Freeport NIP(8.0)-LR041001Client:
lineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Services:
Report No.: 219092
Project No.: 049245
Date of Service: 09/23/2004
Report Date: 10/01/2004
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
MEASURED
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
5" - 7"
NA
ASTM C-172
ASTM C-31
ASTM C- 143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
except 9 1 2
MIX DESIGN I.D.: 9337
PLACEMENT DATE: 09/23/2004
WEATHER CONDITIONS: Cloudy
T1MESAMPLED: 1:15pm BATCHTIME: NA
TEMPERATURE (F)-AIR 84 F CONCRETE: 87 F
TRUCK NO: 8 T1CKET NO: 362677
AIR CONTENT (%): NA UNITWEIGHT(pcg): NA
OVERALL PLACEMENT LOCATION:
Piers, see report g219091
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
F-1.5/F-1/D5-1/C.8-1
SLUMP
(inches)
5.5
MAXIMUM COMPRESSIVE
CYLINDER
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 09/30/2004 7 6.00 28.26 92480 3270 Unbonded Cap
1 2 10/21/2004 28 0.00 0.00 Unbonded Cap
1 3 10/21/2004 28 0.00 0.00 Unbonded Cap
1 4 Hold
See report 9219091 for technician time.
Water added at site: 10 gallons
LIMITATIONS: The test resulls presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in qualiW
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the wriaen approval of Rone Engineers, Ltd.
OlHG Page 1 of 1
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(I) Extranet
(1) City of Coppell
(I) City of Coppell
Started:
Finished:
CMT Operations Manager
RoneEngineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
My. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport X1 & XII
Coppell, Texas
Report No.: 218843
Project No.: 049245
Date of Service: 09/21/2004
Report Date: 10/01/2004
Services: Drilled Pier Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform a Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 11
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
( 1 ) Exlxanet
(1) City of Coppell
(1) City of Coppell
6:30am - 6:45pm
K ~cott ~at"~on, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared ba~ed upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality
corn osition earance erformance, ete ) or any other feature of similar subject maVter provided by persons or conditions over which we have no control. Our le~ers and
( p ¢ ap? , '.P ~. ,- ' ...- ...u--- ou-, ~-e addressed and shall not be ret,roduced except in full without the wriiten approval of Rone Engineers, Ltd.
99Thq Pa£e 1 of I
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Report No.: 218843
Client: Duke Realty Services, LP Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 2 of 11
Driller: Long Foundation
Pier Identification C-1 C.7-1 D.5-1 F-1.5 F-2.2
?ier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 60" 60" 60" 60" 60"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.40 12.10 11.90 11.00 12.00
Depth of Pier After Underreaming (ft)* 13.00 12.40 11.90 11.00 12.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Slumber of Bars / Reinforcing Bar Size (#) 6 / #6 6 ///6 6 ///6 6 ///6 6 / #6
Length of Reinforcing Steel (ft) 11.5 12.0 11.5 10.0 11.3
Time Drilling was Completed (am / pm) 8:09 AM 8:24 AM 8:45 AM 8:56 AM 9:11 AM
rime Concrete was Placed (am / pm) 12:28 PM 12:34 PM 12:39 PM 12:46 PM 1:00 PM
Depth of Pier From Top of Concrete (ft) 12.00 12.40 11.90 10.50 11.80
Elevation: Surface (fi)** 98.00 98.00 98.00 98.50 98.30
Elevation: Top of Pier (ft)** 97.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (fi)** 85.00 85.60 86.10 87.50 86.20
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation, Building XII.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
Our letters and reporfs are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full w~thout the written approval of
Rone Engineers, Ltd
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
.Project: Freeport XI & XII Date of Service: 9/21/2004
