Loading...
ST9401-LR 990126Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 26 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Sidewalk, southbound Denton Tap Rd., from south side of bridge to 100' south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 470 Cement Ticket No. 1225280 Flyash Time Batched 10:34am Sand Time Sampled 11:10am in. Concrete Temp. {ASTM C10641 67°F 1.0 in. Air Content IASTM C231} 5.0% Water Unit Weight (ASTM C13Si Admix //1 Admix #2 AEA 8272 COMPRESSIVE STRENGTH TESTS {ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 237 4.00 7 02/02/99 238 4.00 7 02/02/99 239 4.00 28 02/23/99 240 4.00 28 02/23/99 75,7O0 2680 76,500 2700 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MS (10:30am-12:00 Noon) {1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-6148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 26 January 1999 Coppell, TX SUPPLIER: TXI Sidewalk, southbound Denton Tap Rd., from south side of bridge to 100' south SAMPLE DATA: SET 1 · SET 2 Truck No. 470 Ticket No. 1225280 Time Botched 10: 34am Time Sampled 11:10am Concrete Temp. {ASTM C10§4) 67"F Air Content (ASTM C231) 5.0% Unit Weight IASTM c13el MIX NO. Cement FIyash Sand in. 1,0 in. Water Admix //1 Admix //2 AEA 8272 COMPRESSIVE STRENGTH TESTS |ASTM C391 Cylinder Slump Age Test Number Inches Days Date (ASTM C143~ (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounda Strength 2S-Day psi Strength 237 238 239 240 4.00 7 02/02/99 4.00 7 02/02/99 4.00" 28 02/23199 4.00 28 02/23/99 75,700 2680 76,500 2700 '94,800 3350 92,800 3280 28-Day Average 3320 TECHNICIAN: DISTRIBUTION: MS (10:30am-12:00 Noon) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 25 Janua~ 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown Silty Clay ASTM D 898 STANDARD PROCTOR: 1) 102.0 pcf @ 18.0% Moisture MOISTURE LOCATION PROCTOR LIFT CONTENT % Sidewalk Suborade. West Side of Denton TaD Rd. 203) Station 214+00 1 Fin. Sub. 23.0 204) Station 213+00 1 Fin. Sub. 21.6 205) Station 212+00 1 Fin. Sub. 22.6 206) Station 211 +00 1 Fin. Sub. 22.1 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 100.0 98.0 95 + 101.3 99.3 Optimumto +5% 97.3 95.4 99.1 97.2 TECHNICIAN: DISTRIBUTION: CDJ (1) Rebcon, Inc. {1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 21 January 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) On-Site Fill - Brown & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 110.0 pcf ~ 17.0% Moisture MOISTURE DRY PERCENT REQUIRED LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Sidewalk ~uborade, West Side of Denton TaD Road 200) Station 205 + 75 1 Final 17.7 110.5 100.5 201) Station 205+00 1 Final 17.4 110.7 100.7 202) Station 203 +50 1 Final 19.6 108.9 99.0 95+ Optimum to +5% TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 14 January 1999 Coppell, TX SUPPLIER: TXI Paving, 48' east of west curbline of southbound side of Denton Tap Rd., 10' south of south edge of street leading to park SAMPLE DATA: SET 1 SET 2 MIX NO. 8274 Truck No. 716 Cement Ticket No. 1214913 Flyash Time Batched 10:14am Sand Time Sampled 10:40am in. Concrete Temp. (ASTM C10e41 60°F 1.0 in. Air Content (ASTM C2311 6.8 % Water Unit Weight IASTM C138) Admix # 1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39r (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM Cl 43) psi Strength 233 3.75 7 01/21/99 234 3.75 7 01/21/99 235 3.75 28 02/11/99 236 3.75 28 02/11/99 110,700 3920 109,100 386O 138,700 4910 142,800 5050 28-Day Average 4980 3750 TECHNICIAN: DISTRIBUTION: JWJ (10:00am-11:45am) {1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 14 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, 48' east of west curbline of southbound side of Denton Tap Rd., 10' south of south edge of street leading to park LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 716 Cement Ticket No. 1214913 Flyash Time Batched 10:14arn Sand Time Sampled 10:40am in. Concrete Temp. IASTM C~0641 60°F 1.0 in. Air Content (ASTM C231) 6.8% Water Unit Weight IASTM C1381 Admix 81 Admix 82 AEA 8274 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 233 3.75 7 01/21/99 234 3.75 7 01/21/99 235 3.75 28 02/11/99 236 3.75 28 02/11/99 110,700 392O 109,100 3860 28-Day Average 3750 TECHNICIAN: DISTRIBUTION: JWJ (10:00am-11:45am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 12 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Bridge railing, west side, from 66' south of north side running 105' to the south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 836 Cement Ticket No. 1213083 Flyash Time Batched 2:1 Opm Sand Time Sampled 2:50pm in. Concrete Temp. IASTM C1064) 61 °F 1.0 in. Air Content {ASTM C231) ~-.7% Water Unit Weight IASTM C1381 Admix #1 Admix #2 AEA 8294 COMPRESSIVE STRENGTH TESTS IASTM C39l (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Requi~ed Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 