S.J. LOUIS CONSTRUCTION OF TEXAS LTl
520 Sou~fl 6th Ave., P.O. Box 834
Monsfield, Texas 76063
817/477~0320 O~e · 817/477..0552 Fax
Equal Opportunih/Employer / Contractor
September 15, 2004
Turner, Collie & Braden, Inc.
17300 Dallas Pkwy., Suite I010
Dallas_ Texas 75248
Attn: Erika Cooper, P.E.
Via Fax: (972) 735-3001
(3 pages total)
Re: Deforest Road Lift Station Improvements - Force Main Lines "A" & "B"
City of Coppell, Texas
In regards to your response to R.F.I. No. 7 for the above referenced pt'Picot, it is the
opinion of S.J. Louis that the TV inspecting of the 274 feet of 30" ~foree main as
described in your response should not be the responsibility of S.J. Louis Construction,
The Contract Documents do not support TVing on this project and thisI project is not
considered a subdivision and therefore, would not be covered under the City's
subdivision ordinance. The project specifications and/ or plans do not specify the
requirements for any type of testing necessary to demonstrate the proper joint assembly
and coating of field cuts. Proper joint assembly will be confirmed when the pipeline
passes a hydrostatic test, as required by our Contract. The project specifications allow
field cuts to be made to the proposed force main pipe as long as the cuts are recoated with
the proper materials. The recoating of these cut joints was done in accordance with the
Contract Documents and the coating of the field cuts should have been inspected by the
on-site City inspector.
If requested, S.J. Louis will furnish the City with an additional cost proposal representing
the TV inspection as mentioned above. We feel that the specifications are very clear in
stating the testing requirements and that this is why there are pay items for the hydrostatic
tests.
Should you have any questions or require additional information, please doI not hesitate to
call.
Regards
S.J. LOUIS CONSTRUCTION OF TEXAS LTD.
Estimator/Project Coordinator
DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
Force Main Line A&B R~*I No. 7
Response Date: September 10, 2004
TCB Project n~. 052.131124.000 !.04000A 103
TCB has discussed the TV inspection of'Lines A and B with the City of Copp¢l!. Thc Ci~'s
subdivision ordinance requires that all sani~ry sewer force maim be televised aiter
installation. In lieu of televising Lines A and B in their entirety, S.J. Louis sho~lld televise a
representative section o f Line B flora the air vacuun'dair release valve at 5ta. 6~-39.03 north
to the connection to Line C (Sra. 9~-I 1.13), and from the air vacuum/air rel¢~e yalve south
thc first 22.50 bend (Sra. 6+37.12). Inspection of this 274-£oot section of Line B will be used
to con/ia proper joint a~sernbly and coating of field cuts, The CRy will consider this
portion of Line B representative of the rerrainder of Line B and all of Linc A. l£it is
confirm¢cl 5hal this represc,-ntativo section w~ installed in compliance with the dontract
documents, no further television inspection will be required.
If you have a~y'further questions, please feel ffec to contact Rick O'DelI at 972-304-7090.
CC;
Rick O'Dell, Project Ir~pec"tor- C-'iv/of Coppcll
Gveg Hooten - TCB
Request For Information (RFI)
Deforest Rd, Lff~ Stztion Improvements - Force Main
Lines "A" & "B" - .
E~ Ccop~, P.E. ~
17300 D~ P~y., Suite 1010
D~I~, T~ 7~248
7104
This K.F.I. ia in regards to the requests of the City of Coppell, Texas for thc TV insp~ctlon of the force main
lines on the above referenced project. It is our understanding that the Contract Documents do not require and/
or specify a TV inspcc'.ion of'he proposed force main pipes. Please conlirrn that ~bis i,~ accurate and also please
inform ~c City of your position, i
Please respond 1o this R.Fi. at your earliest convenience. Your help ii greatly appreciated.
~ V. Whitmlm. SJ. Loui~ Corallmction of Texa~ Ltd.,
File 14014.3