ST9401-LR 990430Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tal~ Road,
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 30 April 1999
Coppell, TX SUPPLIER: TXI
Paving, Station 218 + 00, 10' west of east curbline on
northbound side of Denton Tap Road
Paving, Station 210+00, 10' west of east curbline on
northbound side of Denton Tap Road
SAMPLE DATA: SET 1 SET 2
Truck No. 462 712
Ticket No. 1302933 1303206
Time Batched 7:53am 9:45am
Time Sampled 8:13am 10:12am
Concrete Temp. IASTM ClOe4l 82°F 83°F
Air Content IASTM C231) 4.3% 4.0%
Unit Weight {ASTM C138)
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix//1
Admix #2
AEA
8272
COMPRESSIVE STRENGTH TESTS IASTM C3g~
Cylinder Slump Age Teat
Number Inchea Days Date
IAaTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compreaaive Required
Pounda Strength 28-Day
psi Strength
301 3.75 7 05/07~99
302 3.75 7 05/07/99
303 3.75 28 05/28/99
304 3.75 28 05/28199
100,600 3560
102,200 3610
28-Day Average 3000
305 2.75 7 05~7/99
306 2.75 7 05~7/99
307 2.75 28 05~8/99
308 2.75 28 05/28/99
108,100 3820
106,800 3780
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-9:00am, 9:30am-11:00am)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
287OWalnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
~;TRAIGHT SHAFT PIER
IN~;TALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 30 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 10:30am-12:30pm
2.0 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR iN HOLE
D/6
36" -2.6' 62.6' 62.6'
NOTES:
1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Concrete placed in piers within 8 hours of drilling completion, unless noted otherwise.
3} Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
4) Top of concrete elevation is relative to grade at time pier was drilled.
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc,
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
ConstructiOn Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 30 April 1999
SUPPLIER: TXI
Paving, Station 218+00, 10' west of east curbline on
northbound side of Denton Tap Road
Paving, Station 210+00, 10' west of east curblina on
northbound side of Denton Tap Road
SAMPLE DATA: SET 1 SET 2
Truck No. 462 712
Ticket No. 1302933 1303206
Time Batched 7:53am 9:45am
Time Sampled 8:13am 10:12am
Concrete Temp. iASTM ClOe4i 82°F 83°F
Air Content (ASTM C231) 4.3% 4.0%
Unit Weight (ASTM C138l
MIX NO.
Cement
Fiyash
Sand
1.0 in.
Water
Admix //1
Admix //2
AEA
8272
COMPRESSIVE STRENGTH TESTS IASTM C39)
Cylinder Slump Age Test
Number Inches Daya Data
IASTNI C 143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
301 3.75
302 3.75
303 3.75
304 3.75
305 2.75
306 2.75
307 2.75
308 2.75
7 05/07/99 100,600 3560
7 05/07/99 102,200 3610
28 05/28/99 [29,200 4570
28 05/28/99 [27,000 4490
28-Day Average 4530
7 05/07/99 108,100 3820
7 05/07/99 106,800 3780
28 05/28199 [38,800 4910
28 05/28/99 137,200 4850
28-Day Average 4880
3OO0
30OO
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-9:00am, 9:30am-11:00am)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas. Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier D/6
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 464
Ticket No. 1303299
Time Batched 10:22am
Time Sampled 11:15am
Concrete Temp. {~STM C1064} 82°F
Air Content IASTM C231)
Unit Weight {A~TM C13el
SET 2
COMPRESSIVE STRENGTH TESTS (ASTM C3S)
JOB NO.: 98.1064
DATE: 30 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix//1
Admix //2
AEA
{Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(~STM c~ ~) psi Strength
309 5.00 7 05/07/99
310 5.00 7 05/07/99
311 5.00 28 05/28/99
312 5.00 28 05/28/99
127,000 4490
126,000 4460
151,500 5360
154,500 5460
28-Day Average 5410
3OO0
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppetl, TX
LOCATION OF POUR SET 1: Pier D/5, bottom half
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
98.1064
29 April 1999
TXI
SAMPLE DATA: SET 1
Truck No. 835
Tick~ No. 1301765
Time Batched 11:14am
Time Sampled 11:30am
Concrete Temp. {ASTM C1064! 85°F
Air Content iA~FM C231)
Unit Weight IASTM C138)
SET 2
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
0784
6 sks.
