Loading...
ST9401-LR 990528Hooper Engineering Laboratories, Inc. Construction Materials Testing ~;TRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 28 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 10:30am-12:30pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE A/7 3O" NE Wing Wall 18" 61.7' 61.7' 60.8' 60.8' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor muet furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. Concrete scheduled for 11 :OOam. Concrete placement started at 11:40am. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 28 May 1999 Coppell, TX SUPPLIER: TXI 2nd column from east end of column to west on north side of creek SAMPLE DATA: SET 1 SET 2 MIX NO. 8274 Truck No. 458 Cement Ticket No. 1324671 Flyash Time Batched 1:07pm Sand Time Sampled 1:45pm in. Concrete Temp. (AS'IM C1064) 92°F 1.0 in. Air Content (ASTM C231) 3.8% Water Unit Weight (ASTM C138l Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39l Cylinder Slump Age Test Number Inches Days Date IASTM C143! (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 401 4.50 7 06/04~99 402 4.50 7 06104/99 403 4.50 28 06125/99 404 4.50 28 06/25/99 116,400 4120 115,500 4090 136,400 4820 144,800 5120 28-Day Average 4970 4OOO TECHNICIAN: DISTRIBUTION: JWJ {1:15pm-2:45pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, inc. PROJECT: Denton Tap Road, Coppeli, TX LOCATION OF POUR SET 1: East bridge pier #Al7 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 471 Ticket No. 1324391 Time Batched 10:25am Time Sampled 11:45am Concrete Temp. (ASTM C1064) 83°F Air Content (ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IAST~ C3Sl Cylinder Slump Age Test Number Inches Days Date IASTM C143} JOB NO.: 98.1064 DATE: 28 May 1999 SUPPLIER: TXI MIX NO. 0784 Cement Flyash Sand 1.0 in. Water Admix //1 Admix //2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Stren.gth 28-Day psi Strength 397 6.25 7 06/04~99 398 6.25 7 06/04~99 399 6.25 28 06~25/99 400 6.25 28 06/25/99 90,700 3210 93,70O 3310 119,400 4220 115,900 4100 2S-Day Average 4160 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 287OWalnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rabcon, Inc. DATE: 28 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: 2nd column from east and of column to west on north side of creek LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 458 Cement Ticket No. 1324671 Flyash Time Belched 1:07pm Sand Time Sampled 1:45pm in. Concrete Temp. (ASTM C10641 92°F 1.0 in. Air Content IASTM C231) 3.8% Water Unit Weight {AeTM C138! Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM C3el Cylinder Slump Age Test Number Inches Days Date (ASTM C1431 {Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 401 4.50 7 06/04/99 402 4.50 7 06/04~99 403 4.50 28 06/25/99 404 4.50 28 06/25/99 116,400 4120 115,500 4090 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: JWJ (1:15pm-2:45pm) (1) Rebcon, inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: East bridge pier #A/7 LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 28 May 1999 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 471 Ticket No. 1324391 Time Batched 10:25am Time Sampled 11:45am Concrete Temp. (ASTM CLO64) 83°F Air Content IASTM C231) Unit Weight {ASTM C138) SET 2 MIX NO. Cement Flyash Sand irt. 1.0 in. Water Admix //1 Admix //2 AEA 0784 COMPRESSIVE STRENGTH TESTS IASTM caal Cylinder Slump Age Test Number Inches Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 397 6.25 7 06~4/99 398 6.25 7 06~4/99 399 6.25 28 06~25~99 400 6.25 28 06/25/99 90,700 3210 93,700 3310 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: East bridge pier #A/6 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 455 Ticket No. 1323228 Time Batched 10:45am Time Sampled 11:20am Concrete Temp. (ASTM C1064l 83°F Air Content (ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IASTM C3el Cylinder Slump Age Test Number Inches Days Date (ASTM C143} JOB NO.: 98.1064 DATE: 27 May 1999 SUPPLIER: TXI MIX NO. 0784 Cement FIyash Sand in. 1.0 in. Water Admix //1 Admix//2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 393 6.50 7 06~03~99 394 6.50 7 06/03/99 395 6.50 28 06/24/99 396 6.50 28 06124/99 89,000 3150 89,500 3170 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rabcon, Inc. PROJECT: Denton Tap Road, Coppeli, TX LOCATION OF POUR SET 1: East bridge pier #A/6 LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 27 May 1999 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 455 Ticket No. 1323228 Time Batched 10:45am Time Sampled 11:20am Concrete Temp. (ASTM C1064) 83°F Air Content (ASTM C231} Unit Weight (ASTM C13a) SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA 0784 COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Test Number Inches Days Date {ASTM C143l (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 393 6.50 7 06~3/99 394 6.50 7 06~03/99 395 6.50 28 06/24/99 396 6.50 28 06/24/99 89,000 3150 89,500 3170 120,400 4260 120,200 4250 28-Day Average 4260 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Copl3ell, TX LOCATION OF POUR SET 1: Abutment wall, line D, first lift LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 464 Cement Ticket No. 1323183 Flyash Time Batched 10:24am Sand Time Sampled 11:00am in. Concrete Temp. {ASTM C1064) 82°F 1.0 in. Air Content (ASTM C231! 