Page 3 of 11
Driller: Long Foundation
Pier Identification F-3.3 F-3.9 F-4.5 F-5.1 F-5.6
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 60" 60" 60" 60" 60"
Required Minimum Depth (it) Note 1 Note I Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 11.90 11.50 10.00 9.90 11.50
Depth of Pier After Underreaming (it)* 12.20 12.00 10.10 10.00 11.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinfoming Steel (It) 11.8 11.4 9.5 9.4 10.7
Time Drilling was Completed (am / pm) 9:50 AM 10:04 AM 10:18 AM 10:35 AM 10:45 AM
Time Concrete was Placed (am / pm) 1:06 PM 1:13 PM 1:20 PM 2:00 PM 2:04 PM
Depth of Pier From Top of Concrete (fl) 12.20 11.80 9.90 9.80 11.20
iElevation: Surface (It)** 98.00 98.20 98.20 98.20 98.30
Elevation: Top of Pier (It)** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (It)** 85.80 86.20 88.10 88.20 86.80
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Building
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
Our letters and reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in foil without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 4 of 11
)riller: Long Foundation
Pier Identification F-6.2 E5-7.1 E-7.5 D.5-7.8 D-8.1
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 60" 60" 60" 60" 60"
Required Minimum Depth (It) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 11.80 11.70 11.80 11.00 12.30
Depth of Pier After Underreaming (it)* 12.50 12.00 12.00 11.10 12.40
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
4umber of Bars / Reinforcing Bar Size (#) 6 / I/6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (it) 11.8 11.0 11.2 10.4 11.5
['ime Drilling was Completed (am / pm) 11:15 AM 11:49 AM 11:56 AM 12:10 PM 1:00 PM
Time Concrete was Placed (am / pm) 2:10 PM 2:14 PM 3:00 PM 3:05 PM 3:11 PM
Depth of Pier From Top of Concrete (it) 12.30 11.60 11.70 10.70 12.00
Elevation: Surface (It)** 98.20 98.40 98.30 98.40 98.40
Elevation: Top of Pier (It)** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (it)** 85.70 86.40 86.30 87.30 86.00
Bearing Slratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Building XII
_IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
:3ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 5 of 11
Driller: Long Foundation
Pier Identification A.5-9
Pier Diameter (in) 24"
Bell Diameter (in) 60"
Required Minimum Depth (ft) Note 1
Depth of Pier Prior to Underreaming (f~) 8.00
Depth of Pier After Underreamlng (ft)* 8.60
Condition of Bottom (wet / dry) Dry
Plumb Within Tolerance (yes / no) Yes
Casing Diameter (in) / Casing Length (It) NA
qumber of Bars / Reinfoming Bar Size (#) 6 / #6
Length of Reinforcing Steel (ft) 8.0
Time Drilling was Completed (am / pm) 12:48 PM
Time Concrete was Placed (am / pm) 3:20 PM
Depth of Pier From Top of Concrete (ft) 8.20
Elevation: Surface (ft)** 96.40
Elevation: Top of Pier (ft)** 96.00
Elevation: Bottom of Pier (fl)** 87.80
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Spemmens.
Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks:
.IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc,) or any other feature of similar subject matter provided by parsons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 6 of 11
Driller: Long Foundation
Pier Identification D-14 D-13 D-12 D-11 D-10
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (l°t) 14.00 12.70 12.70 13.40 12.50
Depth of Pier After Underreaming (ft)* 14.80 12.80 13.00 13.40 12.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 14.2 12.3 12.3 12.8 11.8
Time Drilling was Completed (am / pm) 10:33 AM 10:46 AM 10:57 AM 11:35 AM 11:49 AM
Time Concrete was Placed (am / pm) 12:40 PM 12:46 PM 12:52 PM 1:00 PM 1:19 PM
Depth of Pier From Top of Concrete (ft) 14.60 12.70 12.80 13.20 12.30
Elevation: Surface (ft)** 99.53 99.43 99.53 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 84.73 86.63 86.53 86.13 87.03
