Freeport NIP(8.0)-LR041006Roi i nee rs 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Report No.: 219367 Project No.: 049245 Date of Service: 09/27/2004 Report Date: 10/06/2004 Services: Drilled Pier Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform a Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 5 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP ( 1 ) £xtxanet (1) City of Coppell (1) City of Coppell 6:30am - 5:30pm Rone Engineers, Ltd. --~o/- K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our le~aers and reporls are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Really Services, LP Report No.: 219367 Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/27/2004 Page 2 of 5 Driller: Long Foundation ?ier Identification E.3-15 D.5-15 C.8-15 C-15 B.3-15 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (fi) 8.00 8.00 8.30 8.60 8.00 Depth of Bearing Stratum From Surface (f0 Required Penetration (f~) Note 1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fl) N/A N/A N/A N/A N/A Number of Bars / Reinfoming Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fi) 7.00 7.50 8.00 8.00 7.60 Time Drilling was Completed (am / pm) 8:55 AM 9:06 AM 9:I9 AM 9:33 AM 9:47 AM Time Concrete was Placed (am / pm) 11:30 AM 11:42 AM 12:50 PM 1:00 PM 1:25 PM Depth of Pier From Top of Concrete (ft) 7.60 8.00 8.30 8.60 7.90 Elevation: Surface (fl)** 98.40 98.00 98.00 98.00 98.10 Elevation: Top of Pier (fi)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (fi)* * 90.40 90.00 89.70 89.40 90.10 Elevation: Top of Bearing Stratum (ft.)** Note 1 Beating Stratum (description) Tan, brown and gray clay Note: See report #219368 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. **Elevation by others Remarks: Building XI Note 1: No peneS'etlon / piers are to be 8' or top of sand, whichever is first. LIMITATIONS: The test resul~ presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation ~n quality (composition, appearance, per[ormance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whorn theyare addressed and shall n°t be repr°duced except in full with°ut the wdtten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219367 Project No.: 049245 Project: Freeport X1 and XII Date of Service: 9/27/2004 Page 3 of 5 Driller: Long Foundation Bldg. XII Pier Identification A.5-15 A-14.5 A-6.8 Pier Diameter (in) 60" 60" 60" ,Depth of Pier From Surface (ft) 7.80 7.70 7.80 Depth of Bearing Stratum From Surface (ft) Required Penetration (fi) Note 1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Casing Diameter (in) / Casing Length (ft) N/A N/A N/A qumber of Bars / Reinforcing Bar Size 6 ///6 6 / 4/6 6 / #6 Length of Reinforcing Steel (fi) 8.00 7.00 7.30 Time Drilling was Completed (am / pm) 10:03 AM 10:14 AM 1:48 PM Time Concrete was Placed (am / pm) 1:35 PM 2:24 PM 5:00p, Depth of Pier From Top of Concrete (fi) 8.50 7.70 7.80 Elevation: Surface (ft)** 97.30 95.00 95.00 Elevation: Top of Pier (ft)** 98.00 95.00 95.00 Elevation: Bottom of Pier (fi)** 89.50 87.30 87.20 Elevation: Top of Bearing Stratum (ft.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay Note: See report //219368 for Compressive Strength Test Specimens. Additional penetration not requested unless noted. **Elevation by others Remarks: Building XI Note 1: No penetration / piers are to be 8' or top of sand, whichever is first. L~MITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in uality (composition, appearance, performance, etc.) or any other feature of similar subject maffer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wTtiten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219367 Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/27/2004 Page 4 of 5 Driller: Long Foundation Pier Identification E.3-1 A-1.5 A-2.2 A-2.8 A-3.3 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (ft) 8.60 7.30 6.60 8.00 7.80 Depth of Bearing Stratum From Surface (fl) Required Penetration (fi) Note 1 Actual PeneU'ation (fl)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes 2a~ing Diameter (in) / Casing Length (fl) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (ft) 8.20 NA NA NA NA Time Drilling was Completed (am / pm) 8:40 AM 10:28 AM 10:40 AM 11:26 AM 11:40 AM Time Concrete was Placed (am / pm) 2:34 PM 2:40 PM 3:00 PM 3:12 PM 3:20 PM Depth of Pier From Top of Concrete (fl) 8.60 7.20 6.30 7.90 7.80 Elevation: Surface (fi)** 98.00 95.10 95.30 95.10 95.00 Elevation: Top of Pier (fl)** 98.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (ft)* * 89.40 87.80 88.70 87.10 87.20 Elevation: Top of Bearing Stratum (fl.)