4.3% Water Unit Weight {ASTM c138) Admix #1 Admix #2 AEA JOB NO.: 98.1064 DATE: 27 May 1999 SUPPLIER: TXI 8274 COMPRESSIVE STRENGTH TESTS ;AS~ c3m Cylinder Slump Age Test Number Inches Days Date (A~t'M C 143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28*Day psi Strength 389 6.25* 7 06/03~99 390 6.25 7 06/03/99 391 6.25 28 06~24~99 392 6.25 28 06/24/99 100,200 3540 98,400 3480 132,200 4680 129,100 4570 28-Day Average 4630 4000 *Informed superintendent of excessive slump. TECHNICIAN: DISTRIBUTION: EDB (10:00am-12:00 Noon) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing ~;TRAIGHT SHAFT PIER IN~;TALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 27 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 10:00am-12:00 Noon 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE Al6 30" 61.4' 61.5' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Abutment wall, line D, first lift LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 27 May 1999 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 464 Ticket No. 1323183 Time Batched 10:24am Time Sampled 11:00am Concrete Temp. {ASTM C1064) 82°F Air Content iASTM C231) 4.3% Unit Weight (ASTM C138) SET 2 MIX NO. 8274 Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTM c3s~ Cylinder Slump Age Test Number Inchea Days Date (ASTM C143! (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Stren.gth 28-Day ps~ Strength 389 6.25' 7 06/03~99 390 6.25 7 06/03/99 391 6.25 28 06/24~99 392 6.25 28 06/24/99 100,200 3540 98,400 3480 28-Day Average 3000 *Informed superintendent of excessive slump. TECHNICIAN: DISTRIBUTION: EDB (10:00am-12:00 Noon) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 25 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl LOCATION OF POUR SET 1: North piling cap (east half), east bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 460 Cement Ticket No. 1322378 Flyash Time Batched 9:25am Sand Time Sampled 10:35am in. Concrete Temp. (ASTM C1064l 84°F 1.0 in. Air Content {ASTM C231) 3.z~% Water Unit Weight (ASTM C138i Admix //1 Admix 82 AEA 8272 COMPRESSIVE STRENGTH TESTS IASTM c391 Cylinder Slump Age Test Number Inches Days Date (ASTM C143} (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 381 6.00 7 06/01/99 382 6.00 7 06/01/99 383 6.00 28 06~22~99 384 6.00 28 06/22/99 82,3O0 2910 79,2OO 28OO 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: GKO (10:00am-11:00am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier A/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 474 Ticket No. 1322467 Time Batched 10:30am Time Sampled 11:15am Concrete Temp. IASTM C1084) 84°F Air Content (ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS (ASTM C39! Cylinder Slump Age Test Number Inches Days Date (ASTM C143) JOB NO.: 98.1064 DATE: 25 May 1999 SUPPLIER: TXI MiX NO. 784 Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix//2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 385 6.25 7 06/01/99 386 6.25 7 06101/99 387 6.25 28 06/22199 388 6.25 28 06/22/99 101,300 3580 105,300 3720 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: GKO (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 25 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 11 :OOam-12:30pm 1.5 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE A/5 30" 60.0' 61.0' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unlese noted otherwise'. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. TECHNICIAN: DISTRIBUTION: (]KO (I) Rebcon, Inc, {1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1084 CLIENT: Rebcon, Inc. DATE: 25 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: North piling cap (east haiti, east bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 4.60 Cement Ticket No. 1322378 Flyash Time Batched 9:25am Sand Time Sampled 10:35am in. Concrete Temp. IASTM C1064) 84°F 1.0 in. Air Content (ASTM C231) 3.4% Water Unit Weight ;ASTM C138) Admix //1 Admix //2 AEA 8272 COMPRESSIVE STRENGTH TESTS IASTM C39~ Cylinder Slump Age Test Number Inches Days Date CASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 381 6.00 7 06/01/99 382 6.00 7 06/01/99 383 6.00 28 06/22/99 384 6.00 28 06/22/99 82,300 2910 79,200 2800 107,100 3790 112,600 3980 28-Day Average 3890 3000 TECHNICIAN: DISTRIBUTION: GK0 {10:00am-11:00am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier A/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 474 Ticket No. 1322467 Time Batched 10:30am Time Sampled 11:15am Concrete Temp. (ASTM C1064) 84°F Air Content (ASTM C231) Unit Weight IASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IASTM C3Sl Cylinder Slump Age Teat Number Inches Days Date IASTM C143~ JOB NO.: 98.1064 DATE: 25 May 1999 SUPPLIER: TXI MIX NO. 784 Cement Flyash Sand in. 1.0 in. Water Admix 81 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 385 6.25 7 06/01/99 386 6.25 7 06/01/99 387 6.25 28 06/22/99 388 6.25 28 06/22/99 101,300 3580 105,300 3720 127,300 4500 130,100 4600 28-Day Average 4550 3000 TECHNICIAN: DISTRIBUTION: GKO (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier A/4 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 470 Ticket No. 1321693 Time Batched 11:05am Time Sampled 11:20am Concrete Teml~. {ASTM C1064) 91 °F Air Content (ASTM C231) Unit Weight IASTM c138l SET 2 COMPRESSIVE STRENGTH TESTS IASTM C391 MiX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix//2 AEA JOB NO.: 98.1064 DATE: 24 May 1999 SUPPLIER: TXI 795 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 120,100 4250 123,200 4360 377 6.25 7 05/31/99 378 6.25 7 05/31/99 379 6.25 28 06121/99 380 6.25 28 06/21/99 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: GKO (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier A/4 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 470 Ticket No. 1321693 Time Batched 11:05am Time Sampled 11:20am Concrete Temp. IASTM cloe4) 91 °F Air Content IASTM C231) Unit Weight (ASTM C138) SET 2 MIX NO. Cement Flyash Sand in, 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENOTH TESTS (ASTM C39l Cylinder Slump Age Test Number Inches Days Date (ASTM C143) JOB NO.: 98.1064 DATE: 24 May 1999 SUPPLIER: TXI 795 (Standard 6 inch x 12 inch cylinderl Total Load Compressive Required Pounds Strength 28-Day psi Strength 377 6.25 7 05/31/99 378 6.25 7 05/31/99 379 6.25 28 06/21/99 380 6.25 28 06/21/99 120,100 4250 123,200 436O 162,600 5750 153,300 5420 28-Day Average 5580 300O TECHNICIAN: DISTRIBUTION: GKO (1) Rebcon, Inc. (1) Ciw of Coppell, Garreth Campbell 2870 Walnut Hill I-erie Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATIQN CLIENT: Rebcon, Inc. DATE: 24 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 10:30am-12:30pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE East Bridoe Al4 30" 65.0' 65.0' NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. TECHNICIAN: DISTRIBUTION: GKO (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO,: 98.1064 CLIENT: Rebcon, Inc. DATE: 21 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, left turn lane on northbound Denton Tap Rd. at Natches Trace (middle of turn lane) LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 464 Cement Ticket No. 1319882 Flyash Time Batched 8:40am Sand Time Sampled 8:558m in. Concrete Temp. IASTM C10e4! 82°F 1.0 in. Air Content (ASTM C231) 4.4% Water Unit Weight IASTM C1381 Admix //1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS ;ASTM C3S~ Cylinder Slump Age Teat Number Inchea Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 373 4.25 7 05/28/99 374 4.25 7 05/28/99 375 4.25 28 06/18/99 376 4.25 28 06/18/99 92,600 3280 90,700 3210 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (8:00am-9:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 21 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, left turn lane on northbound Denton Tap Rd. at Natches Trace (middle of turn lane) LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 464 Cement Ticket No. 1319882 Flyash Time Batched 8:40am Sand Time Sampled 8:55am in. Concrete Temp. {ASTM ClOe4l 820F 1.0 in. Air Content (ASTM C231l 4.4% Water Unit Weight (ASTM C138l Admix //1 Admix //2 AEA 8274 COMPRESSIVE STRENGTH TESTS {ASTM C391 Cylinder Slump Age Test Number Inches Days Date (ASTM C143l (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 373 4.25 7 05/28/99 374 4.25 7 05/28/99 375 4.25 28 06/18/99 376 4.25 28 06/18/99 92,600 3280 90,700 3210 117,000 4140 122,700 4340 28-Day Average 4240 3OOO TECHNICIAN: DISTRIBUTION: JWD (8:00am-9:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton TaD Road, Coppell, TX LOCATION OF POUR SET 1: Pier B/7 @ east bridge LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 20 May 1999 SUPPLIER: TXl SAMPLE DATA: SET 1 Truck No. 716 Ticket No, 1318360 Time Batched 9:28am Time Sampled 10:30am Concrete Temp. (ASTM C1084) 86°F Air Content IASTM C231} Unit Weight (ASTM C1381 SET 2 COMPRESSIVE STRENGTH TESTS I^S~M c391 Cylinder Slump Age Test Number Inches Days Date IASTM C143) MIX NO. 0795 Cement 7 sks. Flyash Sand 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressiva Required Pounds Strength 28-Day psi Strength 369 6.00 7 05~27/99 370 6.00 7 05/27/99 371 6.00 28 06117/99 372 6.00 28 06/17/99 111,000 3930 114,000 4030 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier B/7 @ east bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 716 Ticket No. 1318360 Time Batched 9:28am Time Sampled 10:30em Concrete Temp. (ASTM C1064) 86°F Air Content (ASTM C231) Unit Weight (ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IAS~M C39) Cylinder Slump Age Test Number Inches Days Date {ASTM C143} JOB NO.: 98.1064 DATE: 20 May 1999 SUPPLIER: TXI MIX NO. 0795 Cement 7 sks. Flyash Send 1.0 in. Water Admix #1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Stren.gth 28-Day psi Strength 369 6.00 7 05/27/99 370 6.00 7 05/27/99 371 6.00 28 06/17/99 372 6.00 28 06/17/99 111,000 3930 114,000 4030 145,500 5150 139,700 4940 28-Day Average 5050 300O TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 20 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 9:30am-11:30am 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE BI7 36" 65.0' 65.1' 10:10 NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Paving @ Station 215 +38 LOCATION OF POUR SET 2: Paving @ Station 218 + 50 SAMPLE DATA: SET 1 SET 2 MIX NO. 8272 Truck No. 461 641 Cement Ticket No. 1316761 13;7067 Flyash Time Batched 8:21am 10:49am Sand Time Sampled 9:00am 11:20am in. Concrete Temp. ~ASTM cloe4) 83°F 84°F 1.0 in. Air Content IASTM C231 ) 4.1% 4.6 % Water Unit Weight (ASTM C138! Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS ~ASTM c3el Cylinder Slump Age Test Number Inches Days Date IASTM C143) JOB NO.: 98.1064 DATE: 19 May 1999 SUPPLIER: TXI (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 357 3.00 7 05~26~99 358 3.00 7 05/26/99 359 3.00 28 06/16/99 360 3.00 28 06/16~99 361 3.50 7 05~26/99 362 3.50 7 05/26199 363 3.50 28 06/16~99 364 3.50 28 06/16/99 104,900 3710 97,100 3430 130,700 4620 134,700 4760 28-Day Average 4690 100,800 3570 100,300 3550 134,900 4770 135,700 4800 28-Day Average 4790 3000 3000 TECHNICIAN: DISTRIBUTION: EDB (8:30am-10:00am, 10:30am-12:00 Noon) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CUENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Paving @ Station 222 + 50 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 711 Ticket No. 1317234 Time Batched 12:14pm Time Sampled 12:40pm Concrete Temp. IASTM C10641 82°F Air Content {ASTM C231) 4.5% Unit Weight (ASTM C1381 SET 2 JOB NO.: 98.1064 DATE: 19 May 1999 SUPPLIER: TXl MIX NO. 8272 Cement Flyash Sand 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39! Cylinder Slump Age Test Number Inches Days Date IASTM C143} (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 365 3.50 7 05/26/99 366 3.50 7 05/26/99 367 3.50 28 06/16/99 368 3.50 28 06/16/99 102,300 3620 102,900 3630 128,800 4560 132,300 4680 28-Day Average 4620 3OOO TECHNICIAN: DISTRIBUTION: EDB (12:00 Noon-l:30pm) (1) Rebcon, Inc. {1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Paving @ Station 215 +38 LOCATION OF POUR SET 2: Paving @ Station 218+50 SAMPLE DATA: SET 1 SET 2 MIX NO. 8272 Truck No. 461 641 Cement Ticket No. 1316761 1317067 Ryash Time Batched 8:21am 10:49am Sand Time Sampled 9:00am 11:20am in. Concrete Temp. IASTM C1064! 83°F 84°F 1.0 in. Air Content {ASTM C231) 4.1% 4.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENOTH TESTS IASTM C3Sl Cylinder Slump Age Test Number Inches Days Date (ASTM C143) JOB NO.: 98.1064 DATE: 19 May 1999 SUPPLIER: TXl (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 357 3.00 7 05/26/99 358 3.00 7 05/26~99 359 3.00 28 06/16~99 360 3.00 28 06/16/99 361 3.50 7 05/26/99 362 3.50 7 05/26199 363 3.50 28 06/16/99 364 3.50 28 06/16/99 104,900 3710 97,100 3430 28-Day Average 100,800 3570 100,300 3550 300O 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: ED6 (8:30am-10:00am, 10:30am-12:00 Noon) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Paving @ Station 222 + 50 LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 19 May 1999 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 711 Ticket No. 1317234 Time Batched 12:14pm Time Sampled 12:40pm Concrete Temp. (ASTM Cl0e41 82°F Air Content (ASTM C231) 4.5% Unit Weight {ASTM C138l