Freeport NIP(8.0)-LR041011 ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Sto. 150, Houstoa, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.:
219720
049245
09/30/2004
10/11~004
Project No.:
Date of Service:
Report Date:
Freeport XI & XII
Coppell, Texas
Obtain samples of fresh concrete at the placement locauons, perform reqmred field testing, cast compresstve sh'ength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
ptA~rr: 27
SPECUnCATION REQUm~MEWrS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C- 172
ASTM C-31
ASTM C- 143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 09/30/2004
WEATHER CONDITIONS:
TIME SAMPLED: 4:30am
TEMPERATURE (F) - AIR
TRVCKNO: 93 1
Am coNTeNT (%): NA
Clear
BATCIt TIME: 3:55alll
75 v CONCRETe: 83 r
XICRET NO: 701026
UNIT WEIGHT (pcO: NA
MEASURED
SLUMP
(inche~)
5.0
OVERALL PLACEMENT LOCATION:
Slab at gridlines 8 to 15 at A-D
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
CYLINDER
MARKED DATE AGE DIAMETER
SET NO. TESTED (days) (inches)
1 1 10/07/2004 7 6.00
1 2 10/28/2004 28 0.00
1 3 10/28/2004 28 0.00
1 4 Hold
Water added at site: 10 gallons
MAXIMUM COMPRESSIVE
AREA LOAD STRENGTH FRACTURE
(sq.in.) (lbs. force) (psi) TYPE
28.26 152350 5390 Unbonded Cap
0.00 Unbonded Cap
0.00 Unbonded Cap
resemedherethwere repared basad upon the spec fic samples provided for testing We assume no responsibility for variation in quality
LIMITATIONS: The test result~ p .P - - t ' :'-- e.hie~t mat~er nrovided bv oersons or conditions over wh ch we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed ~d shall not be reproduced except m full without the wntton approval of Rone Engineers, Ltd
Pa~e 1 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C~39
PROJECT DATA
MIX DESIGN I.D.: 9349
Pr~CE~I~NT DAT~: 09/30/2004
W~ATHER CONDITIONS: C ]~:ar
TIME SAMPLED: 5:30urn BATCH TIME: 4:39am
TEMPERATURE (F) - AIR 76 F CONCRETE: 84 F
TgVCKNO: 1815 TICKET NO: 701036
Am cO.rENT ('/.): NA tr~rr WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Slab at g~dlines 8 m 15 at A-D
MEASURED
SLUMP
(inches)
5.5
SAMPLE LOCATION:
REPORT OF TESTS
Coner~¢ Compressive Cylinder 6" x 12"
13.6 at A.9
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (Ib~ force) (psi) TYPE
2 1 10/07/2004 7 6.00 28.26 154510 5460 Unbonded Cap
2 2 10/28/2004 28 0.00 0.00 Unbonded Cap
2 3 10/28/2004 28 0.00 0.00 Unbonded Cap
2 4 Hold
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~sume no responsibility for variation in quality
(composition, appearance, perform=ce, ate.) or any other feature of similar subject matter provided by. persons .or ~c ,o.n di~.ons~ o,ver w~ich we h aw_ ,n _o~ c~o_n_tr~o[ n ~O~in el~emt~. ~t ~ d
Page 2 of 7
Roi
ineers
8908 Ambassador Row, Dallas, TX 75:247
2696 Gravel Drive, Fort Worth, TX 76115
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Project: Freeport XI & XiI
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
MR (%):
TEST METHOD:
CONT~CTOm Duke Construction
CONCRETE SUPPLIER: Southerll St~r
PLAwr: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
pLACEMENT DATE: 09/30/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 6:lSam BATCHT1ME: 5:35am
TEMPERATURE tir) - AIR 76 F CONCRETE: 86 F
TRUCKNO: 648 TICKETNO: 701046
AIR CONTENT (%): lxlA UNIT WEIGHT (pcf): NA
OVERALL PLACEMENT LOCATION:
Slab at g~idlines $ to 15 at A-D
MEASURED
SLUM~
(inches)
5.75
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
12.8 at B.6
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (gl.in.) (Iba force) (psi) TYPE
3 1 10/07/2004 7 6.00 28.26 133050 4710 Unbonded Cap
3 2 10/28/2004 28 0.00 0.00 Unbonded Cap
3 3 10/28/2004 28 0.00 0.00 Unbonded Cap
3 4 Hold
Water added at site:
10 gallons
LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use oftha clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
com~aAcroR: Duke Construction
CONCRETE SUPPLIER: Solltherfl Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
6" maximum
NA
ASTM Co172
ASTM C-31
ASTM C-143
ASTM C-231
^STM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
M~X DESIGN LD.: 9349
PLACEMENT DATE: 09/3 0/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 7:15am BATCH T~: 6:25am
TEMPERATURE (F)- AIR 77 F CONCRETE: 84 g
TRUCK NO: 1827 TICKET NO: 701056
AIR CONTENT (%): NA tr~y WEIGHT (peO: NA
OVERALL PLACEMENT LOCATION:
Slab at lgidlines 8 to 15 at A-D
MEASURED
SLUMP
(inches)
6.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
11.9 at C.9
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) Obs. force) (psi) TYPE
4 1 10/07/2004 7 6.00 28.26 131380 4650 Unbonded Cap
4 2 10/28/2004 28 0.00 0.00 Unbonded Cap
4 3 10/28/2004 28 0.00 0.00 Unbonded Cap
4 4 Hold
Water added at site:
10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lette~ and
reports are for the exclusive use of the clients to whom they are addressed and sbeil not be reproduced except m full without the written approval of Rone Engineers, Ltd.