** Note 1 Bearing Stratum (descrition) Tan, brown and gray clay Note: See report #219368 for Compressive Strength Test Specimens. Additional Penetration not reques~d unless noted. **Elevation by others ~emarks: Building XII Note 1: No penetration / piers are to be 8' or top of sand, whichever is first. LIMITATIONS: The test result~ presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no contreL Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Real~ Services, LP Report No.: 21936? Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/27/2004: Page 5 of 5 Driller: Long Foundation Pier Identification A-3.9 A-4.5 A-5.1 A-5.6 A-6.2 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (ft) 7.60 7.80 7.60 7.70 7.60 Depth of Bearing Stratum From Surface (fl) Required Penetration (ft) Note 1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fl) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fl) 7.00 7.00 7.00 7.30 7.00 Time Drilling was Completed (am / pm) 11:52 AM 12:07 PM 1:04 PM 1:21 PM 1:35 PM Time Concrete was Placed (am / pm) 4:10 PM 4:18 PM 4:25 PM 4:38 PM 3:54 PM Depth of Pier From Top of Concrete (fl) 7.60 7.70 7.50 7.70 7.50 Elevation: Surface (fl)** 95.00 95.10 95.I0 95.00 95.10 Elevation: Top of Pier (fl)** 95.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (fl)** 87.40 87.20 87.50 87.30 87.50 Elevation: Top of Bearing Stratum (f~.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay Note: See report g219368 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. * *Elevation by others Remarks: Building XI Note 1: No penelration / piers are to be 8' or top of sand, whichever is first. ~IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no ontrol. Our le[~ers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of Rone Engineers, Ltd. Re 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, ]tort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Mr. Brian Stralcy 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Report No.: 219599 Project No.: 049245 Date of Service: 09/29/2004 Report Date: 10/06/2004 Services: Drilled Pier Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform a Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Seveices, LP (1) Extranet (1) City of Coppell (1) City of Coppell 6:30am - 6:15pm Rone Engineers, Ltd. ~. K. Scott Watson(,AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similax subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wrWten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219599 Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/29/2004 Page 2 of 6 Driller: Long Foundation ?ier Identification A-5.6 A-5.1 A-4.5 A-3.9 A-3.4 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (fl) 8.70 8.80 8.80 8.50 9.00 Depth of Bearing Stratum From Surface (fi) Required Penelration (fl) Note 1 kctual Penetration (fi)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 ///6 6 ///6 6 / #6 Length of Reinforcing Steel (fl) 8.00 8.00 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 8:27 AM 8:36 AM 8:42 AM 8:54 AM 9:05 AM Time Concrete was Placed (am / pm) l 0:15 AM 10:21 AM 10:45 AM 10:56 AM 11:00 AM Depth of Pier From Top of Concrete (fi) 8.70 8.80 8.70 8.40 9.00 Elevation: Surface (fl)* * 95.00 95.00 95.10 95.10 95.00 Elevation: Top of Pier (fi)** 95.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (fl)** 86.30 86.20 86.30 86.60 86.00 Elevation: Top of Bearing Stratum (fi.)** Note 1 Beating Stratum (description) Tan, brown and gray clay. Note: See report #219600 for Compressive Strength Test Specimens. Additional Penetration not requested unless noted. **Elevation by others Remarks: Building XI Note 1: No penetration required. Minimum depth 8.5' or top of sand, whichever is first. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no entre[ Our letters and repoffts are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd, RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219599 Project No.: 049245 ?roject: Freeport XI and XII Date of Service: 9/29/2004 Page 3 of 6 )riller: Long Foundation Pier Identification A-2.8 A-2.2 AA-1 BB-1 A-1 Pier Diameter (in) 60" 60TM 60" 60" 60" Depth of Pier From Surface (ft) 8.60 9.00 9.00 8.80 8.90 Depth of Bearing Stratum From Surface (ft) Required Penetration (ft) Note l ~cmal Penetration (fl)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry ?lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes laaing Diameter (in) / Casing Length (ft) N/A N/A N/A N/A N/A ,lumber of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fl) 8.00 8.00 7.50 6.50 8.00 Time Drilling was Completed (am / pm) 9:14 AM 9:28 AM 9:43 AM 9:56 AM 10:10 AM Time Concrete was Placed (am / pm) 11:57 AM 12:30 PM 2:06 PM 2:15 PM 12:45 PM Depth of Pier From Top of Concrete (ft) 8.60 8.90 8.00 7.00 7.90 Elevation: Surface (ft)** 95.00 95.10 94.00 94.80 94.00 Elevation: Top of Pier (ft)** 95.00 95.00 93.00 93.00 93.00 Elevation: Bottom of Pier (ft)* * 86.40 86.10 85.00 86.00 85.10 Elevation: Top of Bearing Stratum (ft.