RETAKE 2 2' 13.0 104.3 95.7 102) approx. Station 4+25 1 2'-3' 23.8 86.5 84.8* 103) approx. Station 4+50 1 3'-4' 18.8 94.3 92.5* 104) approx. Station 5+00 1 3'-4' 20.3 102.2 100.2 105) approx. Station 6+00 1 3'-4' 22.7 97.0 95.1 106) approx. Station 5+00 1 4'-5' 22.4 97.1 95.2 107) approx. Station 5+50 1 6' 21.1 98.1 96.2 108) approx. Station 6+00 1 8'-9' 21.7 97.9 96.0 95+ Optimum to + 5% *Test results indicate fill is not compacted to required density/moisture, Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 1 8 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Cased pier at northeast wind wall, north side of creek LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 383 Ticket No. 1119335 Time Batched 11:19am Time Sampled 11:50am Concrete Temp, (ASTM C1064) 95°F Air Content (ASTM C231) Unit Weight (ASTM C138) SET 2 MIX NO. 784 Cement Flyash Sand iR. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C143) psi Strength 29 5.75 7' 08/25/98 30 5.75 7 08/25/98 31 5.75 28 09/15/98 32 5.75 28 09/15/98 103,500 3660 101,700 3600 131,400 4650 129,100 4570 28-Day Average 4610 300O TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 17 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier, northwest wing wall pier at west bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 802 Cement Ticket No. 1118456 Flyash Time Batched 3:03pm Sand Time Sampled ~-:25pm in. Concrete Temp. {ASTM C1064) 94°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C13e) Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143} psi Strength 25 6.00 7' 08/24/98 26 5.00 7 08/24/98 27 5.00 28 09/14/98 28 5.00 28 09/14/98 116,500 4120 119,900 4240 150,80~ 5320 146,300 5170 28-Day Average 5250 3000 TECHNICIAN: DISTRIBUTION: GB (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Pier, northwest wing wall pier at west bridge LOCATION OF POUR SET 2: 98.1064 17 August 1998 tXl SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 802 Cement Ticket No. 1118456 Flyash Time Batched 3:03pm Sand Time Sampled 4:25pm in. Concrete Temp. (ASTM C1064) 94°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix //1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM Cl 43) ps1 Strength 25 5.00 7' 08~24~98 26 5.00 7 08~24/98 27 5,00 28 09/14~98 28 5.00 28 09/14~98 116,500 4120 119,900 4240 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: GB (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc. DATE: 17 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 102.0 pcf @ 18.0% Moisture 97) 98) 99) LOCATION PROCTOR Ba(;kfill Over 60" Storm Drain Main "B" Station 4 + 50 1 Station 5 + 50 1 Station 5 + O0 1 LIFT BELOW SUBGRADE 4'-5' 7'-8' 6'-7' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 19.9 22.2 22.3 97.5 95.6 95+ Optimum to + 5% 98.1 96.2 97.4 95.5 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppel[, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Tearing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 17 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 2:00pm-5:00pm 3.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE ' (6) 24" (5) (7) (5)/ok 62.1' 62.2' (7) 3" NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Plans call for 18" pier but pier was drilled to a 24" and cased. Pier started before technician arrived at job. S) Northwest wing wall pier on west bridge 7) Contractor still placing concrete in pier when technician left project. TECHNICIAN: DISTRIBUTION: GB (1) Rebc0n, Inc. (1) City of C0ppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materiels Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 17 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 9:30am-10:30am 1.0 hour PIER SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER MARK DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE False start. Trip charge only, Pour cancelled. Lab, not notified until technician was already at jobsite. TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF PIER INSPECTION CLIENT: PROJECT: DRILLER: Rebc0n, Inc. Denton Tap Road, Coppe[I, TX Texas Shafts DATE: 14 August 1998 JOB NO.: 98.1064 TIME: 9:30am-1 :OOpm 3.50 hours Pier Mark A/1 Actual Shaft Diameter 30" Total Depth of Shaft 62.3' Required Depth 62.2' Vertical Reinforcing 8-#9 Time Complete Drilling 11:55am Time Set Reinf. Cage 11:58am Time Start Concrete 12:02pm NOTES: 1) Concrete delayed from 10:00am to 11:30am after inspector arrived at