31SS Page 4 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214} 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concreU~ at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUM~ 0a):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: S0uthem Star
pt~rr: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
MIX DESIGN LD.: 9349
pt~CEMEm' DAI£: 09/30/2004
WEATHER CONDITIONS: Clear
TIME SAM]'LED: 8:00alI1 BATCH ~ME: 7:30am
TEMPERATURE (F) - Am 77 F CONCRETE: 81 F
TRUCK NO: 1824 TlC~T NO: 701066
AIR CONTENT (%): NA uNrr WEIGHT (pcO: NA
OVERALL PLACEMENT LOCATION:
Slab at gridlines 8 to 15 at A-D
MEASURED
SLUMP
(inche~)
5.25
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
10.7 at B.2
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) Obs. force) (psi) TYPE
5 1 10/07/2004 7 6.00 28.26 131010 4630 Unbonded Cap
5 2 10/28/2004 28 0.00 0.00 Unbonded Cap
5 3 10/28/2004 28 0.00 0.00 Unbonded Cap
5 4 Hold
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, performance, etc.) or any other feature of similar subject mattor prowded by persons or contht~ons over which we have no control Our letters
reports are for the exclusive use of the clients to whom they a~ addressed and shall not 10c reproduced except in full without the written approval of Rone Engineers. Ltd.
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: FreepmX XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
I~EASURED
STRENGTH:
SLUM~ (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PI.ANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C~231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 09/30/2004
WEA'IH~,R CONDITIONS: Clear
TIME SAMPLED: 8:40am BATCH TOVm: 7:30am
TEMPERATURE(Fl-AIR 77 F CONCP~TE: 83 F
T~UCK NO: 1020 TICKET NO: 701076
Am CONTENT (%l: HA t~rr WEIGHT (pcf): HA
OVERALL PLACEMENT LOCATION:
Slab at gfidlines 8 to 15 at A-D
SLUMP
(inches}
5.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
10.2 at C.6
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) Obs. force) (psi) TYPE
6 1 10/07/2004 7 6.00 28.26 132030 4670 Unbonded Cap
6 2 10/28/2004 28 0.00 0.00 Unbonded Cap
6 3 10/28/2004 28 0.00 0.00 Unbonded Cap
6 4 Hold
Water added at site:
5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any oilier feature of similar subject matter provided by persons or conditions over which we have no consol. Our leaers and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
n~gg Page 6 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219720
Project No.: 049245
Date of Service: 09/30/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive slrength samples and bnng
samples back to the laboratory for coring and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
M1X DESlGN I.D.: 9349
pLACEMENT DATE: 09/30/2004
WEATHER CONDITIONS: Sunny
TIME SAMPLED: 9:30am BATCH TIME: 9:00am
TEMPERATURE (F)- AIR 74 F CONCRETE: 82 F
THVCKNO: 1815 TIC~mTNO: 701084
Am CONTENT (%): NA tn~rr W~iGtrr (po0: NA
OVERALL pLACEMENT LOCATION:
Slab at gfidlines 8 to 15 at A-D
MEASURED
SLUMI~
(inches)
4.75
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
9.4 at A.2
CYLINDER
MARKED DATE AGE
SET NO. TESTED (days)
7 1 10/07/2004 7
7 2 10/28/2004 28
7 3 10/28/2004 28
7 4 Hold
Water added at site:
Technician: Scott Mitchell
Report Distribution:
(1) Duke Realty Services, LP
( 1 ) Ex:a'anet
(1) City of Coppell
(1) City of Coppell
MAXIMUM COMPRESSIVE
DIAMETER AREA LOAD STRENGTH FRACTURE
(inches) (sq.in.) (lbs. force) (psi) TYPE
6.00 28.26
0.00 0.00
0.00 0.00
117620
5 gallons
Started: 3:00am Finished: 1 l:00am
4160 Unbonded Cap
Unbondexl Cap
Unbonded Cap
K. Scott Watson, AET
CMT Operations Manager
LLMITATIONS: The test resulls presented herein were prepared b~sed upon thc specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lette~ and
reports are for the exclusive use of the clients to whom they are addressed ~nd shall not be reproduced except in full without the written approval of Roue Engineers, Ltd.