SET 2 MIX NO. Cement Flyash Sand in. 1.0 in, Water Admix //1 Admix //2 AEA 8272 COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Test Number Inches Days Date {ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 365 3.50 7 05/26/99 366 3.50 7 05~26/99 367 3.50 28 06/16~99 368 3.50 28 06/16/99 102,300 3620 102,900 3630 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: EDB (12:00 Noon-l:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 18 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl LOCATION OF POUR SET 1: Paving, turn lane off of Denton Tap Road, east onto Natches Trace, 144' south of south edge of Natches Trace LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 460 Cement Ticket No. 1315786 Flyash Time Batched 8:42am Sand Time Sampled 9:15am in. Concrete Teml). IASTM cloe4l 83°F 1.0 in. Air Content IASTM C231i 5.2% Water Unit Weight (ASTM C1381 Admix //1 Admix //2 AEA 8274 COMPRESSIVE STRENGTH TESTS i^STM C3S! Cylinder Slump Age Test Number Inches Days Date (ASTM C1431 (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 349 4.75 7 05~25~99 350 4.75 7 05~5/99 351 4.75 28 06115/99 352 4.75 28 06/15/99 104,400 369O 101,700 3600 134,700 4760 131,600 465O 28-Day Average 4710 30OO TECHNICIAN: DISTRIBUTION: JWJ (9:00am-10:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc, PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier B/6, bottom half LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 650 Ticket No. 1316201 Time Batched 1:15pm Time Sampled 2:15pm Concrete Temp. IASTM C1064! 84°F Air Content (ASTM C231) Unit Weight {ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IASTM c3e} Cylinder Sluml~ Age Test Number Inches Days Date {ASTM C1431 JOB NO.: 98.1064 DATE: 18 May 1999 SUPPLIER: TXI MIX NO. 0784 Cement 6 sks. FIyash Sand in. 1.0 in. Water Admix //1 Admix #2 AEA (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 353 5.50 7 05/25199 354 5.50 7 05~25/99 355 5.50 28 06/15/99 356 5.50 28 06/15/99 115,400 4080 114,900 4060 147,200 5210 145,600 5150 28-Day Average 5180 3OOO TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: Pier B/6, bottom half LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 18 May 1999 SUPPLIER: TXI SAMPLE DATA: SET 1 Truck No. 650 Ticket No. 1316201 Time Batched 1:15pm Time Sampled 2:15pm Concrete Temp. (ASTM C1064i 84°F Air Content IASTM C231) Unit Weight (ASTM C138) SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA 0784 6 sks. COMPRESSIVE STRENGTH TESTS {ASTM C391 {Standard 8 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM Cl 431 psi Strength 353 5.50 7 05/25/99 354 5.50 7 05/25/99 355 5.50 28 06/15/99 356 5.50 28 06/15/99 115,400 4080 114,900 4060 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214} 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 18 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, turn lane off of Denton Tal3 Road, east onto Natches Trace, 144' south of south edge of Natches Trace LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 460 Cement Ticket No. 1315786 Flyash Time Batched 8:42am Sand Time Sampled 9:15am in. Concrete Temp. (ASTM C10§4) 83°F 1.0 in, Air Content {ASTM C231) 5.2% Water Unit Weight IASTM C1381 Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 349 4.75 7 05/25/99 350 4.75 7 05/25/99 351 4.75 28 06/15/99 352 4.75 28 06/15/99 104,400 3690 101,700 3600 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWJ (9:00am-10:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 ~214} 351-6419 Fax ~214~ 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing ~;TRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 18 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: l:00pm-3:O0pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE BI6 36" 65.0' 65.8' 1:55 NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 17 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at north side of creek, east side of bridge, pier B/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 804 Cement Ticket No. 1314888 FIyash Time Batched 7:50am Sand Time Sampled 8:40am in. Concrete Temp. (ASTM ClOa4) 82°F 1.0 in. Air Content {ASTM C231l 4.6% Water Unit Weight (ASTM C138) Admix #1 Admix //2 AEA 795 COMPRESSIVE STRENGTH TESTS IASTM C3m Cylinder Slump Age Test Number Inches Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 341 5.00 7 05/24/99 342 5.00 7 05/24~99 343 5.00 28 06/14~99 344 5.00 28 06/14~99 126,400 4470 122,600 4340 155,600 5500 155,300 5490 2B-Day Average 5500 3OOO TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 17 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at north side of creek, east side of bridge, pier