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay. Note: See report #219600 for Compressive S~-ength Test Specimens. · Additional Penetration not requested unless noted. **Elevation by others Remarks: Building XI Note 1: No penetration required. Minimum depth 8.5' or top of sand, whichever is first. .IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no ~ontrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriffen approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219599 Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/29/2004 Page 4 of 6 Driller: Long Foundation Pier Identification E.3-1 F-2.8 F-5.6 F-7.4 F-10.4 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (fi) 8.70 9.10 8.90 8.50 9.00 Depth of Bearing Stratum From Surface (fi) Required Penetration (fi) Note 1 Actual Penetration (fi)* Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) N/A N/A N/A N/A N/A slumber of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fl) 8.00 8.00 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 10:22 AM 10:35 AM 10:48 AM 11:00 AM 11:13 AM Time Concrete was Placed (am / pm) 12:00 PM 12:08 PM 2:00 PM 2:06 PM 2:18 PM Depth of Pier From Top of Concrete (fi) 8.10 9.50 8.90 8.50 8.50 Elevation: Surface (fi)** 97.60 97.60 98.00 98.00 98.50 Elevation: Top of Pier (fi)** 97.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (fi)** 88.90 88.50 89.10 89.50 89.50 :~levation: Top of Bearing Stratum (fi.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay. Note: See report #219600 for Compressive Strength Test Specimens. * Additional Penelration not requested unless noted. * *Elevation by others Remarks: Building XI Note 1: No penetration required. Minimum depth 8.5' or top of sand, whichever is first. LIMITATIONS: The test resu~s presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation ir quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219599 Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/29/2004 Page 5 of 6 Driller: Long Foundation Building XI ............................ Building XII ............. Pier Identification F- 13.2 F- 15 A- 15 F- 1 B .2-1 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (fi) 8.50 8.90 8.60 8.70 8.60 Depth of Bearing Stratum From Surface (fl) Required Penetration (fl) Note 1 Actual Penetration (fi)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fl) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fl) 8.00 8.00 8.00 7.50 8.00 Time Drilling was Completed (am / pm) 11:30 AM 11:48 AM 1:06 PM 12:27 PM 12:42 PM Time Concrete was Placed (am / pm) 2:38 PM 2:50 PM 3:20 PM 3:30 PM 3:40 PM Depth of Pier From Top of Concrete (fl) 8.50 8.40 8.60 8.20 8.60 Elevation: Surface (fi)** 98.00 98.50 7-(°'~K~.60 98.00 97.00 Elevation: Top of Pier (fi)** 98.00 98.00 96.50 98.00 97.00 Elevation: Bottom of Pier (fl)** 89.50 89.60 87.90 89.30 88.40 Elevation: Top of Bearing Stratum (ft.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay. gote: See report #219600 for Compressive S~ength Test Specimens. * Additional Pene'aation not requested unless noted. **Elevation by others Remarks: Building XI Note 1: No penetration required. Minimum depth 8.5~ or top of sand, whichever is first. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation ir quality (composition, appearance, per[ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contel Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written edproval of Rone Engineers, Ltd RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 21959~ Project No.: 049245 Project: Freeport XI and XII Date of Service: 9/29/2004 Page 6 of 6 Driller: Long Foundation Pier Identification A.5-1 A-1 A-9 AA-9 BB-9 Pier Diameter (in) 60" 60" 60" 60" 60" Depth of Pier From Surface (fl) 8.70 8.90 8.80 8.80 8.70 Depth of Bearing Stratum From Surface (ft) Required Penetration (ft) Note 1 Actual Penetration (fl)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) N/A N/A N/A N/A N/A qumber of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinfoming Steel (fi) 8.00 7.00 6.50 7.50 7.50 Time Drilling was Completed (am / pm) 1:52 PM 3:19 PM 2:19 PM 2:33 PM 2:48 PM Time Concrete was Placed (am / pm) 4:00 PM 4:20 PM 5:08 PM 5:25 PM 5:38 PM Depth of Pier From Top of Concrete (fi) 8.70 7.30 7.00 8.00 8.00 Elevation: Surface (fl)** 96.00 96.60 96.80 95.80 95.70 Elevation: Top of Pier (fl)** 96.