Paoe 7 of 7
ilneers
8908 Ambassador Row, Dallas, TX 73247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian SWaley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of~esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southerrl Star
PLANT: 27
SPECLHCATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLnC~MEWr DATE: 10/01/2004
WEATHE~ CON~mONS: Cloudy
TIME SAMPLED: 6:30am BATCH TIME: 5:54am
TEMPERATURE (F) - AIR 69 F CONCRETE: 81 F
TRUCK NO: 1827 TIC~T NO: 701123
AIR CONTENT (%): NA wrr WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Slab on grade 1-8 and A-D
MEASURED
SLUMP
(inches)
$.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
7.8 at A~2
CYLINDER
]~klLKED DATE AGE
SET NO. TESTED (days)
MAXIMUM COMPRESSIVE
DIAMETER AREA LOAD STRENGTH FRACTURE
(inch.) (sq.in.) (lbs. force) (psi) TYPE
1 1 10/08/2004 7
1 2 10/29/2004 28
1 3 10/29/2004 28
1 4 Hold
Water added at site: 5 gallons
6.00 28.26 136530 4830 Unbonded Cap
0.00 0.00 Unbonded Cap
0.00 0.00 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without thc wriaen approval of Rone Engineers, Ltd.
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CO~ACTOR: Duke Construction
CONCRETE SUPPLIER: Southcrfl Star
pLA~c: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/01/2004
WEATHER CONDITIONS: Cloudy
TIME SAMi°LED: 7:30am BATCHTIME: 6:50aI~1
TEMPERATURE (F) - AIR 69 F CONCRETE: 83 F
TRUCK NO: 8 TICKET NO: 701136
AIR CONTENT (%): NA v~rr WEIGHT (pcO: NA
OVERALL PLACEMENT LOCATION:
Slab on grade 1-8 and A-D
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
7.1 at C.6
MEASURED
SLUMP
(inch,)
6.0
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
2 1 10/08/2004 7 6.00 28.26 121170 4290 Unbondod Cap
2 2 10/29/2004 28 0.00 0.00 Unbonded Cap
2 3 10/29/2004 28 0.00 0.00 Unbonded Cap
2 4 Hold
Water added at site: 5 gallons
LIMITATIONS: The test results p~sen~ed herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject ma~er pwvided by persons or conditions over which we have no contsol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page 2 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realt~ Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Serviee: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: SouthelTl Stay
pLA~T: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN LO.: 9349
pLACEMENT DATE: 10/01/2004
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 8:15a~ BATCHTIME: 7:45am
TEMPERAm (F)- AIR 69 F CONCRETE: 86
X~VCK NO: 1827 TlC~T NO: 701146
nm cowr~NT (%): NA t~rr WEIGHT (pet): NA
OVERALL pLACEMENT LOCATION:
Slab on grade 14 and A-D
MEASURED
SLUMP
(inches)
5.5
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
6.7mB.3
MAXIMUM COMPRESSIVE
CYLINDER FRACTURE
MARKED DATE AGE DIAMETER ARF~ LOAD STRENGTH
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
3 1 10/08/2004 7 6.00 28.26 139280 4930 Unbondod Cap
3 2 10/29/2004 28 0.00 0.00 Unbondod Cap
3 3 10/29/2004 28 0.00 0.00 Unbonded Cap
3 4 Hold
Water added at site:
15 gallons
LIMITATIONS: The test results presented herein were prepared bared upon the specific samples provided for testing. We arsume no responsibility for variation in quality
(composition, appearance,.porformance, e!c. )or any othe~ feature of.similar, sub. j~t .m.. _a~e. ~r ?~_v!d~e~.d. ~by~ p~e~m~ ~o~ ;o~r f~wdil~hO~u~t ~rw~Wih~hn ~oa~/n~f ~ntreO~n~ Jeem~,~t~nd
Page 3 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel DHve, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Oblain samples offi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AlP. (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: SoutheFI1
ether: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN LD.: 9349
PLACEMENT DATE: 10/01/2004
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 9:00am BATCHTIME: 8:35am
TEMPERATURE {F)- AIR 71 r CONCl~Tl~: 85 I~
TRUCK NO: 0 TICKET NO: 701156
AIR CONTENT (%): NA t~rr wziG~rr (pc0: NA
OVERALL pLACEMENT LOCATION:
Slab on grade 1-8 ired A-D
MEASURED
SLUMP
(inches)
6.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
5.9 at A.8
MAXIMUM COMPRESSIVE
CYLINDER FRACTURE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
4 1 10/08/2004 7 6.00 28.26 123270 4360 Unbonded Cap
4 2 10/29/2004 28 0.00 0.00 Unbondext Cap