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless note& ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for tes§ng. We assume no responsibility for variation in
uality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
)ur letters and reper[s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Real~y Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 7 of 11
Driller: Long Foundation
Pier Identification D-9 D-8 D-7 D-6 D-5
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note I Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.50 12.40 12.40 10.50 13.00
Depth of Pier After Underreaming (fi)* 12.60 12.60 12.60 10.50 13.00
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (fi) 12.0 12.0 11.8 10.0 12.3
I'ime Drilling was Completed (am / pm) 12:00 PM 12:13 PM 2:18 PM 2:31 PM 2:41 PM
Time Concrete was Placed (am / pm) 1:24 PM 4:10 PM 4:14 PM 4:19 PM 4:24 PM
Depth of Pier From Top of Concrete (fi) 12.40 12.40 12.30 10.30 12.80
Elevation: Surface (It)** 99.53 99.53 99.63 99.53 99.53
Elevation: Top of Pier (fi)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (fi)** 86.93 86.93 87.03 89.03 86.53
Bearing Stratum (description) Tan, brown and gray clay
4otc: See Report 33 218844 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
~,emarks: Building XI
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
Client:
Project:
Duke Realty Services, LP
Freeport XI & XII
Long Foundation
Pier Identification
'ier Diameter (in)
Diameter (in)
uired Minimum ~
of Pier Prior to Underreaming
of Pier After
Condition of Bottom (wet / dry)
, Within Tolerance (yes / no)
Diameter (in)
r of Bars / Reinforcing.__B_Bar Size (#)
~f Reinforcing Steel (ft)
Time Drilling was
: Concrete was Placed (am
of Pier From Top of Concrete (ft)
Surface (fl)**
,p of Pier (ft)**
t: Bottom of Pier (ft)__**
Stratum
See Report # 218844
* Additional Penetration not requested unless noted·
Building XI
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Report No.: 218843
Project No.: 049245
Date of Service: 9/21/2004
Page 8 of 11
D-4 D-3 D-2 E-14 E-13
24" 24" 24" 24" 24"
48" 48" 48" 48" 48"
Note 1 Note 1 Note 1 Note 1 Note 1
13.20 13.10 13.20 12.70 12.50
13.40 13.20 13.30 12.70 12.50
Dry Dry Dry Dry
Yes Yes Yes Yes Yes
NA NA NA NA NA
6/#6 6/#6 6/#6 6/#6 6/#6
12.8 12.4 12.5 12.0 11.6
2:50 PM 2:54 PM 3:00 PM 1:36 PM 1:48 PM
4:33 PM 4:33 PM 4:50 PM 4:55 PM 5:00 PM
13.20 12.90 13.10 12.50 12.20
99.53 99.63 99.53 99.53 99.63
99.33 99.33 99.33 99.33 99.33
86.13 86.43 86.23 86.83 87.13
Tan, brown and
for Compressive SU'ength Test Specimens.
** Elevation by Others.
· ased u n the specific samp es provided for testing· We assume no responsibility for variation in
The test results presented here~n were prepared b po . . . er rovided b persons or conditions ever wh'ch we have no control
· ' arance fformance, etc.) or any other feature of s~m~iar subject matt - p., -- Y --~-~ ..... ~ ~ ~,11 without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Report No.: 218843
Client: Duke Realty Services, LP Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 9 of I1
Driller: Long Foundation
Pier Identification E- 12 E- 11 E- 10 E-9
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.30 12.70 13.00 12.70 12.70
Depth of Pier After Underreaming (fl)* 12.40 12.70 13.00 12.70 12.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (fl) 11.7 12.0 12.4 12.0 12.0
Time Drilling was Completed (am / pm) 2:09 PM 2:20 PM 2:30 PM 2:30 PM 2:40 PM
Time Concrete was Placed (am / Pm) 5:04 PM 5:07 PM 5:11 PM 5:15 PM 5:20 PM
Depth of Pier From Top of Concrete (fi) 12.20 12.50 12.80 12.50 12.60
Elevation: Surface (ft)** 99.53 99.53 99.53 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 87.13 86.83 86.53 86.83 86.73
Tan, brown and gray clay
Bear~g Stratum (descri tion) for Compressive Strength Test Specimens.