COMPRESSIVE STRENGTH TESTS IASTM C39~
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143i
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
285 5.50 7 05/06/99
286 5.50 7 05/06/99
287 5.50 28 05/27199
288 5.50 28 05/27/99
131,800 4660
125,300 4430
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road,
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 29 April 1999
Col~pell, TX SUPPLIER: TXI
Paving, Station 222 + 20, 10' west of east curbline on
northbound side of Denton Tap Road
Paving, Station 221 +00, 10' west of east curbline on
northbound side of Denton Tap Road
SAMPLE DATA: SET 1 SET 2
Truck No. 837 837
Ticket No. 1301303 1301568
Time Batched 7:47am 9:52am
Time Sampled 8:13am 10:10am
Concrete Temp. (ASTM CI064) 85°F 83°F
Air Content {ASTM C231i 3.3% 3.6%
Unit Weight {ASTM C138l
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
8272
COMPRESSIVE STRENGTH TESTS (AS~M c3el
Cylinder Slump Age Teat
Number inches Days Date
IASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
289 2.00 7 05/06/99
290 2.00 7 05~06/99
291 2.00 28 05/27/99
292 2.00 28 05/27/99
293 2.00 7 05/06/99
294 2.00 7 05/06/99
295 2.00 28 05/27/99
296 2.00 28 05/27/99
134,900 4770
134,600 4760
28-Day Average
109,300 3870
109,300 3870
3OOO
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-12:00 Noon)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JO8 NO.: 98.1064
CLIENT: Rebcon, Inc. DATE: 29 April 1999
PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl
LOCATION OF POUR SET 1: Paving, Station 220 + 00, 10' west of east curbline on
northbound side of Denton Tap Road
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. 835 Cement
Ticket No. 1301689 Flyash
Time Belched 10:36am Sand
Time Sampled 11:00am in.
Concrete Temp. IASTM ClO64! 83°F 1.0 in.
Air Content {ASTM C231! 3.9% Water
Unit Weight (ASTIvl C138} Admix //1
Admix //2
AEA
8272
COMPRESSIVE STRENGTH TESTS ~AS~M C39)
Cylinder Sluml~ Age Test
Number Inches Days Date
{ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
297 3.50 7 05106/99
298 3.50 7 05/06/99
299 3.50 28 05/27199
300 3.50 28 05/27/99
100,100 3540
100,600 3560
[Z2,300 4330
125,600 4440
28-Day Average 4390
30O0
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-12:00 Noon)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road,
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 29 April 1999
Coppell, TX SUPPLIER: TXI
Paving, Station 220+00, 10' west of east curbline on
northbound side of Denton Tap Road
SAMPLE DATA: SET 1 SET 2 MIX NO. 8272
Truck No. 835 Cement
Ticket No. 1301689 Flyash
Time Batched 10:36am Sand
Time Sampled 11:00am in.
Concrete Temp. IAST~ Cl0e41 83°F 1.0 in.
Air Content iASTM C231) 3.9% Water
Unit Weight {ASTM C138) Admix 81
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS IAS~M C39l
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143)
{Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
297 3.50 7 05/06/99
298 3.50 7 05/06/99
299 3.50 28 05/27199
300 3.50 28 05/27/99
100,100 3540
100,600 3560
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-12:00 Noon)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road,
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 29 April 1999
Coppell, TX SUPPLIER: TXI
Paving, Station 222 + 20, 10' west of east curbline on
northbound side of Denton Tap Road
Paving, Station 221 +00, 10' west of east curbline on
northbound side of Denton Tap Road
SAMPLE DATA: SET 1 SET 2
Truck No. 837 837
Ticket No. 1301303 1301568
Time Batched 7:47am 9:52am
Time Sampled 8:13am lO:lOam
Concrete Teml~. IASTM C10e4! 85°F 83°F
Air Content (ASTM C231} 3.3% 3.6%
Unit Weight IASTM c13et
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
8272
CGI',f~ESSIVE STRENGTH TESTS IASTM c3a!
