Loading...
Brighton Manor-CS041008 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Greg Jones, Chief Building Official Keith R. Marvin, P.E., CMl Engineer October 8, 2004 Partial Early Release for Brighton Manor Early release for building permits is being granted for Blocks A and C of Brighton Manor. Until the developer installs a drain system for the groundwater that impacts some of the lots in Block B, none of those lots are released at this time. When that drain system is inspected and accepted as operational, the lots in Block B will be released. Your office will be notified at that time. Final acceptance of the project is pending in this office. "CITY OF COPPEI.L ENGINEERING - EXCEI.LENCE BY DESIGN"