jobsite. Concrete arrived at 11:50am. 2 Pier reinforcing verified to be correct in accordance with project plans and specifications. TECHNICIAN: MFM DISTRIBUTION: (1) Rebcon, Inc. {1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 14 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 102.0 pcf @ 18.0% Moisture 91) 92) LOCATION PROCTOR LIFT BELOW Backfill @ 60" Storm Sewer (Line "B") SUBGRADE Station 3 + 75 1 6' Station 4 + 25 1 7' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 20.1 19.7 97.2 95,3 95+ Optimum to + 5% 101.5 99.5 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 14 August 1998 PROJECT: Denton Tap Road, C0ppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay 2) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf ~ 13.0% Moisture 2) 102.0 pcf ~ 18.0% Moisture 93) 94) 95) 96) LOCATION PROCTOR Backfill Over 60" Storm Sewer Storm Drain Main "B" approx. Station 1 + 00 1 approx. Station 1 +50 2 approx. Station 4 + 50 2 approx. Station 5 + 00 2 MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW EXIST. GRADE 2' 11.4' 99.9 91.7' 95 + 1' 22.8 91.7 89.9* Optimum to +5% 8' 22.7 100.6 98.6 7' 21.0 98.7 96.7 *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 14 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at new southbound bridge, #A/l, bottom half LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 456 Cement Ticket No. 1117068 Flyash Time Batched 11:33am Sand Time Sampled 12:OSpm in. Concrete Temp. (ASTM cIOe4) 94°F 1.0 in. Air Content {ASTM C231) Water Unit Weight (ASTM C1381 Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 21 6.25 7' 08/21/98 22 6.25 7 08/21/98 23 6.25 28 09/11/98 24 6.25 28 09/11/98 117,100 4140 115,100 4070 141,800 5020 146,300 5170 28-Day Average 5100 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 14 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at new southbound bridge, #A/l, bottom half LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. ¢56 Cement Ticket No. 1117068 Flyash Time 13atched 11:33am Sand Time Sampled 12:05pm in. Concrete Temp. (ASTM C1064) 94°F 1.0 in. Air Content {ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 21 6.25 7' 08/21/98 117,100 4140 22 6.25 7 08/21/98 115,100 4070 23 6.25 28 09/11/98 24 6.25 28 09/11/98 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF PIER INSPECTION CLIENT: PROJECT: DRILLER: Rebcon, Inc, Denton Tap Road, Coppell, TX Texas Shafts DATE: 13 August 1998 JOB NO.: 98.1064 TIME: 10:30am-1 :OOpm 2.50 hours Pier Mark A/2 Actual Shaft Diameter 30" Total Depth of Shaft 62,2' Required Depth 61.8' Vertical Reinforcing 8-#9 Time Complete Drilling 11:35am Time Set Reinf. Cage 11:36am Time Start Concrete 11:38am NOTES: 1) Contractor asked Hooper Engineering to verify depth, rebar and make cylinders only. 2 Pier reinforcing verified to be correct in accordance with project plans and specifications. 3) Concrete ptaced in piers within 8 hours of drilling completion, unless noted otherwise.. TECHNICIAN: MFM DISTRIBUTION: {1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 13 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf @ 13.0% Moisture 85) 86) LOCATION PROCTOR Backfill Over 60" Storm Sewer Storm Drain Main "B" approx. Station 2 + O0 approx. Station 1 +50 MOISTURE LIFT CONTENT % BELOW EXIST. GRADE 1 4'-5' 18.0 1 6'-7' 13.6 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 108.9 99.9 95+ Optimum to + 5% 104.4 95.8 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 13 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOb NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 102.0 pcf ~ 18.0% Moisture 87) 88) 89) 90) LOCATION PROCTOR LIFT Backfill (~ 60" Storm Sewer (Line "B") Station 2 + 00 1 Station 1 + 25 1 Station 3 +75 1 Station 4 + 50 1 BELOW SUBGRADE MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 4' 19.0 5' 18.5 7' 18.2 8' 23.1 98.4 96.5 95+ 102.5 100.5 Optimum to +5% 100.2 98.2 97.2 95.4 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, inc. DATE: 13 August 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier A/2 at new bridge, bottom half of pier LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 474 Cement Ticket No. 1115903 Flyash Time Batched 11:09am Sand Time Sampled 11:45am in. Concrete Temp. (ASTM C~O64) 94°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 784 6 sks. Class "C" COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 17 