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (fi)** 87.30 87.70 88.00 87.00 87.00 Elevation: Top of Bearing Stratum (ft.)** Note 1 Bearing Stratum (description) Tan, brown and gray clay. Note: See report #219600 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted- **Elevation by other~ Remarks: Building XII Note 1: No penetration required. Minimum depth 8.5' or top of sand, whichever is first. IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in uality (composition, appearance, per[ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no :ontrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full wfthout the wdtten ~pproval of Rone Engineers, Ltd ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport X] & XII Coppell, Texas Report No.: 219485 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Services: Drilled Pier Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform a Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Ext~anet (1) City of Coppell (1) City of Coppell 6:15am - 5:30pm Rone Engineers, Ltd. -"'-' K. Scott'Watso~, AET ~ ~ ~' CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219485 Project No.: 048245 Project: Freeport XI and XII Date of Service: 9/28/2004 Page 2 of 6 Driller: Long Foundation Pier Identification A-7.3 A-7.8 B.2-9 C-9 C.5-9 Pier Diameter (in) 60 60 60 60 60 Depth of Pier From Surface (fl) 7.80 8.30 8.10 8.80 8.80 Depth of Bearing Stratum From Surface (It) Required Penetration (fl) Note # 1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) N/A N/A N/A N/A N/A qumber of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fi) 7.30 7.50 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 8:55 AM 8:41 AM 8:30 AM 9:55 AM 9:22 AM Time Concrete was Placed (am / pm) 10:14 AM 10:03 AM 10:22 AM 11:00 AM 11:12 AM Depth of Pier From Top of Concrete (ft) 7.80 7.90 8.30 8.60 8.70 Elevation: Surface (fl)** 95.00 95.40 96.80 97.20 98.10 Elevation: Top of Pier (fl)** 95.00 95.00 97.00 97.00 98.00 Elevation: Bottom of Pier (it)** 87.20 87.10 88.70 88.40 89.30 Elevation: Top of Bearing Stratum (f~.)** Note #1 Bearing Stratum (description) Tan, brown and gray clay Note: See report #219486 for Compressive S~'ength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others Remarks: Building XII Note: Minimum pier depth 8' or top of sand whichever is first. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in :!uality (composition, appearance, perfom~ance, etc.) or any other feature of similar subject matter provided by per'sons or conditions over which we have no ontrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers. Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219485 Project No.: 048245 Project: Freeport XI and XII Date of Service: 9/28/2004 Page 3 of 6 Driller: Long Foundation Building XII .............. Building XI ............................ Pier Identification F-6.8 F-2.8 A-13.8 A-13.2 A-12.6 Pier Diameter (in) 60 60 60 60 60 Depth of Pier From Surface (fi) 8.80 9.00 9.20 9.00 8.60 Depth of Bearing Stratum From Surface (ft) Required Penetration (ft) Note #1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry >lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (fi) 8.00 8.00 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 10:13 AM 10:36 AM 10:58 AM ll:13AM 11:28 AM Time Concrete was Placed (am / pm) 11:20 AM 11:30 AM 11:40 AM 1:00 PM 1:08 PM Depth of Pier From Top of Concrete (fi) 8.80 9.00 9.20 9.00 8.60 ~,levation: Surface (ft)** 98.10 98.00 95.00 95.00 95.00 Elevation: Top of Pier (fi)** 98.00 98.00 95.00 95.00 95.00 Elevation: Bottom of Pier (ft)** 89.20 89.00 85.80 86.00 86.40 Elevation: Top of Bearing Slyatum (ft.)** Note #1 Bearing Stratum (description) Tan, brown and gray clay Note: See mpor~ //219486 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others remarks: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided t~y persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219485 Project No.: 048245 Project: Freeport XI and XII Date of Service: 9/28/2004 Page 4 of 6 )riller: Long Foundation Pier Identification A-12.1 A-11.5 A-10.9 A-10.4 A-9.8 Pier Diameter (in) 60 60 60 60 60 Depth of Pier From Surface (ft) 8.50 8.70 8.60 8.50 8.60 Depth of Bearing Stratum From Surface (fB Required Penetration (ft) Note #1 Actual Penetration (ft)* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fl) N/A N/A N/A N/A N/A Number of Bars / Reinforcing Bar Size 6 / #6 6 / #6 6 / #6 6 ///6 6 / #6 Length of Reinforcing Steel (ft) 8.00 8.00 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 12:08 PM 12:25 PM 12:37 PM 12:52 PM 1:08 PM 'ime Concrete was Placed (am / pm) 1:16 PM 1:25 PM 2:05 PM 2:17 PM 2:26 PM Depth of Pier From Top of Concrete (fl) 8.50 8.70 8.50 8.50 8.50 Elevation: Surface (fl)** 95.00 95.00 95.10 95.00 95.10 ';levation: Top of Pier (fl)** 95.