Note: See RepoI~ # 218844
Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
Our letters and repor[s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in foil without the wdtten approval of
~one Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
.Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page 10 ofll
Driller: Long Foundation
Pier Identification E-7 E-6 E-5 E4 E-3
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (it) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (It) 12.90 13.00 13.00 12.60 12.90
Depth of Pier After Underreaming (it)* 12.90 13.00 13.00 13.00 12.90
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (fi) 12.0 12.3 12.3 12.4 12.2
Time Drilling was Completed (am / pm) 2:48 PM 3:00 PM 3:20 PM 3:30 PM 3:33 PM
Time Concrete was Placed (am / pm) 5:25-m 5:30 PM 5:53 PM 5:56 PM 6:00 PM
Depth of Pier From Top of Concrete (fl) 12.60 12.80 12.80 12.80 12.70
Elevation: Surface (it)** 99.63 99.53 99.53 99.53 99.53
Elevation: Top of Pier (it)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (it)** 86.73 86.53 86.53 86.53 86.63
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
Additional Penelration not requested unless noted. ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218843
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/21/2004
Page I1 ofll
Driller: Long Foundation
Pier Identification E-2
?ier Diameter (in) 24"
Bell Diameter (in) 48"
Required i~inimum Depth (ft) Note 1
Depth of Pier Prior to Underreaming (ft) 12.70
'Depth of Pier Aiter Underreaming (fl)* 12.70
Condition of Bottom (wet / dry) Dry
Plumb Within Tolerance (yes / no) Yes
Casing Diameter (in) / Casing Length (it) NA
qumber of Bars / Reinforcing Bar Size (#) 6 / #6
Length of Reinforcing Steel (it) 12.0
Time Drilling was Completed (am / pm) 3:45 PM
Time Concrete was Placed (am / pm) 6:10 PM
Depth of Pier From Top of Concrete (ft) 12.50
Elevation: Surface (it)** 99.53
Elevation: Top of Pier (it)** 99.33
Elevation: Bottom of Pier (it)** 86.83
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report # 218844 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
R_emarks: Building XI
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. I
Our letters and reporis are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rotbway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
Report No.: 218755
Project No.: 049245
Date of Service: 09/20/2004
Report Date: 10/01/2004
Services: Drilled Pier Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform a Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 7
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(l) Extranet
(1) City of Coppell
(1) City of Coppell
8:00am - 5:00pm
C Scott Watson, AET
CMT Operations Manager
LIF~TAT1ONS: TJae test results presented herein were prepased based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, ete) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fidl without the written approval of Rone Engineers, Ltd.
Paee I of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
;lient: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/20/2004
Page 2 of 7
Driller: Long Drilling
Pier Identification E-2 E-3 E-4 E-5 E-6
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note I Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 14.40 15.00 12.00 13.00 11.00
Depth of Pier After Underreaming (ft)* 14.60 15.40 12.00 13.00 11.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
,lumber of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (t~) 13.7 14.6 11.4 12.4 10.6
Time Drilling was Completed (am / pm) 9:45 AM 10:00 AM 10:15 AM 10:24 AM 11:00 AM
Time Concrete was Placed (am / pm) 1I:13 PM II:ISAM 11:22 AM 11:29 AM 2:00 PM
Depth of Pier From Top of Concrete (ft) 14.30 15.20 11.80 12.80 l 1.10
Elevation: Surface (fl)** 99.63 99.53 99.53 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (fl)** 85.03 84.13 87.53 86.53 88.23
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218756 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/20/2004
Page 3 of 7
Driller: Long Drilling
Pier Identification E-7 D-2 D-3 D-4 D-5
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (fl) 12.30 15.00 14.80 13.00 13.50
Depth of Pier After Underreaming (ft)* 12.30 16.00 15.20 13.70 13.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 11.5 15.3 14.5 13.0 12.8
Time Drilling was Completed (am / pm) 10:46 AM 12:55 PM 12:45 PM 12:34 PM 12:15 PM
Time Concrete was Placed (am / pm) 2:04 PM 2:25 PM 2:20 PM 2:10 PM 2:10 PM
Depth of Pier From Top of Concrete (ft) 12.00 15.70 14.90 13.50 13.30
Elevation: Surface (fl)** 99.63 99.63 99.63 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 87.33 83.63 84.43 85.83 86.03
Beating Stratum (description) Tan, brown and gray clay
Note: See Report #218756 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. * * Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specitic samples provided for testing We assume no responsibility for variation in
uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
)ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & X[1 Date of Service: 9/20/2004
Page 4 of 7
Driller: Long Drilling
Pier Identification D-6 D-7 C-2 C-3 C-4
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note I Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 13.00 12.10 15.00 15.00 14.20
Depth of Pier After Underreaming (ft)* 13.10 12.10 15.50 15.70 15.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry D~y
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 ///6
Length of Reinforcing Steel (ft) 12.4 11.4 14.7 15.0 14.8
Time Drilling was Completed (am / pm) 12:00 PM 10:35 AM 1:18 PM 1:30 PM 1:56 PM
Time Concrete was Placed (am / pm) 2:04 PM 2:00 PM 4:08 PM 4:12 PM 4:16 PM
Depth of Pier From Top of Concrete (fi) 12.90 11.90 15.20 15.40 15.30
Elevation: Surface (ft)** 99.53 99.53 99.63 99.63 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (fi)* * 86.43 87.43 84.13 83.93 84.03
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218756 for Compressive Strength Test Specimens.
Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc) or any other feature of similar subject mat/er provided by persons or conditions over which we have no control.
Our letters and reper~s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/20/2004
Page 5 of 7
Driller: Long Drilling
Pier Identification C-5 C-6 C-7 C-8 B-2
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 14.00 13.00 13.60 14.30 11.00
Depth of Pier After Underreaming (ft)* 14.20 13.10 13.60 14.40 11.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
>lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fl) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / 4/6 6 / #6 6 / #6 6 / #6 6 ///6
Length of Reinforcing Steel (ft) 13.3 12.5 13.0 13.8 10.5
Time Drilling was Completed (am / pm) 2:07 PM 2:13 PM 9:35 AM 2:22 PM 11:47 AM
Time Concrete was Placed (am / pm) 4:16 PM 4:11 PM 3:54 PM 4:00 PM 2:30 PM
Depth of Pier From Top of Concrete (ft) 13.90 12.90 13.40 14.20 11.00
.Elevation: Surface (ft)** 99.63 99.53 99.53 99.53 99.63
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 85.43 86.43 85.93 85.13 88.33
Bearing Stratum (description) Tan, brown and gray clay
qote: See Report #218756 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control
3ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
~one Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/20/2004
Page 6 of 7
Driller: Long Drilling
Pier Identification B-3 B-4 B-5 B-6 B-7
~ier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (it) Note i Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (it) 13.60 13.80 13.00 13.30 14.80
Depth of Pier Aiter Underreaming (it)* 13.70 14.00 13.30 13.60 14.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fl) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (it) 13.0 13.2 12.5 13.0 14.2
Time Drilling was Completed (am / pm) 12:10 PM 1:40 PM 1:54 PM 2:03 PM 2:15 PM
Time Concrete was Placed (am / pm) 2:54 PM 3:20 PM 3:07 PM 3:12 PM 3:28 PM
Depth of Pier From Top of Concrete (fi) 13.50 13.80 13.00 13.40 14.60
Elevation: Surface (fl)** 99.53 99.53 99.63 99.53 99.53
Elevation: Top of Pier (fl)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (it)** 85.83 85.53 86.33 85.93 84.73
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218756 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218755
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/20/2004
Page 7 of 7
)riller: Long Drilling
~ier Identification B-8
Pier Diameter (in) 24"
Bell Diameter (in) 48"
Required Minimum Depth (fl) Note 1
Depth of Pier Prior to Underreaming (ft) 13.20
Depth of Pier After Underreaming (fl)* 13.20
Condition of Bottom (wet / dry) Dry
Plumb Within Tolerance (yes / no) Yes
Casing Diameter (in) / Casing Length (fl) NA
~umber of Bars / Reinforcing Bar Size (#) 6 / #6
Length of Reinforcing Steel (ft) 12.4
Time Drilling was Completed (am / pm) 2:32 PM
rime Concrete was Placed (am / pm) 4:20 PM
Depth of Pier From Top of Concrete (fl) 12.89
Elevation: Surface (ft)** 99.63
Elevation: Top of Pier (fl)* * 99.33
Elevation: Bottom of Pier (fl)** 86.43
Bearing Stratum (description) Tan, brown and gray clay
qote: See Report #218756 for Compressive Strength Test Specimens.
· Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, pen~ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
:}ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
~one Engineers, Ltd.
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: {214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Mr. Brian St~aley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XI1
Coppell, Texas
Report No.: 218972
Project No.: 049245
Date of Service: 09/22/2004
Report Date: 10/01/2004
Services: Drilled Pier Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform a Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 10
Technician: Kick Smith
Report Distribution:
(I) Duke Real~ Services, LP
(1) Extranet
(1) Cit~ of Coppell
(1) Cit~ o£Coppell
6:30am - 5:30pm
Rone Engineers, Ltd.
../~.. K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibiliW for variation in qualit~
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our le~ers and
repom~ are for the exclusive use of the cIients to whom they are addressed mad shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
Pa~e 1 of I
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 2 of 10
Driller: Long Foundation
Pier Identification E.9-1.6 E.9-2.1 D-8-7.5 D-5-7.6 A.4-1.2
Pier Diameter (in) 12" 12" 12" 12" 12"
~ell Diameter (in) 24" 24" 24" 24" 36"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 13.00 12.30 12.70 12.80 12.70
Depth of Pier After Underreaming (fl.)* 13.40 12.70 13.10 13.00 13.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 4 / #5 4 / #5 4 / #5 4 / #5 4 / #5
Length of Reinforcing Steel (ft) 11.4 10.5 11.0 10.6 12.4
rime Drilling was Completed (am / pm) 12:41 PM 8:24 AM 8:45 AM 8:56 AM 9:11 AM
Time Concrete was Placed (am / pm) 1:48 PM 12:34 PM 12:39 PM 12:46 PM 1:00 PM
Depth of Pier From Top of Concrete (ft) 11.80 11.00 11.40 11.20 12.90
Elevation: Surface (ft)** 99.60 99.70 99.70 99.80 99.53
Elevation: Top of Pier (fl.)** 98.00 98.00 98.00 98.00 99.33
Elevation: Bottom of Pier (ft)** 86.20 87.00 86.60 86.80 86.43
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. * * Elevation by Others.
Remarks: Note 1: No minimum depth due to variable sand elevation, Building XII.
LIMITATIONS: The test results presented herein were prepared based upon the sPe~fic samples provided for testing. We assume no responsibility for variation in
r ubectmatter rovlded by persons or cond~tions over wh'ch we have no c°ntr°l
quality (composition, appearance, performance, etc.) or any other feature of simile s j P ' '
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 3 of 10
Driller: Long Foundation
Pier Identification C-2 C-3 C-4 C-5 C-6
?ier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.40 12.10 12.70 12.40 12.30
Depth of Pier After Underreaming (ft)* 12.40 12.20 12.70 12.40 12.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 11.8 11.6 12.0 11.8 11.6
Time Drilling was Completed (am / pm) 8:02 AM 8:15 AM 8:30 AM 8:45 AM 8:55 AM
Time Concrete was Placed (am / pm) 11:06 AM ll:10AM 11:15 AM ll:ISAM 11:45 AM
Depth of Pier From Top of Concrete (ft) 12.20 12.10 12.50 12.20 12.10
Elevation: Surface (ft)** 99.53 99.43 99.53 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 87.13 87.23 86.83 87.13 87.23
Bearing Stratum (description) Tan, brown and gxay clay
Note: See Report #218973 for Compressive Strength Test Spemmens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Building XI
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar sub)ect matter provided by persons or conditions over which we have no control,
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 2t 8972
Project No.: 049245
Project: Freeport XI & Xl/ Date of Service: 9/22/2004
Page 4 of 10
Driller: Long Foundation
Pier Identification C-7 C-8 C-9 C- 10 C- 11
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (fl) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (fl) 12.20 12.30 12.20 12.70 12.10
Depth of Pier Alter Underreaming (it)* 12.20 12.30 12.30 12.70 12.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
qumber of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (fl) 11.5 11.5 11.7 12.0 11.5