6.50 7' 08/20/98 106,500 3770 18 6.50 7 08/20/98 110,500 3910 19 6.50 28 09/10/98 131,000 4630 20 6.50 28 09/10/98 134,900 4770 28-Da¥ Average 4700 30OO TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Pier A/2 at new bridge, bottom half of pier LOCATION OF POUR SET 2: 98.1064 13 August 1998 TXl SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 474 Cement Ticket No. 1115903 Flyash Time Batched 11:09am Sand Time Sampled 11:45am in. Concrete Temp. (ASTM cloe4) 94°F 1.0 in. Air Content (ASTM C231) Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 784 6 sks. Class "C" COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C143) psi Strength 17 6.50 7' 08/20/98 18 6.50 7 08/20/98 19 6.50 28 09/10/98 20 6.50 28 09/10/98 106,500 3770 110,500 3910 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 · Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppetl, TX LOCATION OF POUR SET 1: Pier A/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 643 Ticket No. 1115101 Time Batched 1:30pm Time Sampled 2:00pm Concrete Temp. (ASTM C1064) 100°F Air Content {ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C3e} JOB NO.: DATE: SUPPLIER: MIX NO. 784 Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA 98.1064 12 August1998 TXl (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 13 5.00 7' 08/19~98 14 5.00 7 08/19~98 15 5,00 28 09~09~98 16 5.00 28 09/09/98 114,100 4040 113,300 4010 150,200 5310 145,500 5150 28-Day Average 5230 3OO0 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (I) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc. DATE: 12 August 1998 PROJECT: Fairway Drive, C0ppeil, TX JOB NO.: 98.1089 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Grey Clay ASTM D698 STANDARD PROCTOR: 1) 98.0 pcf @ 21.0% Moisture 1) 2) 3) 4) 5) 6) LOCATION PROCTOR LIFT BELOW MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Fill Ar~ North of Belt Line Road SUBGRADE west side 1 10' 21.0 103.0 105.1 centerline 1 1 O' 21.0 103.4 105.5 east side 1 10' 21.8 102.7 104.8 east side 1 8'-9' 21.5 102.2 104.3 centerline 1 8'-9' 21.0 103.2 105.3 west side 1 8'-9' 21.6 103.0 105.1 95+ Optimum to +5% TECHNICIAN: DISTRIBUTION: CDJ (2 trips) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebc0n, Inc. DATE: t2 August 1998 PROJECT: Denton Tap Road, C0ppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 1 :OOpm-3:OOpm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE A/3 30" 65.0' Trace NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete Elevation is relative to grade at time piers were drilled. 5) Reinforcing used 8-//9 bars in spiral. TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier A/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 643 Ticket No. 1115101 Time Batched 1:30pm Time Sampled 2:00pm Concrete Temp. (ASTM C1064) 100°F Air Content (ASTM C231) Unit Weight (ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) JOB NO.: 98.1064 DATE: 12 August 1998 SUPPLIER: TXl MIX NO. 784 Cement Flyash Sand Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Da¥ (ASTM C143) psi Strength 13 5.00 7' 08/19/98 14 5.00 7 08/19/98 15 5.00 28 09/09/98 16 5.00 28 09/09/98 114,100 4040 113,300 4010 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, inc. (1) City of Coppel[, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Pier #B/1, north side of creek LOCATION OF POUR SET 2: 98.1064 11 August1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 714 Cement Ticket No. 1114075 Flyash Time Batched 12:56pm Sand Time Sampled 1:40pm in. Concrete Temp, (ASTM C1064) 95°F 1.0 in. Air Content (ASTM C231) 4.1% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 784 COMPRESS/VE STRENGTH TESTS {ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 9 4.50 7' 08/18/98 10 4.50 7 08/18/98 11 4.50 28 09~08~98 12 4.50 28 09/08/98 104,400 3690 107,800 3810 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. 2STO Walnut Hill [.