Cylinder Slump Age Test
Number Inches Daya Date
(ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
289 2.00
290 2.00
291 2.0O
292 2.00
293 2.00
294 2.OO
295 2.00
296 2.00
7 05/06/99 134,900 4770
7 05/06/99 134,600 4760
28 05/27/99 [53,500 5430
28 05/27/99 156,300 5530
28-Day Average 5480
7 05/06/99 109,300 3870
7 05/06/99 109,300 3870
28 05/27/99 [33,900 4740
28 05/27/99 137,900 4880
28-Day Average 48[0
3OOO
3OOO
TECHNICIAN:
DISTRIBUTION:
JWJ (7:30am-12:00 Noon)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
STRAIGHT SHAFT PIER
INSTALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 29 Al)HI 1999
PROJECT: Denton Tal) Road, Copl)ell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 10:30am-12:301)m
2.0 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
D/5 30" 61.5' 61.6'
NOTES:
1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Total Del)th was measured from current grade at time piers were drilled. Contr.actor must furnish
actual elevation, if required.
3) Required depth furnished by Rebcon.
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rabcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier D/5, bottom half
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 29 April 1999
SUPPLIER: TXI
SAMPLE DATA: SET 1
Truck No. 835
Ticket No. 1301765
Time Batched 11:14am
Time Sampled 11:30am
Concrete Temp. IASTM cl0e4l 85°F
Air Content (ASTM C231)
Unit Weight (ASTM CI 3al
SET 2
MIX NO.
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
0784
6 sks.
COMPRESSIVE STRENGTH TESTS i~ST~ c3el
Cylinder Slump Age Test
Number Inches Days Date
{ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
285 5.50 7 05/06/99
286 5.50 7 05~06~99
287 5.50 28 05~27~99
288 5.50 28 05/27199
131,800 4660
125,300 4430
158,000 5590
[58,200 5590
28-Day Average 5590
3OO0
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.: 98.1064
CLIENT: Rebcon, Inc. DATE: 28 April 1999
PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI
LOCATION OF POUR SET 1: Paving, southbound turn lane @ Station 27 + 00
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. 838 Cement
Ticket No. 1293828 Flyash
Time Batched 8:03am Sand
Time Sampled 8:50am in.
Concrete Temp. IASTM C1064) 78°F 1.0 in.
Air Content IASTM C231) 4.7% Water
Unit Weight (ASTM C138) Admix #1
Admix #2
AEA
8274
COMPRESSIVE STRENGTH TESTS IASTM C391
Cylinder Slump Age Test
Number Inches Days Date
{ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
281 4.50 7 05/05/99
282 4.50 7 05/05/99
283 4.50 28 05/26/99
284 4.50 28 05/26/99
74,500 2640
75,500 2670
28-Day Average 4000
TECHNICIAN:
DISTRIBUTION:
EDB (8:00am-9:30am)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill lane Dallas, Texas 78229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO,: 98.1064
CLIENT: Rebcon, Inc. DATE: 28 April 1999
PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl
LOCATION OF POUR SET 1: Paving, southbound turn lane @ Station 27 +00
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. 835 Cement
Ticket No. 1293828 Flyash
Time Batched 8:03am Sand
Time Sampled 8:50am in.
Concrete Temp. IASTM C10641 78°F 1.0 in.
Air Content IASTM C231) 4.7% Water
Unit Weight {ASTM C1381 Admix //1
Admix //2
AEA
8274
CG~'.fr'~,,,,ESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inchee Days Date Pounds Strength 28-Day
IASTM Cl 4~t psi Strength
281 4.50 7 05/05~99 74,500 2640
282 4.50 7 05/05199 75,500 2670
283 4.50 28 05/26/99 101,500 3590
284 4.50 28 05/26/99 99,300 3510
28-Day Average 3550
3OOO
TECHNICIAN:
DISTRIBUTION:
EDB (8:00am-9:30am)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas ?5229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier D/4 at abutment 'B'
LOCATION OF POUR SET 2:
J08 NO.: 98.1064
DATE: 27 April 1999
SUPPLIER: TXI
SAMPLE DATA: SET 1
Truck No. 467
Ticket No. 1299338
Time Batched 2:50pm
Time Sampled 3:25pm
Concrete Temp. (ASTM C1064l 87°F
Air Content {ASTM C231)
Unit Weight (ASTM C138)
SET 2
MIX NO.
Cement
FIyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
795
CO;.fr'~.ESSIVE STRENGTH TESTS IASTM C391
Cylinder Slump Age Test
Number inches Days Date
)ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
277 7.00 7 05/04/99
278 7.00 7 05/04/99
279 7.00 28 05/25/99
280 7.00 28 05~25/99
115,900 4100
106,900 3780
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
GKO
{1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) .351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier D/4 at abutment
LOCATION OF POUR SET 2:
JOB NO.: 98.1064
DATE: 27 April 1999
SUPPLIER: TXI
SAMPLE DATA: SET 1
Truck No. 467
Ticket No. 1299338
Time Batched 2:50pm
Time Saml~led 3:25pm
Concrete Temp. {ASTM C1064! 87°F
Air Content (ASTM C231)
Unit Weight (ASTM C138!