Time Drilling was Completed (am / pm) 9:05 AM 9:14 AM 9:23 AM 9:31 AM 9:46 AM
Time Concrete was Placed (am / pm) 11:49 AM 11:54 AM 12:00 PM 12:06 AM 11:50 AM
Depth of Pier From Top of Concrete (fl) 12.00 12.10 12.20 12.50 12.00
Elevation: Surface (fl)** 99.53 99.53 99.43 99.53 99.43
Elevation: Top of Pier (fl)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (fl)** 87.33 87.23 87.13 86.83 87.33
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Building
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
:!uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 5 of 10
Driller: Long Foundation
Pier Identification C-12 C-13 C-14 E.9-14.4 E-9-13.9
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.50 12.40 12.10 12.70 12.70
Depth of Pier After Underreamlng (ft)* 12.50 12.40 12.20 13.00 12.90
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 11.8 11.8 11.5 11.0 10.8
Time Drilling was Completed (am / pm) 11:09 AM 11:20 AM II:30AM 1:05 PM 1:15 PM
Time Concrete was Placed (am / pm) 12:11 AM 12:15 PM 12:20 PM 1:15 PM 3:00 PM
Depth of Pier From Top of Concrete (ft) 12.30 12.20 12.00 11.40 11.20
Elevation: Surface (fi)** 99.53 99.53 99.53 99.60 99.70
Elevation: Top of Pier (fl)** 99.33 99.33 99.33 98.00 98.00
Elevation: Bottom of Pier (fl)** 87.03 87.13 87.33 86.60 86.80
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
,* Additional Penetration not requested unless noted. ** Elevation by Others.
[emarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided fur testing. We assume no responsibility for variation in
!uality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions ever which we have no control,
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 6 of 10
Driller: Long Foundation
Pier Identification E.9-9.6 E-9-9.3 E-9-6.6 E-9-6.3 E-9-2.1
Pier Diameter (in) 12" 12" 12" 12" 12"
Bell Diameter (in) 24" 24" 24" 24" 24"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 12.90 12.60 12.80 12.30 12.60
Depth of Pier After Underreaming (ft)* 13.20 12.80 13.10 12.80 12.70
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 4 / #5 4 / #5 4 / #5 4 / #5 4 / #5
Length of Reinforcing Steel (ft) 11.0 10.5 11.0 10.5 10.5
Time Drilling was Completed (am / pm) 1:26 PM 10:46 AM 10:57 AM 11:35 AM 11:49 AM
Time Concrete was Placed (am / pm) 3:04 PM 12:46 PM 12:52 PM 1:00 PM 1:19 PM
Depth of Pier From Top of Concrete (fl) 11.40 11.10 11.40 11.00 10.90
Elevation: Surface (ft)** 99.80 99.70 99.70 99.80 99.80
Elevation: Top of Pier (fi)** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 86.60 86.90 86.60 87.00 87.10
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subjec~ matter provided by persons or conditions over which we have no control
Our letters and reports are for the exclusive use of the clients to whom ~ey are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Real~y Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XI1 Date of Service: 9/22/2004
Page 7 of 10
Driller: Long Foundation
Pier Identification E-9-1.6 B - 14 B- 13 B- 12 B- 11
Pier Diameter (in) 12" 12" 12" 12" 12"
Bell Diameter (in) 24" 24" 24" 24" 24"
Required Minimum Depth (ft) Note 1 ]Note 1 Note i Note 1 Note 1
Depth of Pier Prior to Underreaming (fi) 12.40 12.00 12.10 12.20 12.50
Depth of Pier After Underreaming (ft)* 12.80 12.00 12.10 13.00 12.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
~lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Dian~eter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 4 / #5 4 / 4/5 4 / #5 4 / #5 4 / #5
Length of Reinforcing Steel (fi) 10.5 11.4 11.5 12.3 11.8
I'ime Drilling was Completed (am / pm) 2:50 PM 12:15 PM 12:18 PM 12:21 PM 12:26 PM
Time Concrete was Placed (am / pm) 3:30 PM 3:34 PM 3:45 PM 3:49 PM 2:30 PM
Depth of Pier From Top of Concrete (fi) 11.00 11.80 11.90 12.80 12.30
Elevation: Surface (fl)** 99.80 99.53 99.53 99.53 99.53
Elevation: Top of Pier (fi)** 98.00 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 87.00 87.53 87.43 86.53 87.03
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report//218973 for Compressive Strength Test Specimens.
