Loading...
ST9302-CS001019FAXI(214) 352-3201 ~ ~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 October 19, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: In reference to the previously submitted price for the 66" transition structure near STA 55+63, our structure subcontractor has reviewed and reduced his price. Enclosed for your review is a copy of our basis of estimate cost sheets for your review. The revised lump sum price to construct the transition structure is $27,630.48. This work Will require that fourteen (14) calendar days be added to the contract. If you have any questions regarding this price, don't hesitate to contact our office. crely,o~ ,_~n Company · Weber Project Manager XC: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER CONTRACTOR'S BASIS OF ESTIMATE FOR ITF/~S TO BE ADDED BY SUPPLEMENTAL AGREF/~ENT PROJECT #: PROJECT: LIMITS: CITY: ST 93-02 SANDY LAKE ROAD DENTON TAP TO MACARTHUR CITY OF COPPELL WORK ITEM: TRANSITION STRUCTURE AT STA 55+63 ESTIMATED QTY: LS 1.000 LABOR CLASSIFICATION OPERATES HOURLY APPROX. TOTAL INDEX EQ. # RATE # HRS SUPERINTENDENT 1 $25.50 32 $816.00 FOREMAN 2 $22.00 64 $1,408.00 STRUCTURAL STEEL SETTER 3 $14.25 80 I $1,140.00 STRUCTURAL STEEL SETTER ~ $14.00 80 I $1,120.00 FORM SETTER $12.00 80 $960.00 FORM SETTER $11.00 80 $880.00 LABORER $10.00 80 $800.00 LABORER $9.50 80 $760.00 LABORER $9.50 80 $760.00 $o.oo o $o.oo $o.oo o $o.oo FOREMAN $22.00 4 $88.00 TRACK HOE OPERATOR $15.00 8 $120.00 COMPACTOR OPERATOR $10.75 4 $43.00 LOADER OPERATOR $12.00 8 $96.00 $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo TOTAL $8,991.00 PLUS LABOR BURDEN (TAXES, INSURANCE, ETC,) I 55.00% $4,945.05 TOTAL LABOR COSTS $13,936.05 SHEET 1 (LABOR) CONTRACTOR ' S FOR ITEMS TO BE ADDED BASIS OF ESTIMATE BY SUPPLEMENTAL AGREEMENT PROJECT PROJECT: LIMITS: CITY: ST 93-02 SANDY LAKE ROAD DENTON TAP TO MACARTHUR CITY OF COPPELL WORK ITEM: TRANSITION STRUCTURE AT STA 55+63 ESTIMATED QTY: LS 1.000 EQUIPMENT DESCRIPTION HOURLY APPROX. TOTAL EQ # RATE % HRS SUPERINTENDENT PICKUP 1 $12.11 32 $387.52 FOREMAN PICKUP 2 $9.84 64 $629.76 SERVICE TRUCK 3 $15.75 80 $1,260.00 $o.oo o $o.oo $o.oo o $o.oo TRACK HOE 4 $155.72 8 $1,245.76 COMPACTOR 5 $24.96 4 $99.84 LOADER 6 $48.57 8 $388.56 $o.oo o $o.oo $0.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo i' $o.oo $o.oo $o.oo TOTAL EQUIPMENT COSTS $4,011.44 RENTAL RATE BLUE BOOK = (MONTHLY RATE X ADJUST FACTOR X REGIONAL FACTOR) 176 + OPER COSTS SHEET 2 (EQUIP) CONTRACTOR'S BASIS OF ESTIMATE FOR ITEMS TO BE ADDED BY SUPPLEMENTAL AGREEMENT PROJECT #: PROJECT: LIMITS: CITY: ST 93-02 SANDY LAKE ROAD DENTON TAP TO MACARTHUR CITY OF COPPELL WORK ITEM: TRANSITION STRUCTURE AT STA 55+63 ESTIMATED QTY: LS 1.000 MATERIAL UNIT OF EST UNIT TOTAL MEASURE QTY PRICE CONCRETE CY 25.000 $69.00 $1,725.00 FORMS MATERIAL LS 1.000 $500.00 $500.00 STEEL LS 1.000 $750.00 $750.00 TRENCH BOXES (2 WEEKS) LS 1.000 $3,000.00 $3,000.00 0.000 $0.00 $0.00 0.000 $0.00 $0.00 0.000 $0.00 $0.00 $0.00 $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo $o.oo TOTAL MATERIAL COSTS $5,975.00 TOTAL COST OF LABOR, EQUIPMENT AND MATERIALS $23,922.49 PLUS INDIRECT COSTS (OVERHEAD, BOND, ETC.) 10.00% $2,392.25 PLUS PROFIT 5.00% $1,315.74 TOTAL COSTS OF ADDED ITEM i $27,630.48 UNIT PRICE I $27,630.48