SET 2
MIX NO.
Came ,[
FIyash
Sand
in.
1.0 in.
Water
Admix #1
Admix //2
AEA
795
COMPRESSIVE STRENGTH TESTS i~STM C3S!
Cylinder Slump Age Teat
Number Inches Days Date
{ASTM C143)
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Stren.gth 28-Day
pal Strength
277 7.00 7 05/04/99
278 7.00 7 05/04/99
279 7.00 28 05/25/99
280 7.00 28 05125/99
115,900 4100
106,900 3780
141,200 4990
140,600 4970
28-Day Average 4980
3OOO
TECHNICIAN:
DISTRIBUTION:
GKO
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
DATE: 27 ApHI1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Tan Sandy Clay with Lime
ASTM D 698 STANDARD PROCTOR: 1) 106.0 pcf @ 16.0% Moisture
MOISTURE
LOCATION PROCTOR LIFT CONTENT
%
[}enton Tan Road-Northbound
318) Station 214+00, centerline 1 Fin. Sub. 18.3
319) Station 213+00, east side 1 Fin. Sub. 18.0
320) Station 212 + 00, west side I Fin. Sub. 20.7
321) Station 211+00, centarline 1 Fin. Sub. 19.7
322) Station 210+00, east side 1 Fin. Sub. 19.4
~.Qft Turn Lane to Natchez Trace
323) approx. 40' north of south end 1
324) approx. 100' north of south end 1
325) approx. 20' south of north end I
DRY PERCENT REQUIRED
DENSITY COMPACTION COMPACTION
PCF %
101.8 96.0 95 +
103.0 97.2 Optimumto +5%
102.8 97.0
104.3 98.4
101.3 95.5
Rn. Sub. 18.7 103.0 97.2
Fin. Sub. 17.9 100.9 95.2
Fin. Sub. 20.7 101.9 96.1
TECHNICIAN:
DISTRIBUTION:
CDJ (2 trips)
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5145
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
STRAIGHT SHAFT PIER
INSTALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 27 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 2:00pm-4:3Opm
2.5 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
D/4 30" 62.3' 62.3'
NOTES:
1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Concrete placed in piers within 8 hours of drilling coml~letion, unless noted otherwise.
3) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
4) Top of concrete elevation is relative to grade at time piers were drilled.
5) Required penetration furnished by Rebcon.
TECHNICIAN:
DISTRiBUTiON:
GKO
(1) Rebcon, Inc,
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/7, top half
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 467
Ticket No. 1297763
Time Batched 10:52am
Time Sampled 11:45am
Concrete Temp. (ASTM C1064) 86°F
Air Content (ASTM C231)
Unit Weight (ASTM C138!
SET 2
COMPRESSIVE STRENGTH TESTS ;ASTM c3e!
Cylinder Slump Age Test
Number Inches Days Date
IASTM C1
JOB NO.: 98.1064
DATE: 23 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement
FIyash
Sand
in.
1.0 in,
Water
Admix //1
Admix //2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Stren.gth 28-Day
psi Strength
273 5.50 7 04~30~99
274 5.50 7 04/30/99
275 5.50 28 05/21/99
276 5.50 28 05/21/99
100,100 3540
100,300 3550
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
RI~PORT OF SOIL GRADATIONS
CLIENT: Rebcon, Inc.
DATE: 23 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc.
on 4/23/99.
LOCATION
PERCENT PASSING
NO. 4 SIEVE
%
NQrthbound Denton TaD Road Alone Centerline
25) Station 210+00 65.8
26) Station 211 + 50 61.8
27) Station 213 + O0 68.0
28) Station 214 + 50 60.8
SPECIFICATION
REQUIREMENTS
%
60 +
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-=;148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
5TRAIGHT SHAFT PIER
INSTALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 23 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 10:30am-12:30pm
2.0 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
C/7
36"
65.0' 65.0'
NOTES:
1 ) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
3) Required depth furnished by Rebcon.
