Loading...
ST9401-LR 980929Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJEC~ap Road, LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: Coppell, TX ~ SUPPLIER: Sidewalk under west bridge, north side of creek, west third of area 98.1064 29 September 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. 8272 Truck No. 456 Cement Ticket No. 1148465 Flyash Time Batched 11:08am Sand Time Sampled 11:50am in. Concrete Temp. (ASTM C1064~ 90°F 1.0 in, Air Content IASTM C231) 3.5% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) {Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 93 5.50 7 10/06/98 94 5.50 7 10/06/98 95 5.50 28 10/27/98 96 5.50 28 10/27/98 92,300 3260 91,800 325O 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (11:30am-1:00pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 29 September 1998 Coppell, TX SUPPLIER: TXI Sidgwalk under west bridge, north side of creek, west third of area SAMPLE DATA: SET 1 SET 2 Truck No. 456 Ticket No, 1148465 , Time Batched 11:08am Time Sampled 11:50am Concrete Temp. IASTM C10641 90°F Air Content (ASTM C231} 3.5% Unit Weight (ASTM C138) MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA 8272 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C143) pal Strength 93 5.50 7 10/06/98 94 5.50 7 10/06/98 95 5.50 28 10/27/98 96 5.50 :~8 10/27/98 92,300 3260 91,800 3250 121,000 4280 117,100 4140 28-Day Average 4210 3000 TECHNICIAN: DISTRIBUTION: MFM (11:30am-1:00pm) (1) Rebcon, Inc, (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallaa. Texaa 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: West side bridge cap, line C LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 25 September 1998 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 669 Ticket No. 1146342 Time Batched 11:40am Time Sampled 12:00 N Concrete Temp. (ASTM C1064) 90°F Air Content (ASTM C231} Unit Weight {ASTM C138) SET 2 MIX NO. Cement Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C 143) psi Strength 89 3.00 7 10/02/98 90 3.00 7 10/02/98 91 3.00 28 10/23/98 92 3.00 28 10/23/98 129,300 4570 134,500 4760 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MS (10:30am-12:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: West side bridge cap, line C LOCATION OF POUR SET 2: 98.1064 25 September 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 669 Cement Ticket No. 1146342 Fiyash Time Batched 11:40am Sand Time Sampled 12:00 N in. Concrete Temp. IASTM C1064) 90°F 1.0 in. Air Content (ASTM C2311 Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS (ASTM C39) Cylinder Slump Ar~e Test Number Inches Days Date (ASTM C143) {Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 89 3.00 7 10/02/98 90 3.00 7 10/02/98 91 3.00 28 10/23/98 92 3.00 28 10/23/98 129,300 4570 134,500 4760 162,600 5750 168,100 5950 28-Da¥ Average 5850 3000 TECHNICIAN: DISTRIBUTION: MS (10:30am-12:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texes 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JO8 NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET I: Footing on outside piers on north side of bridge, west side of Denton Tap LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 713 Cement Ticket No. 1142725 FIyash Time Batched 10:32am Sand Time Sampled 11:02am in. Concrete Temp. (ASTM cloe4) 94°F 1.0 in. Air Content (ASTM C231 ) 4.2% Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 8274 98.1064 22 September1998 TXI COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 85 3.00 7 09/29/98 86 3.00 7 09/29/98 87 3.00 28 10/20/98 88 3.00 28 10/20/98 121,600 4300 123,200 4360 153,200 5420 157,800 5580 28-Day Average 5500 4000 TECHNICIAN: DISTRIBUTION: JWJ (1(~:30am-12:00 Noon) (1) Rebcon. Inc. (1) City ol' Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JO8 NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Footing on outside piers on north side of bridge, west side of Denton Tap LOCATION OF POUR