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (ft)** 86.50 86.30 86.50 86.50 86.50 Elevation: Top of Bearing Stratum (ft.)** Note #1 Bearing Stratum (description) Tan, brown and gray clay Note: gee report //219496 for Compressive Strength Test Specimens. Additional Penetration not requested unless noted. **Elevation by others Remarks: Building XI IMITATIONS: The test results presented herein were prepared based upon the spec~c samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of None Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219485 Project No.: 048245 Project: Freeport XI and XII Date of Service: 9/28/2004 Page 5 of 6 )rifler: Long Foundation Pier Identification A-9.2 A-8.6 A-8 A-7.8 A-6.8 'ier Diameter (in) 60 60 60 60 60 Depth of Pier From Surface (ft) 9.00 9.10 9.10 9.10 8.40 Depth of Bearing Stratum From Surface (ft) Required Penetration (ft) Note # 1 a~ctual Penetration (f0* Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (It) N/A N/A N/A N/A N/A Number of Bars / Reinfoming Bar Size 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6 Length of Reinforcing Steel (It) 8.00 8.00 8.00 8.00 8.00 Time Drilling was Completed (am / pm) 1:20 PM 1:34 PM 1:46 PM 1:57 PM 2:12 PM Time Concrete was Placed (am / pm) 2:34 PM 2:58 PM 3:06 PM 4:20 PM 4:30 PM Depth of Pier From Top of Concrete (fl) 9.00 9.10 9.10 9.10 8.40 Elevation: Surface (ft)** 95.00 95.00 95.00 95.00 95.00 Elevation: Top of Pier (it)** 95.00 95.00 95.00 95.00 95.00 Elevation: Bottom of Pier (fi)** 86.00 85.90 85.90 85.90 86.60 Elevation: Top of Bearing Stratum (ft.)** Note #1 Bearing Stratum (description) Tan, brown and gray clay Note: See report #219486 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others [emarks: _IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in 3uality (composition, appearance, pedormance, etc.) or any other feature of similar subject matter provided by persons or conditions over wflich we have no ;ontrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written tpproval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219485 Project No.: 048245 Project: Freeport XI and XII Date of Service: 9/28/2004 Page 6 of 6 Driller: Long Foundation Pier Identification A-6.2 ?ier Diameter (in) 60 Depth of Pier From Surface (ft) 8.50 Depth of Bearing Stratum From Surface (ft) Note 1 Required Penetration (fl) Note 1 ~.ctual Penetration (ft)* Note 1 Condition of Bottom (wet / dry) Dry Plumb Within Tolerance (yes / no) Yes Casing Diameter (in) / Casing Length (fi) N/A qumber of Bars / Reinforcing Bar Size 6 / #6 Length of Reinforcing Steel (fl) 8.00 Time Drilling was Completed (am / pm) 2:25 PM Time Concrete was Placed (am / pm) 4:45 PM Depth of Pier From Top of Concrete (fi) 8.40 Elevation: Surface (fi)** 95.10 Elevation: Top of Pier (fi)** 95.00 Elevation: Bottom of Pier (fi)** 86.60 Elevation: Top of Bearing Stratum (fi.)** Note 1 Bearing Stratum (description) Tan, brown and ~ray clay Note: See report //219486 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. **Elevation by others Remarks: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no ;ontrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd, ineers 8908 Ambassador Row, Dallas, TX 75247 / 2696 Gravel Drive, Fort Worth, TX 76118 118~ 6300 Rothway, Ste. 15o, Houston, TX 7?~ddl CorporatePhone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Freeport XI & XII Coppell, Texas Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA Report No.: 217772 Project No.: 049245 Date of Service: 09/07/2004 Report Date: 10/06/2004 CONTRACTOR: Duke Construction Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Gauge: Troxler 3430 Moisture Density Gauge Serial No: 35558 Current: 611 Current: 2507 Test Mode: DT Previous: 612 Previous: 2517 M/D No. 1 2 Description MOISTURE DENSITY RELATIONS Maximum Brown Silty Sandy Clay Tan & Brown Silty Sand w/Trace Clay Project Requirements Moisture % DensiW pcf Moisture DensiW 20.0 103.0 Optimum +4 95 min 12.0 110.0 Optimum +4 95 min FIELD DENSITY TESTS TEST NO 1 2 3 4 PROBE ~ TEST LOCATION DEPTH No. Utility backfill 8" storm sewer, Station 00+60, 3' below subgrade Utility backfill 8" storm sewer, Station 00+60, 2' below subgrade Utility backfill (%) (pcf) (pc0 6" 1 21.6 121.1 /~ 6" 1 20.8 124.4 MOISTURE WET DENSITY DRY DENSITY l' 8" storm sewer, Station 00+60, 1' below 6" 1 24.0 subgrade Utility backfill 8" storm sewer, Station 00+60, final 6" 1 22.6 son this report meet project specification. 