4 3 10/29/2004 28 0.00 0.00 Unbonded Cap
4 4 Hold
Water added at site:
15 gallons
LIMrrATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We =sume no responsibility for variation in quality
ositi earance, ormance, ere ) or any other feature of similar subject mater provided by persons.or con di~i. ons o.ver wl?ch we have,no~ ~c~n~r0[ O~-~l~.~e ~o ~and
(comp on, app perg e chents to whom th are addressed and shall not be reproduced except m full wlmout toe wntton approva~ or ~one =ng n==,~ ~
reports are for the exclusive use of th ' ey '
RoneEn gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
A~R (%):
TEST METHOD:
CO~m~CTOR: Duke Construction
CONCRETE SUPPLIER: Southenl Star
?L~T: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C- 172
ASTM C-31
ASTM C- 143
ASTM C-231
ASTM C- 1064
ASTM C- 1231
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/01/2004
WEATHER CONDITIONS: Cloudy
T~VmSAM~LED: 10:30am BATCHTIME: 9:45am
TEMPERATURE (F} - AIR 71 F CONCRETE: 85 F
TRUCK NO: 0 TICKET NO: 701170
AIR CONTENT (%): NA UNIT WEIGHT (poi): NA
OVERALL PLACEMENT LOCATION:
Slab on grade 1-8 and A-D
MEASURED
SLUMP
(inches)
6.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
4.6~C.2
MAXINIUM COMPRESSIVE
CYLINDER FRACTURE
MARKED DATE AGE DIA/vlETER AREA LOAD STRENGTH
SET NO. TESTED (days) (inches) (sqAn.) (lbs. force) (psi) TYPE
5 1 10/08/2004 7 6.00 28.26 112340 3970 Unbondod Cap
5 2 10/29/2004 28 0.00 0.00 Unbonded Cap
5 3 10/29/2004 28 0.00 0.00 Unbonded Cap
5 4 Hold
Water added at site:
5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific smmples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, otc,) or any other feature of similar subject maRer provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the writWa approval of Rone Engineers, Ltd.
PaRe 5 of 7
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratoE~ for curing and testing in accordance with applicable standards.
PROJECT DATA
MEASURED
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: SoutheHI Star
?LA~: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-1231
ASTM C-39
MIX DESIGN LD.: 9349
PLACEMENT DATE: ] 0/01/2004
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: ll:30am BATCHTIME: ll:07am
TEMPERATURE (F)- AIR 70 F CONCRETE: 84 F
TRUCK NO: 773 TIC~ET NO: 701181
Am coNTENT (%): NA t~IT WEIGHT (pcf}: NA
OVERALL pLACEMENT LOCATION:
Slab on ~ade 1-8 and A-D
SLUM~
(inches)
6.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
3.9 at A. 1
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) 0b~ force) (psi) T~PE
6 1 10/08/2004 7 6.00 28.26 102050 3610 Unbonded Cap
6 2 10/29/2004 28 0.00 0.00 Unbonded Cap
6 3 10/29/2004 28 0.00 0.00 Unbonded Cap
6 4 Hold
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no cona'ol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
Pace 6 of 7
RoneEr 81neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Report No.: 219869
Project No.: 049245
Date of Service: 10/01/2004
Report Date: 10/11/2004
Project: Freeport XI & XII
Coppell, Texas
Services: Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PI~.NT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
PROJECT DATA
MEASURED
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 10/01/2004
WEATItER CONDITIONS: Cloudy
TIME SAMPLED: 12:45pm BATCHTIME: 12:09pm
TEMPERATURE (F) - AIR 71 F CONCRETE: 85 F
TRUCK NO: 0 TICKET NO: 701193
Am COWrEwr (%): NA t~rr WEIGHT (pc0: NA
OVERALL pLACEMENT LOCATION:
Slab on grade 14 and A-D
SL~
(inches)
6.0
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
1.8 at B.7
CYLINDER
MARKED DATE AGE
SET NO. TESTED (days)
DIAMETER
(inches)
MAXIMUM COMPRESSIVE
AREA LOAD STRENGTH FRACTURE
(sq.in.) (lbs. force) (psi) TYPE
7 1 10/08/2004 7
7 2 10/29/2004 28
7 3 10/29/2004 28
7 4 Hold
Water added at site: 10 gallons
Technician: Scott Mitchell
Report Distribution:
(1) Duke Realty Services, LP
(1) Extranet
(1) City of Coppdl
(1) City of Copp~ll
6.00
0.00
0.00
Started: 5:15am
28.26
0.00
0.00
105800
Finished: 2:00pm
3740 Unbonded Cap
Unbonded Cap
Unbonded Cap
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject mailer provided by persons or conditions over which we have no conlxol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wrinen approval of Rone Engineers, Ltd.
PaRe 7 of 7