B/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 804 Cement Ticket No. 1314888 Flyash Time Batched 7:50am Sand Time Sampled 8:40am in. Concrete Temp. {ASTM CLO64) 82°F 1.0 in. Air Content (ASTM C231} 4.6% Water Unit Weight (ASTM C138t Admix 81 Admix //2 AEA 795 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM CI 43) psi Strength 341 5.00 7 05/24/99 342 5.00 7 05/24/99 343 5.00 28 06/14/99 344 5.00 28 06/14/99 126,400 4470 122,600 4340 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 17 May 1999 PROJECT: Denton Tap Road, Copl~ell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, northbound left lane at Station 211 + 50 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 802 Cement Ticket No, 1 31 5377 Flyash Time Batched 11:11 am Sand Time Sampled 11:30am in. Concrete Temp. (ASTM CI064) 85°F 1.0 in. Air Content IASTM C2311 ~,.5% Water Unit Weight {ASTM C1381 Admix //1 Admix //2 AEA 8272 COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Sluml~ Age Teat Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C 143) psi Strength 345 2.00 7 05/24/99 346 2.00 7 05/24/99 347 2.00 28 06/14/99 348 2.00 28 06/14/99 114,000 4030 116,700 4130 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (11:00am-12:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing STRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 17 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 7:30am-9:30am 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE B/5 36" 65.0' 65.0' Trace NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Texas Shafts, Inc. 4) Reinforcing for pier was 8-//9 vertical bars with spiral rings on 4" center. 5) Inspector was to check rebar, final depth and make cylinders only. TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 17 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, northbound left lane at Station 211 + 50 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 802 Cement Ticket No. 1315377 Flyash Time Batched 11:11 am Sand Time Sampled 11:30am in. Concrete Temp. (ASTM C1064! 85°F 1.0 in. Air Content (ASTM C231) ~,.5% Water Unit Weight IASTM C138l Admix //1 Admix //2 AEA 8272 COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Test Number Inches Days Date IASTM Cl (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength ?.8-Day psi Strength 345 2.00 7 05124/99 346 2.00 7 05124/99 347 2.00 28 06/14/99 348 2.00 28 06/14/99 114,000 4030 116,700 4130 160,100 5660 154,300 5460 28-Day Average 5560 3OOO TECHNICIAN: DISTRIBUTION: MFM (11:00am-12:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 14 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: South abutment beam at east bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 464 Cement Ticket No. 1314137 Flyash Time Batched 1:50pm Sand Time Sampled 2:15pm in. Concrete Temp. iASTM cloe4! 80°F 1.0 in. Air Content IASTM C231l 4.0% Water Unit Weight {ASTM C1381 Admix 81 Admix 82 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 337 5.50 7 05/21/99 338 5.50 7 05/21/99 339 5.50 28 06/11/99 340 5.50 28 06/11/99 98,700 3490 94,200 3330 132,400 4680 133,800 4730 28-Day Average 4710 4000 TECHNICIAN: DISTRIBUTION: MFM (1:45pm-3:15pm) (t) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 14 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: South abutment beam at east bridge LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 464 Cement Ticket No. 1314137 Flyash Time Batched 1:50pm Sand Time Sampled 2:15pm in. Concrete Temp. (ASTM C1084~ 80°F 1.0 in. Air Content (ASTM C231l 4.0% Water Unit Weight (ASTM C138} Admix //1 Admix //2 AEA 8274 COMPRESSIVE STRENGTH TESTS (ASTM C39i (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM Cl 43) psi Strength 337 5.50 7 05/21/99 338 5.50 7 05/21/99 339 5.50 28 06/11/99 340 5.50 28 06/11/99 98,700 3490 94,2O0 333O 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: MFM (1:45pm-3:15pm) (1) Rebcon, Inc, (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 ~214) 351-6419 Fax (214~ 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1084 CLIENT: Rebcon, Inc. DATE: 13 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Bridge columns at south side of east bridge: C/4 and C/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 471 Cement Ticket No. 1311844 Flyash Time Batched 8:40am Sand Time Sampled 9:30am in. Concrete Teml~. IASTM c10e4) 80°F 1.0 in. Air Content (ASTM C231) 4.4% Water Unit Weight IASTM C138} Admix//1 Admix //2 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM c3el Cylinder Slump Age Test Number Inches Days Dete lA'TM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength ?-8-Day psi Strength 329 5.00 7 05/20~99 330 5.00 7 05/20~99 331 5.00 28 06/10~99 332 5.00 28 06/10/99 103,800 367O 106,300 376O 135,000 4770 137,000 4850 28-Day Average 4810 4OOO TECHNICIAN: DISTRIBUTION: JWD (9:00am-lO:3Oam) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 13 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at north side of east bridge pier B/4 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 714 Cement Ticket No. 1312095 Flyash Time Batched 10:4 lam Sand Time Sampled 11:40am in. Concrete Temp. IASTM ClOe4) 81QF 1.0 in. Air Content (ASTM C231) Z~.6% Water Unit Weight (ASTM C13S} Admix # 1 Admix //2 AEA 784 COMPRESSIVE STRENGTH TESTS (ASTM C39! (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C 143) psi Strength 333 4.50 7 05/20/99 334 4,50 7 05/20/99 335 4.50 28 06/10/99 336 4,50 28 06/10/99 107,800 3810 108,400 3830 137,000 4850 135,800 4800 28-Day Average 4830 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, inc. DATE: 13 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Bridge columns at south side of east bridge: C/4 and C/5 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 471 Cement Ticket No. 1311844 Flyash Time Batched 8:40am Sand Time Sampled 9:30am in. Concrete Temp. (ASTM C1084) 80°F 1.0 in. Air Content {ASTM C231l 4,4% Water Unit Weight [ASTM C138l Admix #1 Admix #2 AEA 8274 COMPRESSIVE STRENGTH TESTS IASTM c3el Cylinder Sluml~ Age Test Number inches Days Date IASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 329 5.00 7 05/20~99 330 5.00 7 05/20/99 331 5.00 28 06/10/99 332 5.00 28 06/10~99 103,800 3670 106,300 3760 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: JWD (9:00am-10:30am) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-6148 Hopper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 13 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier at north side of east bridge pier B/4 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 714 Cement Ticket No. 1312095 Flyash Time Batched 10:41 am Sand Time Sampled 11:40am in. Concrete Temp. IASTM c1064) 81 °F 1.0 in. Air Content (ASTM C231) 4.6% Water Unit Weight IASTM C138l Admix #1 Admix #2 AEA 784 COMPRESSIVE STRENGTH TESTS IASTM C3S~ Cylinder Slump Age Test Number inches Days Date {ASTM C143) (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 333 4.50 7 05/20~99 334 4.50 7 05/20~99 335 4.50 28 06/10/99 336 4.50 28 06/10/99 107,800 3810 108,400 3830 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing ~TRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 13 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 10:30am-12:30pm 2.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE B/4 36" 65.0' 65.2' Trace NOTES: 1 ) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Texas Shafts, Inc. 4) Reinforcing consisted of 8-#9 vertical bars with spiral rings on 4" center. 5) Inspector verified hole diameter and total depth of pier. TECHNICIAN: DISTRIBUTION: JWD (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing ~;TRAIGHT SHAFT PIER INSTALLATION OBSERVATION CLIENT: Rebcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tap Road, Coppell, TX JOB NO.: 98.1064 DRILLER: Texas Shafts TIME: 7:00am-lO:OOam 3.0 hours PIER MARK SHAFT TOP OF ALIGN/ DEPTH REQ'D. ACTUAL TOTAL FINAL WATER DIA. CONC. ELEV. PLUMB TO GREY DEPTH PENE. DEPTH POUR IN HOLE D/7 30" SE Wing Wall 18" 62.2' 62.2' (4) 62.2' 62.4' i4! NOTES: 1) Pier reinforcing verified to be correct in accordance with project plans and specifications, unless noted otherwise. 2) Total Depth was measured from current grade at time piers were drilled. Contractor must furnish actual elevation, if required. 3) Required depth furnished by Rebcon, Inc. 4) Concrete placed under 35' of water using solid tremie extending to bottom of hole. 5) Concrete due on job at 8:00am. Concrete arrived 8:55am. TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell 2870 Walnut Hill Lane C)allas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Rebcon, Inc. PROJECT: Denton Tap Road, Coppell, TX LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 98.1064 DATE: 6 May 1999 SUPPLIER: TXI Paving, Station 212 + 93, 10' west of east curbline on northbound side of Denton Tap Road Paving, Station 211 +00, 10' west of east curbline on northbound side of Denton Tal~ Road SAMPLE DATA: SET 1 SET 2 Truck No. 836 836 Ticket No. 1306152 1306275 Time Batched 9:55am 10:55am Time Sampled 10:24am 11:33am Concrete Temp. (ASTM ClOe4) 86°F 86OF Air Content IASTM C231) 3.6% 4.0% Unit Weight (ASTM C138) MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix #2 AEA 8272 5 sks. COMPRESSIVE STRENGTH TESTS IASTM C3Sl (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) {)si