128.1 124.7 3.3 DENSITY (% max) 97 100 100 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subjec~ mailer provided by persons or conditions over which we have no control Our leners and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the wriiten approval of Rone Engineers, Ltd 07SS Page I of 2 Technician: Ken Brimingham Report Distribution: (1) Duke Realty Sen, ices, LP (1) Ex~mmt (1) City of Coppell (1) City of Coppell Started: l:45pm Finished: 4:00pm CMT Operations Manager ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Duke Realty Services, LP My. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 218203 Project No.: 049245 Date of Service: 09/13/2004 Report Date: 10/06/2004 PROJECT DATA CONTRACTOR: Duke Construction Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Gauge: Troxler 3430 Moisture Density Gauge Serial No: 35518 Current: NA Current: NA Test Mode: DT Previous: 706 Previous: 2689 MOISTURE DENSITY RELATIONS Maximum No. Description Moisture % Density pcf Lime Treated Dark Brown Clay 27.5 89.0 Optimum +4 95 rain Project Requirements Moisture Density FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH No. (%) M/n MOISTURE WET DENS1TY DRY DENSITY DENSITY (pc~ (pc~ (%max) Building pad 6" 86.5 97 1 Lines 7/A.9 1 28.7 111.3 Building pad 6" 87.3 98 2 Lines 4.5/A.9 I 27.5 111.3 Building pad 6" 1 30.2 110.3 84.7 95 3 Lines 2/A.9 Building pad 6" 95 4 Lines 7/C.5 1 30.3 110.4 84.7 Building pad 6" 86.0 97 5 Lines 4.5/C.5 1 28.6 110.6 Building pad 6" I 29.1 110.5 85.6 96 6 Lines 2/C.5 Building pad 6" 95 7 Lines 7/E.1 I 30.0 110.2 84.8 Building pad LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maaer provided by persons or conditions over which we have no control. Out letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Pape I of 2 Report No.: 218203 Project No.: 049245 Client: Duke Realty Services, LP TEST NO 8 Lines 4.5/E. 1 Building pad 9 Lines 2/E. 1 TEST LOCATION Technician: Joe Jemigan Report Distribution: (1) Duke Realty Services, LP (1) Extranet (1) City of Coppell (1) City of Coppell PROBE DEPTH M~D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcf) (pc0 (% max) 6" 1 29.1 110.9 85.9 97 6" 1 30.1 Test results on this report meet project specification. 110.6 85.O 96 Finished: 1 l:30a CMT Operations Manager Started: 9:30am LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fi~ll without the written approval of Rone Engineers, Ltd Pa~e 2 of 2 Client: ineers Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste, 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Freeport XI & XII Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: CONCRETE SUPPLIER: PLANT: Duke Construction Southern Star 27 MEASURED MIX DESIGN I.D.: 9349 SLUMP eLACEMENI DATE: 09/28/2004 (inches) WEATHER CO~ITIONS: Calm/Clear 5.5 TIME SAMPLED: 4:40am BATCHTIME: 4:30am SPECIFICATION REQUIREMENTS STHENGTH: 4000 psi ~ 28 Days SLUMP (in): 6" Maximum Am (%): NA TEST METHOD: ASTM C- 172 ASTM C-31 ASTM C~143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 ex.pt 9 I 2 TEMPERATURE (F) - AIR 68 F CONCRETE: 84 TRUCK NO: 823 TICKET NO: 362787 AIRCONTENT(%): NA UNIT WEIGHT (peJ): NA OVERALL PLACEMENT LOCATION: Overall placemem A to D at 1-9, Building 12 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 7.8 at A.3 CYLINDER MARKED DATE SET NO. TESTED 1 1 10/05/2004 1 2 10/26/2004 1 3 10/26/2004 MAXIMUM AGE DIAMETER AREA LOAD (days) (inches) (sq.in.) (lbs. force) 7 6.00 28.26 28 0.00 0.00 28 0.00 0.00 1 4 Hold Water added at site: 10 gallons COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 133430 4720 Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject maaer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the w.~en approval of Rone Engineers, Ltd. Page 1 of 8 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Services: Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-23 l ASTM C- 1064 ASTM C-1231 ASTM C-39 except 9 I 2 MIX DESIGN I.D.: 9349 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Calm/Clear TIME SAMPLED: 5:45am BATCHTIME: 5:18affl TEMPERATURE (F) - AIR 68 F CONCRETE: 84 F TRUCK NO: 015 TlCK~T NO: 362797 AIR CONTENT (%): NA UNITWE1GHT(pci): NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 6.7 at B.2 SLUMP (inches) 5.0 MAXIMUM COMPRESSIVE CYLINDER FRACTURE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 2 1 10/05/2004 7 6.00 28.26 136970 4840 Unbonded Cap 2 2 10/26/2004 28 0.00 0.00 Unbonded Cap 2 3 10/26/2004 28 0.00 0.00 Unbonded Cap 2 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject mailer provided by persons or conditions over which we have no control. Our leRers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01HG Page 2 of 8 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 650-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Freeport X1 & XII Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-23 ! ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEMENT DATE: 09/2 8/2004 WEATHER CONDITIONS: Calm/Clear TIME SAMPLED: 6:30am BATCH TIME: 6:] 0am TEMPERATURE (F) - AIR 69 E CONCRETE: 84 F TRUC~:NO: 640 T1C}C~TNO: 362807 AIR CONTENT (%): NA UNITWEIGHT(pcD: NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 MEASURED SLUM1~ (inches) 6.0 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 6.1 atB.9 MAXIMUM COMPRESSIVE CYLINDER STRENGTH FRACTURE MARKED DATE AGE DIAMETER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 3 I 10/05/2004 7 6.00 28.26 134290 4750 Unbonded Cap 3 2 10/26/2004 28 0.00 0.00 Unbonded Cap 3 3 10/26/2004 28 0.00 0.00 Unbonded Cap 3 4 Hold Water added at site: 10 gallons e ented herein were ret~ared based upon the spec tic samples provided for testing· We assume no responsibility for variation in quality LIW[ITATIONS: The test results pr s P ~ · ' ' over which we have no conlxol. Our letters and · erformance etc or an other feature of s~m0ar subject matter prowded by persons.or conditions - , ~-n - '* ~eo-~ Ltd (composition, appearance, p ~ - ' , ).. ~L -- .u-x~ ~r~ arlttr~qq~d and not be rel~roduced exce t m fu without the written approvm oat%one ~ngn, ~,~, Page 3 of 8 Ro gineers Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport X1 & XI1 Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back ID the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: SouthelTl Star pLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA M~X DESIGN i.D.: 9349 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Calm/Clear TIME SAMPLED: 7:30am BATCHTIME: 7:00am TEMPERATURE (F) - AIR 71 F CONCRETE: 75 F T~UCK NO: NA TICKET NO: 362817 AIR CONTENT (%): NA UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 MEASURED SLUMP (inches) 5.75 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 5.6 at C.2 MAXIMUM COMPRESSIVE CYLINDER LOAD STRENGTH FRACTURE MARKED DATE AGE DIL~METER AREA SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 4 I 10/05/2004 7 6.00 28.26 137810 4870 Unbonded Cap Unbonded Cap 4 2 10/26/2004 28 0.00 0.00 Unbonded Cap 4 3 10/26/2004 28 0.00 0.00 4 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Pa£e 4 of 8 Ro gineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport XI & XII Coppell, Texas Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-1231 ASTM C-39 except 9 I 2 PROJECT DATA Mrx DESlG?~ 1.D.: 9349 FLAC£MENT DnTE: 09/28/2004 WEATHER CONDITIONS: Sunny TIME SAMPLED: 8:30am BATCHTIME: 8:00alii TEMPERATURE (F)-AIR 85 F CONCRETE: 84 F TRUCK NO: 8 TICKET NO: 362828 AIR CONTENT (%): NA UNIT WEIGHT (pci): NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 4.7 at C.9 MEASURED SLEMP (inches) 6.0 MAXIMUM COMPRESSIVE CYLENDER STRENGTH FRACTURE NLS. RKED DATE AGE DL%METER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 5 1 10/05/2004 7 6.00 28.26 129030 4560 Unbonded Cap 5 2 10/26/2004 28 0.00 0.00 Unbonded Cap 5 3 10/26/2004 28 0.00 0.00 Unbonded Cap 5 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (compoaltion, appearance, performance, etc ) or any other feature of similar subject mallet provided by persons or conditions over which we have no control. Our le~ers and reports are for the exclusive use of the clients to whom they a~e addressed and shall not be reproduced except in full without the wrinen approval of Rone Engineers, Ltd. Page 5 of 8 RoneEn g Client: 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport XI & XII Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: SoutherI1 Star eLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9:15am BATCHTIME: NA TEMPERATURE (F) - AIR 85 F CONCRETE: 84 E TRUCK NO: 1020 TICKET NO: 362838 AIRCONTENT(%): NA UNITWEIGHT(pcf): NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 MEASURED SLUMP (inches) 7.0 SAMPLE LOCATION: REPORT OF TESTS · ' ' x 12" Concrete Compressive Cyl rider 6 3.4 at A.2 MAXIMUM COMPRESSIVE CYLINDER STRENGTH FRACTURE MARKED DATE AGE DIAMETER AREA LOAD SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 6 1 10/05/2004 7 6.00 28.26 