Loading...
ST9302-CS001023 (2) MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To.' From: Date: RE: Jim Witt, City Manager Ken Griff'm, P.E., Dir. of Engineering/public Works October 23, 2000 Sandy Lake Road Project ST 93-02 Change Order #6 Attached to this memo is Change Order 06 in the amount of $22,590.48 for a structure to transition proposed drainage facilities beneath an existing 16" gas transmission llne that runs north/south in Moore Road and crosses Sandy Lake Road. During the design of Sandy Lake Road, it was assumed that the gas line would be relocated by TXU at their cost. However, about the time that the Sandy Lake Road project was bid in 1998, it was determined that TXU's easement superceded our right-of-way and therefore we would be responsible for the cost to lower the gas line. Attached to this memo, is a copy of an estimate from Lone Star Gas indicating that the cost to lower the transmission line would be approximately $318,700. Because of the expense to lower the gtas line and because it would be a City cost, other options were explored. The option addressed by this change order is one that I recommended. The $22,590.48 is substantially less than the $318,700 requested by TXU to lower their gasline. However, I have also received an invoice from TXU Lone Star Pipeline Company indicating that they are seeking reimbursement of $38,556.64 for their work involved with their original design to lower the gas line in 1998. There has been some conversation with TXU Lone Star Pipeline concerning that invoice, but at this time it appears likely that we will be required to pay that invoice. Therefore, our total cost involved with the gas line, inclusive of Change Order 06 and the invoice from TXU Lone Star Pipeline, is $61,147.12. This is $257,552.88 less than what it would have cost us to lower the gas line (approximately 19% of the cost to lower the gas line). Staff recommends the approval of Change Order 06 in the amount of $22,590.48 to build a transition structure near Moore Road/Sandy Lake Road to avoid relocating the 16" Lone Star gas main. I also will be processing the invoice from TXU in the $38,556.64 to Finance for payment. If you should have any questions or need additional clarification please contact me. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" CITY OF COPPELL CHANGE OR EXTRA WORK O ER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER: SAND Y LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL #6 DATE: 10/20/00 ADD: Item Quantity Unit Description Unit Price Total Price #38a 1 LS 66" traosition structure near Sta. 55+63 27,630.48 $27,630.48 DELETE: #38 28 LF 66" Class III RCP 180.00 ($5,040.00) TOTAL Addition $22,590.48 TOTAL CHANGE ORDER #6 $22,590.48 Previous Contract Amount Total Change Order #6 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $9,940,809.37 $ 22,590.48 $9,963,399.85 14 Days 1055 Days The contractor hereby accepts this contract adjustment as a rmal and complete adjustment in full accord and satisfaction of ali past and future liability originating under any clause in the Contract by reason for this revision to the Contract. Accepted by Owner Recommended [~y City Engineer Date Agreed to by Contractor Date · ',.l'ljt_ 13' '90 B~.=;~gPM KIM/~"~'HORll FT I&)RTH ~ P.6/11 Greg D. Saunders Kimley-Horn Engineers 801 Cherry Street, S-1100 Fort Worth, TX 76102-6803 m m RECEIVED JUL o 6 1998 KtMLE~-HORN Re: Line F/Il6&117 Sandy Lake Road improvements Coppell, Dallas Co. Dear Mr Saunders: Enclosed are three(3) copies of cost estimates and plans for the relocation of approximately 720 feet of 16-inch Line F, and abandonment of approximately 700 feet of existing 16-inch pipe. The total estimated cost for this alteration is $318,700.00. This estimate is subject to review after 60 days. Please note that due to the numerous construction obstructions, the estimate involves considerably greater distance and therefore much higher cost than would normally be the case(see the enclosed explanation sheet). Approval of the proposed pipeline route shown on the attached drawing is necessary prior to the start of construction by Lone Star Pipeline Company. Approval shall include confirmation Chat existing and proposed features along the proposed pipeline route are shown completely and correctly. Proposed and existing features shown, including land usage, grades, streets, drainage structures, water lines, storm sewers, etc., along the proposed pipeline route are based on the best information available Co Lone Star Pipeline Company. I~ the features shown are incorrect or new information is available, please advise as soon as possible so plans can be revised accordinglY. Should you wish to proceed with alteration of our facilities as shown on the attached drawings, please so indicate by signing the drawings next to the title block and return one approved copy to my attention. Please furnish this office authorization for reimbursement of the actual cost incurred on this project. When this authorization is received, scheduling of the work can proceed. Upon completion of the alteration work, you will be furnished P. O. ~ l.l~0~) l~l~s, ) 'T'l 'JUL 13 J98 ~:3~PM KI~ f~HOR~ FT WORTH P.7/11 an itemized invoice as to the actual cost incurred. If ¥o~ have any questions concerning our cost estimates and I will be happy :o discuss this matter in grea~er de~ail plans, with you at your convenience. Enclosures cc: C.P. Brown J.S. Knights T.W. Rudd F.B. Vinson Sincerely, David L. cromer Right of Way Agent OTXU TXU Business Services 300 South St. Paul Street Dallas, TX 75201 P.O. Box 139083 Dallas, TX 75313-3151 January 21, 2000 Kenneth M. Cu'iff'm, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019-0478 Re: Line F/116 Sandy Lake Road Dallas County Dear Mr. Griffin: Enclosed is our itemized Invoice No. LSP0020101 in the amount of $38,556.64. The amount represents the actual cost incurred for surveying, engineering and related expenses in preparation for a gas line relocation to accommodate the referenced road project. As you know, the relocation was ultimately not required due to a redesign by the City. Please have the paymem sent to my attention. We appreciate your cooperation. Contact me if you have any questions. Cordially, David L. Cromer, SR/WA Right of Way Agent 214-875-3085 :dlc CC: Jeff Knights Wes Rudd Jeff Hardgrave Tim Wernicke Dale Burton