SET 2: 98.1064 22 September 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 713 Cement Ticket No. 1142725 Flyash Time Batched 10:32am Sand Time Sampled 11:02am in. Concrete Temp. (ASTM C10641 94°F 1.0 in. Air Content {ASTM C231) 4.2% Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 8274 COMPRESSIVE S TRENG TH TES TS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C143) ps1 Strength 85 3.00 7 09/29/98 86 3.00 7 09/29/98 87 3.00 28 10/20/98 88 3.00 28 1 0/20/98 121,600 4300 123,200 4360 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: JWJ (10:30am-12:00 Noon) (1) Rebcon. Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallaa, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 15 September 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Column cap, line B, southbound bridge, bottom of two lifts LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 829 Ticket No. 1139284 Time Batched 12:38pm Time Sampled 1:10pm Concrete Temp. IASTM C1064) 88°F Air Content (ASTM C2311 Unit Weight (ASTM C138) SET 2 MIX NO. 8274 Cement Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 81 4.50 7 09/22/98 82 4.50 7 09/22/98 83 4.50 28 10/13/98 84 4.50 28 10/13/98 127,600 4510 125,600 4440 2S-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (12:30pm-2:00pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 7'5229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 15 September 1998 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Column cap, line B, southbound bridge, bottom of two lifts LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 829 Ticket No. 1139284 Time Batched 12:38pm Time Sampled 1:1 Opm Concrete Temp. (ASTM C1064) 88°F Air Content (ASTM C231l Unit Weight IASTM C138) SET 2 MIX NO. 8274 Cement Flyash Sand 1,0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143I psi Strength 81 4.50 7 09/22/98 82 4.50 7 09/22/98 83 4.50 28 10/13/98 84 4.50 28 10/13/98 127,600 4510 125,600 4440 159,600 5650 156,200 5520 28-Day Average 5590 3000 TECHNICIAN: DISTRIBUTION: MFM (12:30pm-2:00pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 11 September 1998 PROJECT: Denton Tap Road, CoppelI, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf @ 13.0% Moisture 144) LOCATION MOISTURE PROCTOR LIFT CONTENT % BELOW EXIST. GRADE 1 Fin. Sub. 15.0 Backfill (~ Removal of Existinq 48" Storm Drain ~ intersection of Denton Tap and Natches Trace Backfill Over 60" Storm Drain Main B 145) approx. Station 0 + 50 146) approx. Station 0 + 50 147) approx. Station 0+50 148) approx. Station 0+75 149) approx. Station 0+75 150) approx. Station 0+75 151) approx. Station 0+75 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 105.5 96.8 95+ 1 5'-6' 13.2 103.9 95.3 1 7'-8' 13.1 106.0 97.2 1 9'-10' 15.5 108.6 99.6 1 5'-6' 13.4 106.1 97.3 1 7'-8' 14.9 106.1 97.3 1 9'-10' 13.9 106.4 97.6 1 10'-1~1' 14.6 105.8 97.1 Optimum to +5% TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 10 September 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf @ 13.0% Moisture 141) 142) 143) MOISTURE LOCATION PROCTOR LIFT CONTENT % BELOW EXIST. Backfill (~ver 60" Storm Drain Main B GRADE approx. Station 0 + 40 1 3'-4' 17.9 approx. Station 0 + 50 1 1'-2' 14.2 approx. Station 0 + 80 1 3'-4' 13.2 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 105.2 96.5 95 + Optimum to + 5% 108.1 99.1 105.2 96.5 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc. DATE: 9 September 1998 PROJECT: Denton Tap Road, C0ppe[I, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Borrow Fill - Brown & Tan Silty Clay 2) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 11 109.0 pcf @ 13.0% Moisture 2) 110,0 pcf @ 17,0% Moisture LOCATION PROCTOR 6ackfill Over 60" Storm Drain Main B 138) approx. Station 0+40 1 139) approx. Station 0+80 1 8'-9' 13.6 Backfill Over Storm Sewer Lateral B-6 140) approx. Station 0+35 2 Fin. Sub. 17.4 MOISTURE LIFT CONTENT % BELOW EXIST, GRADE 6'-7' 14.2 