S~l'~ng~h 321 3.00 322 3.00 323 3.00 324 3.00 325 3.25 326 3.25 327 3,25 328 3.25 5 05/11/99 104,900 3710 7 05/13/99 111,000 3930 28 06/03/99 132,600 4690 28 06/03t99 138,500 4900 28-Day Average 4800 5 05/11/99 100,300 3550 7 05/13/99 102,900 3640 28 06/03/99 132,300 4680 28 06/03/99 129.900 4590 28-Day Average 4640 30OO 3000 TECHNICIAN: DISTRIBUTION: JWJ (10:00am-12:30pm) (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing. REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tel3 Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, northbound Denton Tap Rd. @ Station 214+ 50 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 466 Cement Ticket No. 1305899 Flyash Time Batched 8:03am Sand Time Sampled 8:40am in. Concrete Temp. ~ASTM ClO64~ 79°F 1.0 in. Air Content IASTM C231) 4.1% Water Unit Weight IASTM C138} Admix #1 Admix #2 AEA 8272 5 sks. COMPRESSIVE STRENGTH TESTS ~ASTM C3S) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day lA,TM C143) psi Strength 317 2.00 5 05/11/99 318 2.00 7 05/13/99 319 2.00 28 06/03/99 320 2.00 28 06/03/99 97,600 345O 101,000 3570 127,500 4510 132,300 4680 28-Day Avenge 4600 3OOO TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JO8 NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl LOCATION OF POUR SET 1: Pier D/7 at east bridge, bottom portion LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 807 Ticket No. 1306018 Time Batched 8:40am Time Sampled 9:10am Concrete Teml). (ASTM c10e41 81 °F Air Content IASTM C231i Unit Weight (ASTM C138) SET 2 COMPRESSIVE STRENGTH TESTS IASTM C39) MIX NO. 0795 Cement 7 sks. Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Re¢tulred Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 313 6.50 7 05/13/99 314 6.50 7 05/13/99 315 6.50 28 06/03/99 316 6.50 28 06/03/99 134,100 4740 135,800 4800 157,100 5560 161,400 5710 28-Day Average 5640 3O0O TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) CiW of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Pier D/7 at east bridge, bottom ;)ortion LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 807 Cement Ticket No. 1306018 Flyash Time Batched 8:40am Sand Time Sampled 9:10am in. Concrete Teml~. (ASTM C1064~ 81 °F 1,0 in. Air Content IASTM C231) Water Unit Weight IASTM C138i Admix //1 Admix //2 AEA 0795 7 s~. COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Teat Number Inches Days Date (ASTM C1431 (Standard 6 inch x 12 inch cylinder) Total Load Compressive Required Pounds Strength 28-Day psi Strength 313 6.50 7 05/13/99 314 6.50 7 05/13/99 315 6.50 28 06/03/99 316 6.50 28 06/03/99 134,100 4740 135,800 4800 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill I-ane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rabcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXI LOCATION OF POUR SET 1: Paving, northbound Denton Tap Rd. @ Station 214 + 50 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 466 Cement Ticket No. 1305899 Flyash Time Batched 8:03am Sand Time Sam[Died 8:40am in. Concrete Temp. (ASTM ClOe4i 79°F 1.0 in. Air Content IASTM C231! 4.1% Water Unit Weight IASTM C138l Admix #1 Admix #2 AEA 8272 5 sks. COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 317 2.00 5 05/11/99 318 2.00 7 05/13/99 319 2.00 28 06~03/99 320 2.00 28 06/03/99 97,600 345O 101,000 3570 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: MFM (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 98.1064 CLIENT: Rebcon, Inc. DATE: 6 May 1999 PROJECT: Denton Tap Road, Coppell, TX SUPPLIER: TXl LOCATION OF POUR SET 1: Paving, Station 212 + 93, 10' west of east curbline on LOCATION OF POUR SET 2: northbound side of Denton Tap Road Paving, Station 211 +00, 10' west of east curbline on northbound side of Denton Tap Road SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 836 836 Cement Ticket No. 1306152 1306275 Flyash Time Batched 9:55em 10:55am Sand Time Sampled 10:24am 11:33am in. Concrete Temp. (ASTM C10e4) 86°F 86OF 1.0 in. Air Content (ASTM C231) 3.6% 4.0% Water Unit Weight {ASTM C138) Admix #1 Admix #2 AEA 8272 5 sks. COMPRESSIVE STRENGTH TESTS IAS~ C39~ (Standard 6 inch x 12 inch cylinder] Cylinder Slump Age Teat Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1431 psi Strength 321 3.00 5 05/11/99 322 3.00 7 05/13/99 323 3.00 28 06/03/99 324 3.00 28 06/03~99 325 3.25 5 05/11/99 326 3.25 7 05/13/99 327 3.25 28 06/03/99 328 3.25 28 06/03/99 104,900 3710 111,000 3930 28-Day Average 100,300 3550 102,900 3640 300O 28-Day Average 3000 TECHNICIAN: DISTRIBUTION: JWJ (10:00am-12:30pm] (1) Rebcon, Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas. Texas 75229 (214) 351-6419 Fax (214) 351-5148