Thanks for the update.
I cannot wait to see the construction signs
Bob
Suzan Taylor wrote:
> Mr. Lommen The City of Coppell intends to reconstruct 4234 linear
> feet of Sandy Lake Road, from Kimbel Kourt to the east city limits.
> The existing two-lane asphalt roadway will be replaced with a
> four-lane divided, concrete roadway with improved storm drainage. The
> elevation of the road will be raised an average of four feet to remove
> the proposed roadway out of the flood plain. The projected schedule of
> the project is as follows:Advertise - October 22, 2004Bid opening -
> November 16, 2004City Council - December 7, 2004Construction Start:
> 1st Quarter 2005 Should you have any question or need any additional
> information, please advise. Suzan TaylorClP CoordinatorEngineering
> DepartmentDirect: 972-304-7019