~* Additional Penetration not requested unless noted. ** Elevation by Others.
[emarks: Building 321[
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control,
Our letters and reper~s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & X]I Date of Service: 9/22/2004
Page 8 of 10
Driller: Long Foundation
Pier Identification B-10 B-9 B-8 B-7 B-6
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (t~) 12.60 12.10 12.20 12.20 12.10
Depth of Pier After Underreaming (ft)* 12.60 12.30 12.20 12.20 12.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
'lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 12.0 11.5 11.5 11.5 11.5
Time Drilling was Completed (am / pm) 12:30 PM 12:37 PM 12:40 PM 12:51 PM 12:590pm
Time Concrete was Placed (am / pm) 2:34 PM 2:40 PM 2:44 PM 2:48 PM 2:54 PM
Depth of Pier From Top of Concrete (ft) 12.50 12.10 11.90 12.00 12.10
Elevation: Surface (ft)** 99.43 99.53 99.63 99.53 99.53
Elevation: Top of Pier (ft)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 86.83 87.23 87.43 87.33 87.23
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks: Building XI
.IMITATIONS: The test results presented herein were prepared based upon the specific samples pmvidefl for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
)ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full withou~ the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 9 of 10
Driller: Long Foundation
Pier Identification B-5 B-4 B-3 B-2 A.4-8.3
Pier Diameter (in) 24" 24" 24" 24" 24"
Bell Diameter (in) 48" 48" 48" 48" 48"
Required Minimum Depth (fi) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (fi) 12.40 15.10 14.40 14.60 13.00
Depth of Pier After Underreaming (ft)* 12.40 15.10 14.40 15.00 13.00
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6 / #6 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinfoming Steel (fi) 11.8 14.5 13.8 14.3 12.3
Time Drilling was Completed (am / pm) 1:08 PM 1:17 PM 1:24 PM 1:32 PM 12:54 PM
Time Concrete was Placed (am / pm) 3:05 PM 3:09 PM 3:14 PM 3:20 PM 3:25 PM
Depth of Pier From Top of Concrete (ft) 12.20 15.00 14.30 14.80 12.80
Elevation: Surface (ft)** 99.53 99.43 99.43 99.53 99.53
Elevation: Top of Pier (fi)** 99.33 99.33 99.33 99.33 99.33
Elevation: Bottom of Pier (ft)** 87.13 84.33 85.03 84.53 86.53
Bearing Stratum (description) Tan, brown and gray clay
Note: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc } or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 218972
Project No.: 049245
Project: Freeport XI & XII Date of Service: 9/22/2004
Page 10 of 10
Driller: Long Foundation
Pier Identification A.4-8.1 F-14.5 F-13.8 F-12.6 F-12.1
Pier Diameter (in) 18" 24" 24" 24" 24"
5ell Diameter (in) 36" 48" 48" 48" 48"
Required Minimum Depth (ft) Note 1 Note 1 Note 1 Note 1 Note 1
Depth of Pier Prior to Underreaming (ft) 14.10 11.30 11.50 11.70 11.40
Depth of Pier After Underreaming (ft)* 14.30 11.30 11.50 11.80 11.40
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 5 / #5 6 / #6 6 / #6 6 / #6 6 / #6
Length of Reinforcing Steel (ft) 13.5 10.8 11.0 11.4 10.8
l'ime Drilling was Completed (am / pm) 1:06 PM 2:40 PM 2:49 PM 3:00 PM 3:13 PM
Time Concrete was Placed (am / pm) 3:28 PM 3:40 PM 3:45 PM 3:49 PM 3:55 PM
Depth of Pier From Top of Concrete (ft) 14.10 11.20 11.40 11.80 11.30
Elevation: Surface (ft)** 99.53 98.10 98.10 98.00 98.10
Elevation: Top of Pier (ft)** 99.33 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 85.23 86.80 86.60 86.20 86.70
Bearing Stratum (description) Tan, brown and gray clay
'Jote: See Report #218973 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. ** Elevation by Others.
Remarks:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vadafion in
quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.