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, lnc,
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/7, top half
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 467
Ticket No. 1297763
Time Batched 10:52am
Time Sampled 11:45am
Concrete Tem;). (ASTM C1064t 86°F
Air Content (ASTM C231)
Unit Weight (ASTM C138)
SET 2
COMPRESSIVE STRENGTH TESTS IASTM C39)
Cylinder Slump Age Teat
Number Inches Daya Date
(ASTM C143)
JOB NO.: 98.1064
DATE: 23 April 1999
SUPPLIER: TXl
MIX NO. 784
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix //2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
273 5.50 7 04130/99
274 5.50 7 04/30/99
275 5.50 28 05/21/99
276 5.50 28 05/21/99
100,100 3540
100,300 3550
134,100 4740
135,900 4810
28-Day Average 4780
3OOO
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, (~arreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
DATE: 22 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Tan Sandy Clay with Lime
ASTM D 698 STANDARD PROCTOR: 1) 106.0 pcf @ 16.0% Moisture
LOCATION PROCTOR LIFT
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF %
Denton Tao Road-Northbound
310) Station 215+50, east side 1 Fin. Sub. 17.7 100.9 95.2
311) Station 216+50, centedine I Fin. Sub. 19.2 101.5 95.7
312! Station 217+50, west side 1 Fin. Sub. 17.2 105.2 99.3
313) Station 218+50, east side 1 Fin. Sub. 19.0 101.6 95.8
314) Station 219 + 50, centerline 1 Fin. Sub. 16.2 103.9 98.0
315) Station 220+50, west side 1 Fin. Sub. 18.3 106.1 100.1
316) Station 221 + 50, east side 1 Fin. Sub. 18.5 102.6 96.8
317) Station 222+50, centerline 1 Fin. Sub. 20.5 101.0 95.3
95+
Optimum to + 5 %
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc,
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
STRAIGHT SHAFT PIER
IN~;TALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 22 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 10:30am-12:30pm
· 2.0 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
C/6 36" 65.0' 65.0'
NOTES:
1 ) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Concrete placed in pier within 8 hours of drilling completion.
3) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
4) Required depth furnished by Rebcon.
TECHNICIAN:
DISTRIBUTION:
CDJ
{1) Rebcon, Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/6
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 474
Ticket No. 1296342
Time Batched 10:40am
Time Sampled 11:15am
Concrete Temp. (ASTM ClOe4) 83°F
Air Content (ASTM C231)
Unit Weight (ASTM C138}
SET 2
COMPRESSIVE STRENGTH TESTS (ASTM c3e)
Cylinder Slump Age Test
Number Inches Days Data
(ASTM C143)
JOB NO.: 98.1064
DATE: 22 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix //2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
269 4.00 7 04/29/99
270 4.00 7 04129/99
271 4.00 28 05/20~99
272 4.00 28 05/20/99
137,900 488O
138,800 4910
157,900 5580
162,300 5740
28-Day Average 5660
3O00
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc,
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tal~ Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/6
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 474
Ticket No. 1296342
Time Batched 10:40am
Time Sampled 11:15am
Concrete Teml~. (ASTM C1064) 83°F
Air Content (ASTM C231)
Unit Weight (ASTM C138)
SET 2
COMPRESSIVE STRENGTH TESTS (ASTM C39)
Cylinder Slump Age Test
Number Inches Days Date
{ASTM C143)
JOB NO.: 98.1064
DATE: 22 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
269 4.00 7 04/29/99
270 4.00 7 04/29/99
271 4.00 28 05/20~99
272 4.00 28 05/20/99
137,900 4880
138,800 4910
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc,
{1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/5
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 639
Ticket No. 1294821
Time Batched 10:46am
Time Saml)led 11:30am
Concrete Teml~. (ASTM ClOe4i 80°F
Air Content {ASTM C231}
Unit Weight {ASH C138l
SET 2
COMPRESSIVE STRENGTH TESTS (ASTM C3ei
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143)
JOB NO.: 98.1064
DATE: 21 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement 6 sks.
Flyash
Sand
in.
1.0 in.
Water
Admix #1
Admix #2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
265 5.50 7 04~28~99
266 5.50 7 04/28/99
267 5.50 28 05/19~99
268 5.50 28 05/19/99
121,200 4290
127,900 4520
167,100 5910
157,900 5580
28-Day Average 5750
300O
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
~;TRAIGHT SHAFT PIER
INSTALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 21 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 10:30am-12:30pm
2.0 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
C/5
36" 65.0' 65.0' 12:00 2"-3'
NOTES:
1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Concrete placed in pier within 8 hours of drilling completion.
3) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
4) Required depth furnished by Rebcon.
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
{1) CiW of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/5
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 639
Ticket No. 1294821
Time Batched 10:46am
Time Sampled 11:30am
Concrete Temp. IASTM c10e4) 80°F
Air Content (ASTM C231}
Unit Weight (ASTM C138}
SET 2
COMPRESSIVE STRENGTH TESTS IASTM C39)
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143)
JOB NO.: 98.1064
DATE: 21 April 1999
SUPPLIER: TXI
MIX NO. 784
Cement 6 sks.
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix #2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Strength 28-Day
psi Strength
265 5.50 7 04/28/99
266 5.50 7 04~28/99
267 5.50 28 05/19/99
268 5.50 28 05/19~99
121,200 4290
127,900 4520
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas '75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
2070 W. lflut Hill Lane D"II"I . Texm. 75229 (214) 351.5419
Client: Rebcon, Inc.
Project: Denton Tap Road, Coppell, TX
Date: 20 April 1999
Job No: 98.1064
8oil Deacription:
Meximum Deneity :
Optimum Moieture :
Lime Stabilized Subgrade
Tan Sandy Clay with Lime
106.0 pcf
16.0%
Liquid Limit : 29.6
Plaeticity Index : 4.0
Dietribution: (1) Rebc0n, Inc.
(1) City of Coppell
120
110
90
MOISTURE- DENSITY
80
lO
Moisture
RELATIONSHIP ASTM D698
20 30
Content - percent
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF SOIL GRADATIONS
CLIENT: Rebcon, Inc.
DATE: 20 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc.
on 4/20/99.
LOCATION
PERCENT PASSING
NO. 4 SIEVE
%
Denton Tao Rd., Northbound
20} Station 215 + 50, centerllne 65.8
21) Station 217+00, east side 64.1
22) Station 218+50, west side 65.0
23) Station 220 + 00, centerline 64.0
24) Station 222 + 00, east side 62.7
SPECIFICATION
REQUIREMENTS
%
60 +
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill L.ane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/4 at east bridge
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 457
Ticket No. 1291941
Time Batched 10:52am
Time Sampled 11:40am
Concrete Temp. (ASTM CI064) 80°F
Air Content IASTM C231)
Unit Weight {ASTM C138!
SET 2
COMPRESSIVE STRENGTH TESTS (ASTM C39t
Cylinder Slump Age Test
Number Inches Days Date
(ASTM C143)
JOB NO.: 98.1064
DATE: 19 April 1999
SUPPLIER: TXl
MIX NO. 0784
Cement 6 sks.
Flyash
Sand
iR.
1.0 in.
Water
Admix #1
Admix #2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounde Strength 28-Day
psi Strength
261 5.75 7 04/26/99
262 5.75 7 04/26/99
263 5.75 28 05/17~99
264 5.75 28 05/17/99
110,500 3910
106,800 3780
28-Day Average 3000
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
~;TRAIGHT SHAFT PIER
INSTALLATION OBSERVATION
CLIENT: Rebcon, Inc. DATE: 19 April 1999
PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064
DRILLER: Texas Shafts TIME: 9:00am-12:30pm
3.5 hours
PIER
MARK
SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER
DIA, CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE
C/4 36"
65.0' 65.0'
NOTES:
1) Pier reinforcing verified to be correct in accordance with project plans and specifications,
unless noted otherwise.
2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish
actual elevation, if required.
3) Required depth furnished by Rebcon.
4) Concrete delayed from lO:OOam to 11 :OOam after inspector arrived at jobsite.
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
LOCATION OF POUR SET 1: Pier C/4 at east bridge
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 457
Ticket No. 1291941
Time Batched 10:52am
Time Sampled 11:40am
Concrete Temp. IASTM C1064) 80°F
Air Content {ASTM C231)
Unit Weight {ASTM C138)
SET 2
COMPRESSIVE STRENGTH TESTS IASTM C39)
Cylinder Slump Age Test
Number Inches Days Date
(ASI~I C143)
JOB NO.: 98.1064
DATE: 19 April 1999
SUPPLIER: TXI
MIX NO. 0784
Cement 6 sks.
FIyash
Sand
in.
1.0 in.