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 109.9 100.8 95+ Optimum to + 5% 108.2 99.3 105.3 95.7 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebc0n, Inc. PROJECT: Denton Tap Road, Coppell, TX MATERIAL DESCRIPTION: 1 ) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf @ 17.0% Moisture LOCATION PROCTOR LIFT DATE: 4 September 1998 JOB NO.: 98.1064 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Backfill Over Storm Sewer Lateral B-5 135) approx. Station 0+40 1 Fin. Sub. 19.5 136) approx. Station 0+60 1 Fin. Sub. 17.4 Backfill Over Storm Sewer Lateral B-2 137) approx. Station 0+60 1 Fin. Sub. 17,1 105.5 95.5 95+ Optimum to + 5% 105.4 95.4 116.0 105.5 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 3 September 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1 ) Borrow Fill - Brown & Tan Silty Clay ASTM D 698 STANDARD PROCTOR: 1) 109.0 pcf ~b 13.0% Moisture 133) 134) LOCATION PROCTOR LIFT Backfill Over Stgrm Sewer Lateral B-5 approx. Station 0 + 30 (27") Backfill Over St(~rm Sewer Lateral B-2 approx. Station 0+ 10 (33") MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 Fin. Sub. 15.3 1 Fin, Sub. 13.8 110.2 101.1 95+ Optimum to +5% 114.7 105.2 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc, DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Three columns on line C, southbound bridge LOCATION OF POUR SET 2: 98.1064 2 September 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 458 Cement Ticket No. 1131777 Flyash Time Batched 9:25am Sand Time Sampled 10:30am in. Concrete Temp. (ASTM C1064) 92°F 1.0 in. Air Content (ASTM C231) Wa[er Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 8273 COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren~]th 28-Day (ASTM Cl 43) ps1 Strength 77 4.50 7' 09/09/98 78 4.50 7 09/09/98 79 4.50 28 09/30/98 80 4.50 28 09/30/98 105,600 373O 103,800 3670 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (9:45am-11:lSam) {1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Rebcon, Inc. DATE: PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Three columns on line C, southbound bridge LOCATION OF POUR SET 2: 98.1064 2 September 1998 TXI SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 458 Cement Ticket No. 1131777 Flyash Time Batched 9:25am Sand Time Sampled 10:30am in. Concrete Temp. (ASTM C1064J 92°F 1.0 in. Air Content {ASTM C231) Water Unit Weight {ASTM C138) Admix #1 Admix #2 AEA 8273 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1431 psi Strength 77 4.50 7 09/09/98 78 4.50 7 09/09/98 79 4.50 28 09/30/98 80 4.50 28 09/30/98 105,600 373O 103,800 3670 137,400 4860 138,400 4900 28-Day Average 4880 30O0 TECHNICIAN: DISTRIBUTION: MFM (9:45am-11:15am) (1) Rebcon, Inc. (.1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 2 September 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay ASTM D698 STANDARD PROCTOR: 1) 102.0pcf @ 18.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % BELOW Backfill Over 60" Storm Drain Main "B" SUBGRADE 127) approx. Station 4+50 RETAKE 1 3'-4' 18.9 102.1 100.1 128) approx. Station 4+25 RETAKE 1 2'-3' 19.9 100.2 98.2 129) approx. Station 3+50 1 2'-3' 19.7 98.0 96.1 130) approx. Station 3+00 1 3'-4' 20.2 99,3 97.4 131) approx. Station 2+50 1 2'-3' 18.6 97.9 95.9 132) approx. Station 2+00 1 1'-2' 18.3 100,0 98.0 95+ Optimum to +5% TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5;148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 1 September 1998 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Brown Silty Clay ASTM D698 STANDARD PROCTOR: 1) 102.0 pcf ~ 18.0% Moisture LOCATION PROCTOR Backfill Over 60" Storm Drain Main "B" 124) approx. Station 2+50 1 125) approx. Station 3+00 1 126) approx. Station 3 + 50 1 LIFT BELOW SUBGRADE 6' 5' MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 21.0 20.3 18.1 100.1 98.1 95+ Optimum to +5% 99.3 97,3 100.9 98.9 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148