134180 4750 Unbonded Cap 6 2 10/26/2004 28 0.00 0.00 Unbonded Cap 6 3 10/26/2004 28 0.00 0.00 Unbonded Cap 6 4 Hold Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We ~ssume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriiten approval of Rone Engineers, Ltd. a~.c Page 6 of 8 Rc ,ers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6500 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport XI & XII Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AI~ (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 10:30am BATCHTIME: 9:50alTl TEMPERATURE (F} - AIR 77 v CONCRETE: 81 E TRUC~:NO: NA TICKETNO: 862850 AIR CONTENT (%): NA t~rr WEIGHT (pcf}: NA OVERALL PLACEMENT LOCAIION: Overall placement A to D at 1-9, Building 12 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 2.5~C.5 MEASURED SLUMP (inches) 6.0 MAXIMUM COMPRESSIVE CYLINDER LOAD STRENGTH FRACTURE MARKED DATE AGE DIAMETER AREA SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 7 6.00 28.26 138990 4920 Unbonded Cap 7 1 10/05/2004 7 2 10/26/2004 28 0.00 0.00 Unbonded Cap 7 3 10/26/2004 28 0.00 0.00 Unbonded Cap 7 4 Hold Water added at site: 10 gallons LLMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality eamre of similar subiect matter provided by persons or conditions over which we have no control, Our letters and ~com,,osition annearance, performance, etc ) or any other f - -J .... ~--~-~ .....* ~ f~ll w thout the written approval of Rone Engineers, Ltd. ~ rep~ are ~t~ e exclusive use of the clients to whom they are addressea Cna snan not ~e reprouuc.u ~},[ ,- Page 7 of 8 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 219492 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport XI & XII Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 6" Maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 PROJECT DATA MIX DESIGN LD.: 9349 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: lh25am BATCHTIME: lh05am TEMPERATURE (F)-AIR 77 F CONCRETE: 82 F TRUCKNO: 823 TICKETNO: 362861 AIR CONTENT {%): NA UN1TWEIGHT(pc0: NA OVERALL PLACEMENT LOCATION: Overall placement A to D at 1-9, Building 12 MEASURED SLUMP (inches) 5.75 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" 1.6mB.7 CYLINDER MARKED DATE AGE SET NO. TESTED (days) 8 1 10/05/2004 7 8 2 10/26/2004 28 8 3 10/26/2004 28 DIAMETER AREA (inches) (sq.in.) 6.00 28.26 0.00 0.00 0.00 0.00 MAXIMUWI COMPRESSIVE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE 145510 5150 Unbonded Cap Unbonded Cap Unbonded Cap 8 4 Hold Water added at site: 10 gallons Technician: ScoR Mitchell Report Distribution: (1) Duke Realty Services, LP ( 1 ) Extranet (1) City of Coppell (1) City of Coppell Started: 3:30am Finished: 12:30pm CMT Operations Manager LIMITATIONS: The test resulLs presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject ma~er provided by persons or conditions over which we have no conlxol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Page 8 of 8 ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Forl Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214} 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 219486 Project No.: 049245 Date of Service: 09/28/2004 Report Date: 10/06/2004 Project: Services: Freeport XI & XII Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southerll Star PL~T: 27 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" - 7" NA ASTM C-172 ASTM C-31 ASTM O143 ASTM C-231 ASTM C- 1064 ASTM C-1231 ASTM C-39 except 9 ] 2 MIX DESIGN I.D.: 9337 PLACEMENT DATE: 09/28/2004 WEATHER CONDITIONS: Cloudy TIME SAMPLED: h20pm BATCHTIME: 12:40pm TEMPERATURE (F) - AIR 78 F CONCRETE: 77 g TRUC~: NO: 1020 TICKET NO: 362879 AIR CONTENT (%): NA UNIT WEIGHT (pc0: NA OVERALL pLACEMENT LOCATION: Piers: See report #219485 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" A-I2.1/A-11.5, Building 11 SLUMP (inches) 5.0 MAXIMUM COMPRESSIVE CYLINDER MARKED DATE AGE DE, METER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/05/2004 7 6.00 28.26 102730 3630 Unbonded Cap 1 2 10/26/2004 28 0.00 0.00 Unbonded Cap 1 3 10/26/2004 28 0.00 0.00 Unbonded Cap 1 4 Hold See report %219485 for technician time. Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject manet provided by persons or conditions over which we have no control. Our leners and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the ~aa5 iten approval of Rone Engineers, Ltd. n~c. Page I ofl Technician: Rick Smith Report Distribution: (1) Duke Real~y Services, LP (l) Extranet (1) Cit~ of Coppell ( 1 ) City of Coppell Started: Finished: K. Scott Watson, AET CMT Operations Manager