Loading...
Freeport NIP(8.0)-LR040930neers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Report No.: 219091 Project No.: 049245 Date of Service: 09/23/2004 Report Date: 09/30/2004 Services: Drilled Pier Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Extranet (1) City of Coppell (1) City of Coppell 6:30am - 3:30pm CMT Operations Manager LLMITAT1ONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99SS RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219091 Project No.: 048245 Project: Freeport XI & XII Date of Service: 9/23/2004 Coppell, Texas Page 2 of 6 Driller: Long Foundation Pier Identification F-11.5 F-I 0.9 F-9.8 F-9.2 F-8.6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 60 60 60 60 60 Required Minimum Depth (it) Note 1 Depth of Pier Prior to Underreaming (ft) 14.20 13.90 13.60 13.00 12.70 Depth of Pier After Underreaming (it)* 14.20 13.90 13.60 13.30 13.10 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (it) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 13.8 13.2 13.0 13.0 12.5 Time Drilling was Completed (am / pm) 8:00 AM 8:15 AM 8:30 AM 8:48 AM 9:05 AM Time Concrete was Placed (am / pm) 9:25 AM 9:30 AM 9:34 AM 9:40 AM 10:35 AM Depth of Pier From Top of Concrete (it) 14.20 13.80 13.50 13.40 13.10 ~levation: Surface (ft)* * 98.00 98.10 98.10 97.90 98.00 Elevation: Top of Pier (fl)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (fi)** 83.80 84.20 84.50 84.60 84.90 Bearing Stratum (description) Tan Brown and Gray Clay Note: See Report//219092 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. * * Elevation by Others. Remarks: Note 1: No minimum penetration due to variable sand elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, pertormance, etc ) or any other feature of similar subject matler provided by persons or conditions over which we have no control. Our lette*s and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219091 Project No.: 048245 Project: Freeport XI & XII Date of Service: 9/23/2004 Coppell, Texas Page 3 of 6 Driller: Long Foundation Pier Identification F-8 F-6.8 F-6.2 F-5.1 F-4.5 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 60 60 60 60 60 Required Minimum Depth (ft) Note 1 Depth of Pier Prior to Underreaming (ft) 12.80 13.30 12.50 14.00 14.00 Depth of Pier After Underreaming (ft)* 13.00 13.30 12.70 14.10 14.20 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA qumber of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 12.5 12.8 12.2 13.6 13.7 Time Drilling was Completed (am / pm) 9:20 AM 9:36 AM 10:00 AM I0:15 AM 10:36 AM Time Concrete was Placed (am / pm) 10:39 AM 10:44 AM 10:50 AM 11:20 AM 11:26 AM Depth of Pier From Top of Concrete (ft) 13.00 13.30 12.70 14. l 0 14.20 Elevation: Surface (ft)** 98.00 98.00 98.00 98.00 98.00 Elevation: Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft)** 85.00 84.70 85.30 83.90 83.80 Bearing Stratum (description) Tan Brown and Gray Clay Note: See Report #219092 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. ** Elevation by Others. Remarks: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wTitten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Really Services, LP Report No.: 219091 Project No.: 048245: Project: Freeport XI & XII Date of Service: 9/23/2004 Coppell, Texas Page 4 of 6 Driller: Long Foundation Pier Identification F-3.9 F-3.4 F-2.2 F-1.5 F-1 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 60 60 60 60 60 Required Minimum Depth (fl) Note 1 Depth of Pier Prior to Underreaming (fi) 14.10 14.00 12.30 12.70 11.50 Depth of Pier After Underreaming (fi)* 14.50 14.00 12.30 13.00 12.10 Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fl) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 14.0 13.7 11.8 12.7 11.6 Time Drilling was Completed (am / pm) 10:44 AM 10:04 AM 9:44 AM 12:10 PM 12:31 PM Time Concrete was Placed (am / pm) 11:30 PM 11:31 AM 11:35 AM 1:20 PM 1:28 PM Depth of Pier From Top of Concrete (fl) 14.50 14.20 12.30 13.20 12.10 Elevation: Surface (fl)** 98.00 97.80 98.00 97.80 98.00 Elevation: Top of Pier (ti)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (fi)** 83.50 83.80 85.70 84.80 85.90 Bearing Stratum (description) Tan Brown and Gray Clay qote: See Report #219092 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. ** Elevation by Othem. Remarks: IMITAT~ONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Dur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219091 Project No.: 048245 Project: Freeport XI & XII Date of Service: 9/23/2004 Coppell, Texas Page 5 of 6 Driller: Long Foundation Pier Identification D.5-1 C.8-1 C-1 B.3-1 A.5-1 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 60 60 60 60 60 Required Minimum Depth (ft) Note 1 Depth of Pier Prior to Underreaming (fl) 12.00 12.00 12.40 9.00 8.40 Depth of Pier After Underreaming (fi)* 12.00 12.50 13.10 9.30 8.40 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 11.6 12.0 13.0 9.0 8.4 Time Drilling was Completed (am / pm) 10:31 AM 11:30 AM 11:45 AM 12:49 PM 1:18 PM Time Concrete was Placed (am / pm) 1:33 PM 1:40 PM 2:53 PM 2:43 PM 2:34 PM Depth of Pier From Top of Concrete (fi) 12.00 12.50 13.50 9.50 8.90 Elevation: Surface (ft)** 96.00 95.00 93.60 93.80 92.50 Elevation: Top of Pier (fi)** 96.00 95.00 94.00 94.00 93.00 Elevation: Bottom of Pier (fi)** 84.00 82.50 80.50 84.50 84.10 Bearing Stratum (description) Tan Brown and Gray Clay Note: See Report//219092 for Compressive Strength Test