Loading...
ST0301-CS041008 i*i*************CA~ RT LOT**B 090 ATTN: CITy ENGINEER 08/27/1992 OCTOBER 8, 2004 ~ANCH AND HACKBERRY CREEK SINCE ~ 984 VOLUME XX, NO. 41 Trees a COncern in W. Bethel Reconstruction ByJeanMu~h Coppell City Engineer Ken Griffin received input from the community Tuesday regarding planned reconstruction of W. Bethel Road in old downtown Coppell. Several dozen resi- dents, landowners and business owners from the old downtown area met to discuss planning is- sues, including design of the road and bridges, lighting, crosswalks for children, drain- age and sewer plans, and street banners. Salvaging trees, always an issue is Coppell, was a primary concern of participants. Grif- fin was asked to consider shift- ing the road further north to re- tain more trees on the south side or transplant existing trees. Concern was also voiced about whether amenities would extend to the Grapevine Creek bridge. The redesigned road will fall within the City's historical district, allowing flexibility to achieve the desired old Coppell look. Griffin also discussed the necessity of obtaining right-of- way from landowners and out- lined a plan providing "an offer letter from the City. Another meeting will be held in 2005. Participant Joe Shirley.brought along photographs to Il- lustrate his concern about possible loss of trees.