Loading...
SS9901-CS040914 972 735 3002 SER 14 2004 09:20 FR TURNER COLLIE~ BRADEN972 735 3002 TO 99723043570 R.01/03 Turner Collie Braden Inc Engineers * Planners · Project Managers 17300 Dallas Parkway Suite 1010 Daltas, Texas 75248 972-7;~5-3000 Fax: (972) 735-3001 REMARKS: Rick, Attached is a copy of the response to RFI No. 9 sent to S.J. Louis. Please feel free to call me at 972-735-3056 if you have any questions. Thanks, Erika Cooper An AECOM Company SEP 14 2004 09:20 FR TURNER COLLIE& BRADENg?2 ?~5 5002 TO 9972504~570 P.0270~ Request For Information (RFI) Deforest Rd. Lift Station Improvements - Force Main Lines "A" & "B" Erika Cooper, P.E. Turner, Collie & Braden, Inc. 17300 Dallaz Pkwy., Suite 1010 Dallas, Texas 75248 Fax: (972) 7.35-3001 Adam Lu.~z ford Estimator/Proj~t Coordinator 9/t 3/04 This R.F.I. is in regards to the location of thc end of the proposed 20" force main for the above ret'~enced project. On sheet #39 of the conslruetion plans, the proposed location of thc end of our 20" force main is at Sta. 47-65. The exbting 20" force main that our line is to be connected to "by others" wa~ to sta.n at Sra. 47+72.68. It was discovered that thc location of the existing 20" force main is not in the same locatiori as shown on thc plans and that its actual !ocation is at Sra, 48+27. Please authorize "in writing" the installation of approximatel 60 additional feet of 20 force main pipe "as directed" by the City inspector. This would change our ending station for Line "A" ~o S/a, 48*25. This work would be done at our existing contract unit prices. Please confirm "in writing" your acceptance o£ our proposal as soon az possible. Please respond to this R.F.I. at your earliest convenience. Your help is greatly appreciated. Les V. Whitman, SJ. Louia Construction of Texas Ltd., LLP File la016.3 Louis CanstrttVtiott of Teze~z, £t,I, ILl' P.O. Box 854 Mansfield, ~'ectas 76065 7) 477-05~0 Office (817) ~77-055~ gar TOTAL P,OI SEP 14 2004 09:20 FR TURNER COLLIE& BRADENg?2 ?35 3002 TO 99?230435?0 P.03×03 DeForest and Sandy Lake Wastewater Lift Stations and Force Main Improvements Force Main Line A&B RFI No. 9 Response Date: September 14, 2004 TCB Pmject no. 052.131124.0001.04000A 103 The installation of approximately 60 linear feet (LF) of additional 20-inch ductile iron pipe at the end of Line A (from Sra. 47+65 to Sta. 48+25), as directed by the City inspector, is authorized. This work will be done at the existing contract unit prices. Note that the City does expect a credit change order for the combination sewage air vacuum/air release valve not installed and for the two trees that were not bored under. If you have any further questions, please feel free to contact Rick O'Dell at 972-304-7090. Rick O'Dell, Project Inspector - City of Coppell Greg Hooten - TCB TOTAL PAGE.03 **