Specimens. * Additional Penelration not requested unless noted. ** Elevation by Others. Remarks: LIMITATIONS: The test results presented herein were prepared based upon the sPeCific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 219091 Project No.: 048245 Project: Freeport XI & XII Date of Service: 9/23/2004 Coppell, Texas Page 6 of 6 Driller: Long Foundation Pier Identification A-1.5 Pier Diameter (in) 24 Bell Diameter (in) 60 Required Minimum Depth (ft) Note 1 Depth of Pier Prior to Underrearning (fl) 8.00 Depth of Pier After Underreaming (ft)* 9.00 Condition of Bottom (wet / dry) Dry Plumb Within Tolerance (yes / no) Yes Casing Diameter (in) / Casing Length (It) NA Number of Bars / Reinfoming Bar Size (#) 6/#6 Length of Reinforcing Steel (ft) 10.5 Time Drilling was Completed (am / pm) 1:30 PM Time Concrete was Placed (am / pm) 2:25 PM Depth of Pier From Top of Concrete (ft) 11.00 Elevation: Surface (fi)** 93.00 Elevation: Top of Pier (ft)** 95.00 :~tevation: Bottom of Pier (fl)** 84.00 Bearing Stratum (description) Tan Brown and Gray Clay Note: See Report #219092 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. ** Elevation by Others. Remarks: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RoneEng!neers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: {214) 630-9745 IN-PLACE DENSITY TESTING Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Services: Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 219177 Project No.: 049245 Date of Service: 09/23/2004 Report Date: 09/30/2004 CONTRACTOR: Duke Construction Test Methods: ASTM D-2922 ASTM D-3017 PROJECT DATA Gauge: Troxler 3430 Moisture Gauge Serial No: 35519 Current: 684 Test Mode: DT Previous: 686 Standard Counts Density Current: 2952 Previous: 2934 No. Description Brown Silty Sandy Clay MOISTURE DENSITY RELATIONS Maximum Moisture % DensiW pcf 20.0 103.0 Project Requirements Moisture Density Optimum +4 95 min FIELD DENSITY TESTS TEST LOCATION TEST PROBE NO DEPTH Utility backfill 1 Water line, Building 12, 69' north of 6" 1 southeast comer, final Utility backfill 2 Water line, Buiding 12, 30' west of 6" 1 northeast comer, final Utility backfill 3 Water line lead-in, Building 11, 70' west of 6" 1 northwest comer, final Utility backfill 4 Water line lead-in, Building 11,150' north 6" 1 of southwest comer, final Utility backfill 5 Water line lead-in, Building 12, 100' south 6" 1 of northwest comer, final M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcO (pcfl (% max) 22.5 123.7 101.0 98 23.4 124.0 100.5 98 23.8 122.4 98.9 96 23.7 122.7 99.2 96 22.7 122.7 100.0 97 LLMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Pace 1 of 2 Report No.: 219177 Project No.: 049245 Client: Duke Realty Services, LP Technician: Doyle Mackey Report Distribution: (1) Duke Realty Se~'ices, LP (l) Extranet (1) City of Coppell (1) City of Coppell K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contzol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Page 2 of 2 ;rs 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF PIER INSPECTION CANCELLATION Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XII Coppell, Texas Services: Pier Inspection Cancellation Report No.: 219212 Project No.: 049245 Date of Service: 09/24/2004 Report Date: 09/30/2004 Report of Cancellation On this date a Rone Engineers, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing/inspection was cancelled for the day. Technician Time: Page 1 of 1 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Extranet (1) City of Coppell (1) City of Coppall 9:45am Rone Engineers, Ltd. CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject ma~ter provided by persons or conditions over which we have no control. Our leners and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the w~lten approval of Rone Engineers, Ltd. Pa~e 1 of I RoneEn glneers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Port Worth, TX 76118 6300 Rothway, Sle. 150, Houston, TX 77040 Corporate Phone: (214l 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Mr. Brian Srraley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Report No.: 218973 Project No.: 049245 Date of Service: 09/22/2004 Report Date: 09/30/2004 Project: Freeport XI & XII Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): A1R (%): TEST METHOD: CONTRACTOR: Duke Construction CONCRETE SUPPLIER: Southern Star PLANT: 27 SPEC1PICATION REQUIREMENTS 3000 psi ~ 28 Days 5"-?" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 M1X DESIGN I.D.: 9337 PLACEMENT DATE: 09/22/2004 WEATHER CONDITIONS: Clear TIME SAMPLED: ll:10am BATCHTIME: NA TEMPERATURE (F)-Am 84 P CONCRETE: 86 F TRUCK NO: 1020 TICKET NO: 362617 AIR CONTENT (%): NA UNIT WE1GHT (pcf): OVERALL pLACEMENT LOCATION: Piers, see report g218972 SLUMP (inches) 6.25 SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" C-2/C-3/C-4 MAXIMUM COMPRESSIVE CYLINDER MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 09/29/2004 7 6.00 28.26 103260 3650 Unbonded Cap 1 2 10/20/2004 28 0.00 0.00 Unbonded Cap I 3 10/20/2004 28 0.00 0.00 Unbonded Cap 1 4 Hold See report ~218972 for technician time. Water added at site: 8 gallons LLMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no con~-ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. n~nc Page 1 ofl Technician: Rick Smith Report Distribution: (I) Duke Realty Services, LP ( 1 ) Exlranet (!) City of Coppell (1) City of Coppell Started: Finished: CMT Operations Manager