229 4.50 7 01/I 9/99 230 4.50 7 01/19/99 231 4.50 28 02/09/99 232 4.50 28 02/09/99 118,000 4170 120,600 4270 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (2:00pm-3:30pmi (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 197) 1981 199) Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Rebcon, Inc. DATE: 12 January 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Light Brown Sandy Clay with Lime ASTM D 698 STANDARD PROCTOR: 1) 97.0 pcf @ 23,0% Moisture LOCATION PROCTOR LIFT Denton Tao Road. West Side approx. Station 202 + 52 at park entrance approx. Station 202 + 52 centedine approx. Station 202 + 52 east side MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 Fin. Sub. 25.6 98.0 101.0 1 Fin. Sub. 25.4 98.2 101.2 1 Fin. Sub. 24.1 98.8 101.9 95+ Optimum to + 5% TECHNICIAN: : :CDJ DISTRIBUTION: (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1084 CLIENT: Rebcon, Inc. DATE: 12 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl LOCATION OF POUR SET 1: Bridge railing, west side, from 66' south of north side running 105' to the south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No, 836 Cement Ticket No. 1213083 Flyash Time Batched 2:10pm Sand Time Sampled 2:50pm in. Concrete Temp. (ASTM C10641 61 °F 1.0 in. Air Content {ASTM C231) 4.7% Water Unit Weight (ASTM C1381 Admix ;/1 Admix #2 AEA 8294 COMPRESSIVE STRENGTH TESTS {ASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 229 4.50 7 01/19/99 230 4.50 7 01/19/99 231 4.50 28 02/09/99 232 4.50 28 02/09/99 118,000 4170 120,600 4270 152,700 5400 ' 156,700 5540 28-Day Average 5470 3000 TECHNICIAN: DISTRIBUTION: JWD (2:00pm-3:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 7 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, sidewalk ramp to park northwest corner of entrance to park LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 837 Cement Ticket No. 1209697 Flyash Time Batched 2:06pm Sand Time Sampled 3:00pm in. Concrete Temp. (ASTM c1084) 70°F 1.0 in. Air Content (ASTM C231l 4.6% Water Unit Weight (ASTM C138l Admix #1 Admix #2 AEA 8294 COMPRESSIVE STRENGTH TESTS I^STM c3el Cylinder Slump Age Test Number Inches Days Date {ASTM C143i (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 225 5.50 7 01/14/99 226 5.50 7 01/14/99 227 5.50 28 02/04/99 228 5.50 28 02/04/99 125,200 4430 127,300 45O0 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EDB (2:30pm-4:00pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 7 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, sidewalk ramp to park northwest corner of entrance to park LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 837 Cement Ticket No. 1209697 Flyash Time Batched 2:06pm Sand Time Sampled 3:00pm in. Concrete Temp. {ASTM C1064i 70°F 1.0 in. Air Content {ASTM C231! 4.6% Water Unit Weight {ASTM C138) Admix //1 Admix #2 AEA 8294 COMPRESSIVE STRENGTH TESTS IASTM C3m Cylinder Slump Age Test Number Inches Days Date (ASTM C143i (Standard 6 inch x 12 inch cylinderl Total Load Compressive Required Pounds Strength 28-Day psi Strength 225 5.50 7 01/14/99 226 5.50 7 01/14/99 227 5.50 28 02/04199 228 5.50 28 02/04/99 125,200 4430 127,300 450O [55,600 5500 154,500 5460 28-Day Average 5480 3000 TECHNICIAN: DISTRIBUTION: EDB (2:30pm-4:00pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 5 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, Station 20 + 80, 10' east from west curbline on southbound side of Denton Tap LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 8274 Truck No. 807 Cement Ticket No. 1206672 Flyash Time Batched lO:03am Sand Time Sampled 10:27am in. Concrete Temp. {ASTM C1064) 54°F 1.0 in. Air Content (ASTM C2311 2~6% Water Unit Weight (ASTM C138! Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 221 4.00 7 01/12/99 222 4.00 7 01/12/99 223 4,00 28 02/02/99 224 4.00 28 02/02/99 145,600 5150 148,1000 5240 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (9:30am-11:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 5 January 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, Station 20 + 80, 10' east from west curbline on southbound side of Denton Tap LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 807 Cement Ticket No. 1206672 Flyash Time Batched 10:03am Sand Time Sampled 10:27am in. Concrete Temp. IASTM C1064) 54°F 1.0 Air Content {ASTM C231) 2.6% Water Unit Weight {ASTM C138) Admix //1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM C39~ Cylinder Slump Age Test Number Inches Days Date IASTM C1431 (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 221 4.00 7 01/12/99 222 4.00 7 01/12/99 223 4.00 28 02/02/99 224 4.00 28 02/02/99 145,600 5150 148,1000 5240 [94,300 6870 187,900 6650 28-Day Average 6760 30OO TECHNICIAN: DISTRIBUTION: JWD (9:30am-11:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214),351-6419 Fax (214) 351-5148