Water
Admix //1
Admix #2
AEA
(Standard 6 inch x 12 inch cylinder)
Total Load Compressive Required
Pounds Stren.gth 28-Day
psi Strength
261 5.75 7 04/26/99
262 5.75 7 04/26/99
263 5.75 28 05/17/99
264 5.75 28 05117/99
110,500 3910
106,800 3780
133,400 4720
141,300 5000
28-Day Avereg8 4860
30OO
TECHNICIAN:
DISTRIBUTION:
MFM
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
DATE: 12 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
MATERIAL DESCRIPTION: 1) On-Site Fill - Tan Silt,/ Clay
ASTM O 698 STANDARD PROCTOR: 1) 111.0 pcf ~ 16.0% Moisture
LOCATION PROCTOR LIFT
M01STURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
BELOW
Denton Tap Road-Northbound SUBGRADE
300) approx. Sta. 208+50, east curbline t .5' 16.7 107.9 97.2
301) approx. Sra. 209+50, east side 1 .5' 18.0 112.1 101.0
302) approx. Sta. 210+50, centerline 1 .5' 16.6 112.3 101.2
303) approx. Sta. 211 +50, east side 1 .5' 17.1 112.3 101.2
304) approx. Sra. 212+50, centedine 1 .5' 16.0 111.5 100.4
305) approx. Sta. 218+50, east side 1 .5' 17.5 110.9 99.9
306) approx. Sra. 219+50, centerline 1 .5' 20.5 108.9 98.1
307) approx. Sra. 220+50, east side 1 .5' 16.0 110.8 99.8
308) approx. Sra. 221 + 50, centerline 1 .5' 16.3 111.3 100.3
309) approx. Sra. 222+50, east side 1 .5' 19.6 108.7 97.9
95+
Optimum to + 5%
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc. DATE: 7 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
MATERIAL DESCRIPTION: 1 ) On-Site Fill - Tan Silty Clay
2) Borrow Fill - Brown & Tan Silty Clay
ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf ~ 16.0% Moisture
2) 109.0 pcf ~ 13.0% Moisture
LOCATION PROCTOR LIFT
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
BELOW
DentQn Tap Road-Northbound SUBGRADE
294) Station 215+33, west side 1 .5' 19.4 109.1 98.3
295) Station 216+50, centerline 1 .5' 16.5 109.9 99.0
296) Station 217+50, east side 1 .5' 18.0 106.6 96.0
297) Station 218+50, centerline 1 .5' 16.7 111.8 100.7
298) Station 208 + 50, east of curbline 2 1' 15.7 111.2 102.0
299) Station 209+60, east of curbline 2 .5' 17.4 108.9 99.9
95+
Optimum to + 5%
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materiels Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
PROJECT: Denton Tap Road, Coppell, TX
DATE: 2 April 1999
JOB NO,: 98.1064
MATERIAL DESCRIPTION: 1) On-Site Fill - Tan Silty Clay
ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf @ 16.0% Moisture
LOCATION
Denl;gn TaD Road-Northbound
291) Station 221 + 00, east side
292) Station 220 + 00, centerline
293) Station 219+00, west side
PROCTOR LIFT
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF %
BELOW
SUBGRADE
1 1' 17.5
1 1' 16.8
1 .5' 16.9
108.5 97.7 95 +
Optimum to +5%
112.7 101.5
111.5 100.5
TECHNICIAN:
DISTRIBUTION:
CDJ
(11 Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Rebcon, Inc.
DATE: 1 April 1999
PROJECT: Denton Tap Road, Coppell, TX
JOB NO.: 98.1064
MATERIAL DESCRIPTION: 1 ) On-Site Fill- Tan Silty Clay
2) Borrow Fill - Brown & Tan Silty Clay
ASTM D 698 STANDARD PROCTOR: 1) 111.0 pcf @ 16.0% Moisture
2) 109.0 pcf ~ 13.0% Moisture
LOCATION PROCTOR LIFT
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
BELOW
Denton TaD Road-Northbound SUBGRADE
285) Station 216+00, west side 1 1' 19.8 109.9 98.9
286) Station 217+00, east side 1 .5' 16.2 113.8 102.5
287) Station 218 + 00, west side 1 .5' 17.5 110.7 99.7
288) Station 219+00, centerline 1 1' 16.1 109.3 98.5
289) Station 214+00, centerline 2 1' 15.2 112.5 103.2
290) Station 213+00, west side 2 .5' 15.1 113.3 104.4
95+
Optimum to + 5%
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Rebcon, Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148