~ne Dallas , Tsxas 75229 (214) 351.6418 Client: Rebcon, Inc. Project: Denton Tap Road, Coppell, TX Dete: 11 August 1998 Job No: 98.1064 8oil Deecription: Meximum Density : Optimum Moisture : On-Site Fill Brown Silty Clay 102.0 pcf Liquid Limit : 3Y.8 18.0% Plssticity Index : 21.6 Distribution: (1) Rebcon, Inc. (1) City of C0ppell 120 110 100 90 80 MOISTU RE- DENSITY 10 Moisture RELATIONSHIP ASTM D698 20 30 Content percent Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Pier #B/1, north side of creek LOCATION OF POUR SET 2: 98.1064 11 August 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 714 Cement Ticket No. 1114075 Flyash Time Batched 12:56pm Sand Time Sampled 1:40pm in. Concrete Temp. {ASTM C1064) 95°F 1.0 in. Air Content (ASTM C231 ) 4.1% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 784 COMPRESS~YE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 9 4.50 7' 08/18/98 10 4.50 7 08/18/98 1 I 4.50 28 09/08/98 12 4.50 28 09/08/98 104,400 369O 107,800 3810 134,400 4750 141,200 4990 28-Day Average 4870 3OOO TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc. DATE: 11 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay 2) On-Site Fill - Brown Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture 2) 102.0 pcf @ 18.0% Moisture 81) 821 83) 84) LOCATION PROCTOR LIFT Denton TaD Rd. Suborade Station 205 + 75, centerline RETAKE 1 Station 206 + 25, east side RETAKE 1 Backfill Over 60" Storm Sewer approx. Station 2 + 07 2 approx. Station I + 54 2 BELOW SUBGRADE Fin. Sub. 5~ MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 20.8 17.5 105.3 95.7 95+ Optimum to +5% 111.5 101.4 9' 22,2 99.4 97.5 6'-7' 18.4 100.4 98.4 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 11 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts, Inc. TIME: 1:00pm-2:30pm 1.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE B/1 36" ok/ok 73.8' Trace NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top Of Concrete EIevati~n is relative to grade at time piers were drilled. 5) Reinforcing cage was 10-#9 vertical bars with spiral rings. TECHNICIAN: DISTRIBUTION: JWd (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier #B/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 461 Ticket No. ; 11307 Time Batched 2:0Cpm Time Sampled 2:30pm Concrete Temp. (ASTM C1064) 94°F Air Content (ASTM C231) 3,5% Unit Weight (ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IASTM C39) JOB NO.: 98.1064 DATE: 10 August 1 998 SUPPLIER: TXI MIX NO. Cement Flyash Sand in, 1.0 in. Water Admix #I Admix #2 AEA 0784 + extra cement (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 5 6.50 7' 08/17/98 6 6.50 7 08/17/98 7 6.50 28 09/07/98 8 6.50 28 09/07/98 110,000 3890 111,100 3890 142,100 5030 t39,200 4940 28-Day Average 4990 3OOO TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, [nc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 7S229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier #B/3 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 461 Cement Ticket No. 1113071 Flyash Time Batched 2:04pm Sand Time Sampled 2:30pm in. Concrete Temp. (ASTM C1064) 94°F 1.0 in. Air Content {ASTM C231) 3.5% Water Unit Weight {ASTM C13e) Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 10 August 1998 SUPPLIER: TXI 0784 + extra cement COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 5 6.50 7' 08/17~98 110,000 3890 6 6.50 7 08/17/98 111,100 3890 7 6.50 2S 09/07/98 8 6.50 28 09/07/98 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: RJW (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 10 August 1998 PROJECT: Denton Tap Road, Coppetl, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture 79) 80) LOCATION Den~(~n Tao Rd. Suborade Station 205 + 75, centerline Station 206 + 25 PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW SUBGRADE 1 Fin. Sub. 9.7' 1 0.5' 14.7' 115.4 104,9 95+ Optimum to +5% 100.6 91.5' *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbeil 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 7 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill ~ Brown & Tan Clay ASTM O 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture LOCATION PROCTOR LIFT BELOW Denton Tao Rd. Sub.qrade SUBGRADE 76) approx. Station 205+25 1 Fin. Sub. 77) approx. Station 205 + 75 1 5' 78) approx. Station 206+25 1 1' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 19.5 17.5 17.0 110.1 100.1 95+ Optimum to +5% 111,7 101.5 106.5 96.8 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier #B/2, bottom half LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 98.1064 6 August 1998 TXi SAMPLE DATA: SET 1 SET 2 MIX NO. 0784 Truck No. 837 Cement Ticket No. 1110625 Flyash Time Batched 10:42am Sand Time Sampled 11:35am Concrete Temp. {ASTM C1064) 92°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM c13e) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS [ASTM C39] (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143} psi Strength 1 6.00 7' 08/13/98 116,600 4120 2 6.00 7 08/13/98 117,300 4150 3 6.00 28 09/03/98 4 6.00 28 09/03/98 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (t) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 6 August 1998 PROJECT: Denton Tap Road, CoppelI, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 10:00am-12:30pm 2.5 hours PiER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV, PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE B/2 36" (5) (5)/ok 69.6' 70.0' (5) 2" NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise. 3) Total Depth measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 4) Top of Concrete EIevati'on is relative to grade at time piers were drilted. 5) Pier started before inspector arrived on job. Pier finished after inspector left job. This is OK per Rebcon and City of Coppell. 6) Pier B/2 is to be drilled to 379.0' elevation. Required depth furnished by Rebcon. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier #B/2, bottom hatf LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 6 August 1998 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 637 Ticket No. 1110625 Time Batched 10:42am Time Sampled 11:35am Concrete Temp. (ASTM C10641 92°F Air Content (ASTM C231) Unit Weight (ASTM C138} SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39) MIX NO. 0784 Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM Cl 43) pSI Strength 1 6.00 7' 08/13/98 2 6.00 7 08/13/98 3 6.00 28 09/03/98 4 6.00 28 09/03/98 116,600 4120 117,300 4150 151,100 5340 150,600 5330 28-Day Average 5340 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Rebcon, Inc. Denton Tap Road, Coppell, TX MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture LOCATION PROCTOR LIFT DATE: 6 August 1998 JOB NO.: 98.1064 Denl;on Tap Rd. Suborade 73) Station 204+00, east side 74) Station 205+00, centerline 75) Station 206+00, west side MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACT[ON % PCF % % BELOW SUBGRADE 1 Fin. Sub. 17,3 1 Fin. Sub. 18.0 1 1' 17.3 111.5 101.3 95+ -1% to +3% 108.9 99,0 Of Optimum 112.5 102.3 TECHNICIAN: DISTRIBUTION: CDJ (1} Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: PROJECT: DRILLER: Rebcon, Inc. Denton Tap Road, Coppell, TX Texas Shafts DATE: JOB NO.: TIME: PIER SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL MARK DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. 5 August 1998 98.1064 1 :OOpm-4:OOpm 3.0 hours TOTAL FINAL DEPTH POUR B/2 36" -/ok 69.6' (1! WATER IN HOLE NOTES: 1) Drilling cancelled at 3:30pm due to rain. TECHNICIAN: DISTRIBUTION: MFM/CDJ (1) Rebcon, Inc. (1) City of Coppetl, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTR CLIENT: Rebcon, Inc. DATE: 5 August 1998 PROJECT: Dento. n Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture 70) 71) 72) LOCATION PROCTOR LIFT Denton TaD Rd. Subarad~, Station 205 + 00, centerline Station 204 + 00, east side Station 206+00, west side MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW SUBGRADE I Fin. Sub. 17.4 I Fin. Sub. 19.1 1 0.5' 17.3 110.7 100.7 95+ Optimum to + 5% 110.0 100.0 111.2 101.1 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) Cit',/of Coppell, Oarreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 I=ax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 4 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf (~ 17.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Denton Tao Rd. Suborade SUBGRADE 66) Statoin 206+00, west side 1 1' 18.3 67) Station 205+00, east side 1 0.5' 17.0 68) Station 204 + 00, centerline 1 0.5' 19.3 k'll v rW r in 69) 15' east of hydrant north of 1 1' 18.7 Station 210 + 00 108.7 98.8 95 +" 113.1 102.8 Optimum to +5% 106.6 96,9 105.9 96.3 TECHNICIAN: DISTRIBUTION: CDJ {1) Rebcon, Inc. {1) City of CoppeII, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TEST,<; CLIENT: Rebcon, Inc. DATE: 3 August 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 898 STANDARD PROCTOR: 1) 110.0 pcf ~b 17.0% Moisture 63) 64) 65) LOCATION PROCTOR LIFT Denton TaD Rd. Suborade Station 206 + O0 Station 205 + O0 Station 204 + O0 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW SUBGRADE 1 1.5' 17.1 1 1' 20.7 1 1' 17.6 111.7 101.5 95+ Optimum to +5% 106.9 97.2 106.1 97.5 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. {1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148